Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Pilot Unit Testing at NCCC of Sorbent based CO2 Capture

TDA Research, Inc. is developing a new CO2 sorbent (alkalized alumina) technology for post-combustion CO2 capture. In this DOE sponsored project (DE-FE0012870), TDA constructed a pilot-scale skid, which was installed and tested at National Carbon Capture Center (NCCC). It was designed to process coal derived flue gas equivalent to 0.5 MWe of power generation. The pilot test data shows that TDA’s process can achieve 90% capture rate and 95% CO2 purity (the performance target) for both coal and natural gas (NG) flue gases. The techno-economic analysis (TEA) for a 550-MWe supercritical coal fired power plant with CO2 capture shows that the capture cost for TDA’s process is $34.9/tonne CO2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12 (an amine solvent technology).

20 FOSSIL-FUELED POWER PLANTS↗

Effects of carbon treating on piperazine oxidation in pilot plant testing of PZAS™

From February to June 2019, a pilot plant campaign was run for 2100 h at the National Carbon Capture Center (NCCC) using moderately degraded 5 m PZ with simulated flue gas equivalent to a 0.64 MW natural gas combined cycle. Piperazine with the Advanced Stripper™ (PZAS™) and a baghouse were used, and N 2 sparging was applied at the bottom of the absorber. A carbon bed was activated and showed beneficial effects in removing degradation products and reducing the oxidation rate. The cumulative NH 3 production was 180 mmol/k, indicating a PZ oxidation rate of 0.07 mmol/kg/h (0.3 kg PZ/tonne of CO 2 ). The total formate before turning on the carbon bed was 41 mmol/kg, and the total Fe was 0.1 mmol/kg. Carbon treating reduced NH3 production from 0.1 mmol/kg/h to 0.056 mmol/kg/h after 400 h of operation, reduced the UV-Vis absorbance of the samples at 320 nm, and caused a decrease of dissolved Cr. Bench-scale experiments were performed using the NCCC solvent and the same type of carbon. In bench-scale experiments, the UV-Vis absorbance and the concentration of Fe, Mn, and Cr all decreased. Finally, a linear equilibrium relationship was observed between the UV-Vis absorbance and the carbon loading.

03 NATURAL GAS↗

Coal direct chemical looping process: 250 kW pilot-scale testing for power generation and carbon capture

Chemical looping combustion (CLC) is an energy conversion technology that can produce concentrated CO 2 stream without the need for a gas separation step, and thus, has the potential to drastically reduce the energy consumption and cost associated with CO 2 capture in power generation. The coal-direct chemical looping (CDCL) process is a CLC technology that uses a moving bed reducer configuration that can directly consume coal as a feedstock without requiring an upstream gasification step. An integrated 250 kW th CDCL pilot unit using iron-based oxygen carriers was constructed and demonstrated for over 1000 h of testing. The principles for the CDCL pilot unit design and operation are summarized in this article. During the 288-hour continuous operation testing, the CDCL pilot unit achieved >96% coal conversion with a CO 2 purity of >97%. Low carbon carryover into the combustor, i.e. <2%, was also confirmed during the test, which shows the capability of the moving bed reactor to retain and convert coal using the oxygen available on the iron-based oxygen carrier. The results from the pilot unit testing confirms the CDCL concept as a promising coal combustion technology for heat and power generation with CO 2 capture.

10 SYNTHETIC FUELS↗

The Novel Charfuel® Coal Refining Process 18 TPD Pilot Plant Project for Co- Producing an Upgraded Coal Product, and Commercially Valuable Co- Products: Area of Interest #3 – Coal Beneficiation Pilot Plant Testing (Final Report)

Operation of Carbon Fuels, LLC’s (“CF”) existing, permitted 18 TPD pilot plant located in Golden, Colorado using two individually ranked (ASTM D 388) coal types (two campaigns), employing the novel Charfuel® coal refining process to produce an upgraded coal product and a number of high-valued organic and inorganic coproducts (for which there presently exists large commercial markets) in order to produce engineering and product data which will then be utilized toward the design of a commercial scale integrated facility (pre-feed document). Carbon Fuels, LLC has developed the Charfuel® Coal Refining Process which refines domestically abundant, raw coal (in the same manner as crude oil is refined) to produce the identical, high value co-products that are refined from crude oil. Thus, gasoline, jet fuel, “green diesel”, fuel oil, and marine fuels, as well as petrochemicals such as benzene, toluene, xylene, and methanol are refined from raw coal using this process. The Charfuel® Coal Refining Process is not a coal conversion process, like pyrolysis, or indirect liquefaction. Nor is it an alternative energy system. Rather it is a coal refining process that has the ability to economically produce products traditionally associated with the refining of crude oil but using only abundant, raw coal as the refinery feed stock. The Charfuel® Coal Refining Process is more economical than crude oil refining and is environmentally benign. Therefore, this value added process yields a return on investment well above 50% for a commercial facility. Furthermore, the Charfuel® process, unlike alternatives such as ethanol and hydrogen, can utilize the existing transportation, delivery, and other petroleum based systems. Hence, there is no need for new engines, pipelines, tankers, or product acceptance. As a result, the profitability of the process is increased. Objectives: (1) Operation of the integrated 18 tpd pilot plant, using two coal types (ranks); (2) Demonstration of process flexibility in being able to produce different products (gas, liquid, and char), as well as determination of operating parameters for identifying scale up criteria for two coal types (ranks); (3) Generation of engineering and design information (process specifications) for use in designing a commercial scale plant (scale-up); (4) Determination of important environmental issues surrounding the process and the products such as fate of trace elements (mercury and other heavy metals) and distributions of SO2, NOx, and CO 2 by analysis of effluent streams; (5) Production of sufficient product to allow reliable commercial economic evaluation of both the refined coal product and the coproducts; and, (6) Assessment of longer-term reliability of unit operations. Period 1: reconfiguration of the 18 TPD plant to meet specific FOA requirements and to qualify the facility for operation; and, Period 2: operation of the 18 TPD plant for two campaigns using two coals types (ranks) which are widely commercially used and abundant - the first being a subbituminous (Powder River Basin (“PRB”)) coal, and the second a bituminous (Illinois #6) coal.

