Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Titan Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Titan Explorer Mission Utilizing Solar Electric Propulsion and Chemical Propulsion Systems

Mission and Systems analyses were performed for a Titan Explorer Mission scenario utilizing medium class launch vehicles, solar electric propulsion system (SEPS) for primary interplanetary propulsion, and chemical propulsion for capture at Titan. An examination of a range of system factors was performed to determine their affect on the payload delivery capability to Titan. The effect of varying the launch vehicle, solar array power, associated number of SEPS thrusters, chemical propellant combinations, tank liner thickness, and tank composite overwrap stress factor was investigated. This paper provides a parametric survey of the aforementioned set of system factors, delineating their affect on Titan payload delivery, as well as discussing aspects of planetary capture methodology.

Cupples, Michael

Project Cassini - A potential collaborative ESA/NASA Saturn Orbiter and Titan Probe mission

Project Cassini is concerned with a potential collaborative mission to Saturn and Titan. The project has been the subject of a joint ESA/NASA Technical Assessment Study from April 1984 to July 1985. The spacecraft consists of a Saturn Orbiter and a Titan entry Probe. Science objectives with respect to Titan include a determination of the abundances of atmospheric constituents and isotope ratios, a study of the distribution of trace gases, cloud physics, and a determination of the state of the surface. Other science objectives are related to Saturn, the rings, icy satellites, the magnetosphere of Saturn, and asteroids. Attention is given to mission design, the spacecraft, and future prospects.

Beckman, J.

VIMS/Cassini mission at Titan: Scientific objectives and observational scenarios

The scientific objectives and observational scenarios of the Cassini/Visual Infrared Mapping Spectrometer (VIMS) Mission at Titan are addressed. The VIMS represents a powerful and effective means to both investigate, in four dimensions (latitude, longitude, altitude, and time), Titan's atmospheric structure and to map the near infrared spectral character of Titan's surface. Its broad spectral coverage from 0.35 to 5.1 micrometers together with its significant spectral resolution allows it to determine minor constituent distributions and cloud optical/microphysical properties from the surface to several hundred km. A promising means of obtaining high vertical resolution stratospheric profiles of hydrocarbons, oxides, and hazes via stellar occultation observations is discussed.

Baines, Kevin H.

THUNDER: A Titan orbiter mission concept for the New Frontiers program designed at the JPL Planetary Science Summer School

Saturn’s moon Titan is an enigmatic icy world whose surface is constantly modified by its active, Earthlike precipitation system. Here, we propose the THUNDER (Titan’s Hydrocarbons: Uncovering New Dimensions of Evolutionary pRocesses) mission concept to investigate how Titan’s surface reflects the nature of its interior and its active hydrocarbon cycle. This mission will change our understanding of Titan’s surface through three science objectives: characterizing the heat and material transport properties of Titan’s icy outer layer, tracing surface liquid storage through and across the crust, and assessing the total hydrocarbon budget through time. This New Frontiers-class mission, designed as part of the Jet Propulsion Laboratory (JPL) Planetary Science Summer School, responds directly to the call for a Titan orbiter in the NASA Planetary Science and Astrobiology Decadal Survey 2023-2032. THUNDER’s focused geology and geophysics mission could achieve full surface mapping to complement both the Cassini-Huygens and Dragonfly missions using gravity science, radar with three operational modes, and a visible-to-infrared spectrometer. These instruments together could give us the first look at Titan as a fully connected and geologically active world , revolutionizing our understanding of icy bodies, fluvial and atmospheric processes, and habitability across geologic time. Here, we summarize goals of the science mission and engineering approaches, as well as challenges and future directions to study before THUNDER can become a viable mission concept.

mission concept

Titan Explorer mission trades from the perspective of aerocapture

A detailed Titan aerocapture systems analysis and spacecraft design study was performed as part of NASA's In-Space Propulsion Program. The primary objective was to engineer a point design based on blunt body aeroshell technology and quantitatively assess feasibility and performance. This paper reviews the launch vehicle, propulsion, and trajectory options to reach Titan in the 2010-2015 time frame using aerocapture and all-propulsive vehicles. It establishes the range of entry conditions that would be consistent with delivering a 360 kg entry vehicle plus a 580 kg orbiter to Titan. Results show that inertial entry velocities in the range of 5.3 to 6.6 kmls are to be expected for chemical and solar electric propulsion options with Venus and/or Earth gravity assists. Trip times range from approximately 6 years for aerocapture orbiters to 8-11 years for all-propulsive vehicles. In addition to trip time reduction, the use of aerocapture enables the mission with a Delta 4450 class launch vehicle as opposed to an all-propulsive orbit insertion approach, which requires a Delta IV heavy or Titan IV class launch vehicle.

Bailey, Robert W.

Titan Ice and Dust Experiment (TIDE): Detection and Analysis of Compounds of Interest to Astrobiology in the Lower Atmosphere and Surface of Titan

The Titan Orbiter Aerorover Mission (TOAM) is a proposed concept for the Solar System Exploration Visions Mission, Titan Explorer, a follow-on to the Cassini-Huygens mission. TOAM would use a Titan polar orbiter and a lighter-than-air aerorover to investigate the surface and atmosphere of Titan. Astrobiology issues will be addressed though TOAM investigations including, for example: Distribution and composition of organics (atmospheric, aerosol, surface); Organic chemical processes, their chemical context and energy sources; and Seasonal variations and interactions of the atmosphere and surface. The TIDE instrument will perform in-situ analyses to obtain comprehensive and sensitive molecular and elemental assays of volatile organics in the atmosphere, oceans and surface. TIDE chemical analyses are conducted by a Gas Chromatograph-Ion Mobility Spectrometer (GC-IMS). This TIDE GC-IMS was a component of the mini-Cometary Ice and Dust Experiment (mini-CIDEX) developed for the chemical analysis of a cometary environment. Both the GC and helium IMS of mini-CIDEX have been further developed to better meet the analytical and operational requirements of the TOAM. application. A Micro-ElectroMechanical System (MEMS) GC and Mini-Cell helium IMS are under development to replace their respective mini-CIDEX components, providing similar or advanced analytical capabilities.

Kojiro, Daniel R.

Connecting Atmospheric Science and Atmospheric Models for Aerocaptured Missions to Titan and the Outer Planets

Many atmospheric measurement systems, such as the sounding instruments on Voyager, gather atmospheric information in the form of temperature versus pressure level. In these terms, there is considerable consistency among the mean atmospheric profiles of the outer planets Jupiter through Neptune, including Titan. On a given planet or on Titan, the range of variability of temperature versus pressure level due to seasonal, latitudinal, and diurnal variations is also not large. However, many engineering needs for atmospheric models relate not to temperature versus pressure level but atmospheric density versus geometric altitude. This need is especially true for design and analysis of aerocapture systems. Aerocapture drag force available for aerocapture is directly proportional to atmospheric density. Available aerocapture "corridor width" (allowable range of atmospheric entry angle) also depends on height rate of change of atmospheric density, as characterized by density scale height. Characteristics of hydrostatics and the gas law equation mean that relatively small systematic differences in temperature-versus-pressure profiles can integrate at high altitudes to very large differences in density-versus-altitude profiles. Thus a given periapsis density required to accomplish successful aerocapture can occur at substantially different altitudes (approx. 150 - 300 km) on the various outer planets, and significantly different density scale heights (approx. 20 - 50 km) can occur at these periapsis altitudes. This paper will illustrate these effects and discuss implications for improvements in atmospheric measurements to yield significant impact on design of aerocapture systems for future missions to Titan and the outer planets. Relatively small- scale atmospheric perturbations, such as gravity waves, tides, and other atmospheric variations can also have significant effect on design details for aerocapture guidance and control systems. This paper will also discuss benefits that would result from improved understanding of Titan and outer planetary atmospheric perturbation characteristics. Details of recent engineering-level atmospheric models for Titan and Neptune will be presented, and effects of present and future levels of atmospheric uncertainty and variability characteristics will be examined.

Justus, C. G.

Mini-Brayton heat source assembly design study. Volume 2: Titan 3C mission

Major conclusions of the space shuttle heat source assembly study are reported that project a minimum weight design for a Titan 3 C synchronous orbit mission; requirements to recover the heat source in orbit are eliminated. This concept permits location of the heat source end enclosure supports and heat source assembly support housing in a low temperature region external to the insulation enclosure and considers titanium and beryllium alloys for these support elements. A high melting insulation blanket consisting of nickel foil coated with zirconia, or of gold foil separated with glass fiber layers, is selected to provide emergency cooling in the range 2000 to 2700 F to prevent the isotope heat source from reaching unsafe temperatures. A graphic view of the baseline heat source assembly is included.

Source record

SEP Mission to Titan NEXT Aerocapture In-Space Propulsion (Quicktime Movie)

The ion thruster is one of the most promising solar electric propulsion (SEP) technologies to support future Outer Planet missions (place provided link below here) for NASA's Office of Space Science. Typically, ion thrusters are used in high Isp- low thrust applications that require long lifetimes, as well as, higher efficiency over state-of-the-art chemical propulsion systems.Today, the standard for ion thrusters is the SEP Technology Application Readiness (NSTAR) thruster. Jet Propulsion Laboratory's (JPL's) extended life test (ELT) of the DS 1 flight spare NSTAR thruster began in October 1998. This test successfully demonstrated lifetime of the NSTAR flight spare thruster, which will provide a solid basis for selection of ion thrusters for future Code S missions. The NSTAR ELT was concluded on June 30,2003 after 30,352 hours. The purpose of the Next Generation Ion (NGI) activities is to advance Ion propulsion system technologies through the development of NASA's Evolutionary Xenon Thruster (NEXT). The goal of NEXT is to more than double the power capability and lifetime throughput (the total amount of propellant which can be processed) while increasing the Isp by 30% and the thrust by 120%.

Baggett, Randy

Titan Orbiter Aerorover Mission

We propose a combined Titan orbiter and Titan Aerorover mission with an emphasis on both in situ and remote sensing measurements of Titan's surface, atmosphere, ionosphere, and magnetospheric interaction. The biological aspect of the Titan environment will be emphasized by the mission (i.e., search for organic materials which may include simple organics to 'amono' analogues of amino acids and possibly more complex, lightening detection and infrared, ultraviolet, and charged particle interactions with Titan's surface and atmosphere). An international mission is assumed to control costs. NASA will provide the orbiter, launch vehicle, DSN coverage and operations, while international partners will provide the Aerorover and up to 30% of the cost for the scientific instruments through collaborative efforts. To further reduce costs we propose a single PI for orbiter science instruments and a single PI for Aerorover science instruments. This approach will provide single command/data and power interface between spacecraft and orbiter instruments that will have redundant central DPU and power converter for their instruments. A similar approach could be used for the Aerorover. The mission profile will be constructed to minimize conflicts between Aerorover science, orbiter radar science, orbiter radio science, orbiter imaging science, and orbiter fields and particles (FP) science. Additional information is contained in the original extended abstract.

Sittler Jr., E. C.

NASA's 2004 In-Space Propulsion Refocus Studies for New Frontiers Class Missions

The New Frontiers (NF) program is designed to provide opportunities to fulfill the science objectives for top priority, medium class missions identified in the Decadal Solar System Exploration Survey. This paper assesses the applicability of the In-Space Propulsion s (ISP) Solar Electric Propulsion (SEP) technologies for representative NF class missions that include a Jupiter Polar Orbiter with Probes (JPOP), Comet Surface Sample Return (CSSR), and two different Titan missions. The SEP technologies evaluated include the 7-kW, 4,100-second NASA's Evolutionary Xenon Thruster (NEXT), the 3-kW, 2,700-second Hall thruster, and two different NASA Solar Electric Propulsion Technology Readiness (NSTAR) thrusters that are variants of the Deep Space 1 (DS1) thruster. One type of NSTAR, a 2.6-kW, 3,100-second thruster, will be the primary propulsion system for the DAWN mission that is scheduled to launch in 2006; the other is an "enhanced", higher power variant (3.8-kW, 4,100-second) and is so-called because it uses NEXT system components such as the NEXT power processing unit (PPU). The results show that SEP is applicable for the CSSR mission and a Titan Lander mission. In addition, NEXT has improved its applicability for these types of missions by modifying its thruster performance relative to its performance at the beginning of this study.

Witzberger, Kevin E.

The Huygens Mission at Titan: Results Highlights

After a 7-year interplanetary journey onboard the Cassini Orbiter, the Huygens Probe was released on 25 December at 02:00 UTC. It entered in the atmosphere of Titan on 14 January at about 09:06 UTC. Following the 4-min entry, 3 parachutes were deployed in sequence. The descent under parachute lasted slightly less than 2 1/2 hours. After a soft landing at about 5 m/s, the probe continued to function for several hours on the surface. During the descent under parachute and on the surface, Huygens transmitted its data at 8 kbps on two redundant channels to the over-flying Orbiter which approached Titan at a closest distance of 60000 km about 1/2 hour before landing. Data were successfully received only on one channel due to a configuration error of the receiver of the channel which was driven by the ultra-stable oscillators (USO) of the Doppler Wind Experiment (DWE). The Orbiter received data during the descent under parachute and for 72 minutes on the surface until its path moved it outside the beam of the transmitting antennas of the probe resting on the surface and at the same time as the Orbiter went below the Horizon. Additional information is included in the original extended abstract.

Lebreton, J.-P.