01 COAL, LIGNITE, AND PEAT↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.

01 COAL, LIGNITE, AND PEAT↗

Impact of Rheology Models on Horizontal Well Polymer Flooding in a Heavy Oil Reservoir on Alaska North Slope: A Simulation Study

Polymer rheology can have either a positive or a negative effect on polymer flooding performance under varied circumstances. Many researchers have studied the effect of polymer rheology in a vertical well, but no field scale studies have been conducted to investigate whether polymer rheology is beneficial to polymer flooding in heavy oil reservoirs developed by horizontal wells. In this paper, we conducted a numerical simulation study to examine the effect of HPAM polymer rheology on a polymer flooding pilot, which is the first-ever project conducted on a heavy oil reservoir from Alaska North Slope (ANS) developed by horizontal wells. Three rheology types were considered in the study including the apparent viscosity measured during coreflooding of using a HPAM polymer, the bulk viscosity measured with a viscometer, and a Newtonian flow model. The results suggest that using the bulk viscosity in simulation underestimates the conformance control and the water-oil-ratio reduction capability of the HPAM polymer solution. When the apparent viscosity is used, the incremental oil and sweep were largely increased, and the optimal recovery period of polymer flooding was extended greatly, especially for the heterogeneous formations. Therefore, the rheology type of polymer plays a significant role in the incremental oil recovery and injection profile of the horizontal well system given the pilot test conditions. This study has provided practical guidance to field operators for the ongoing polymer flooding pilot on ANS and will also provide valuable information for other polymer projects conducted in similar conditions.

Leng, Jianqiao↗

Hydrogen Production System Scaling Using a High-Fidelity Simulation-Optimization Framework

Proton exchange membrane (PEM) electrolyzers are widely used for hydrogen production, yet few validated, high-fidelity tools can reliably guide scale-up. Using measured performance from a 50-hour hardware-in-the-loop pilot test, a physics-based, plant-level model of a 1.25 MW PEM electrolyzer and its balance-of-plant (BoP) subsystems is developed and validated. The model couples electrochemistry and thermal/flow submodels and is calibrated against pilot test data via a genetic algorithm (GA) workflow. Validation yields a mean absolute percentage error (APE) of 0.43% for cell voltage and stack power. Two scale-out strategies are then benchmarked under a common 7-day wind-and-photovoltaic (PV) profile: (i) linear duplication of 1.25 MW blocks and (ii) shared-BoP architectures. Sharing BoP between stacks reduces BoP energy by 27% at 10 MW and 34% at 100 MW (vs. linear duplication) and improves system specific energy consumption (SEC) to 52.9 and 52.6 kWh/kg, respectively (from 54.0 kWh/kg with linear duplication). Partial-load studies (25-100% set-point) show that cumulative hydrogen production remains nearly constant down to 50% load because all cases use the same weekly renewable-energy input. Below 50%, the power cap limits how much energy can be used within 168 h, which reduces hydrogen output. The model further indicates that the practical operating optimum lies between 50% and 85% load, where efficiency gains begin to appear without significant loss in hydrogen output. Moreover, the efficiency gains at lower loads are offset by reduced production. The validated framework supports scenario-based engineering trade-off studies for large configurations (10-100 MW) and for operating policies under variable renewables.

08 HYDROGEN↗

Pilot Scale Testing of the Hydrophobic-Hydrophilic Separation Process to Produce Value-Added Products from Waste Coal

The primary objective of this project was to demonstrate the technical and economic feasibility of using the hydrophobic-hydrophilic separation (HHS) process to produce high-purity, value-added clean coal that could serve as feedstock for specialty carbon products from waste coal. An existing one-skid (i.e., the entire unit fits on a single tractor-trailer) HHS pilot-scale facility was used to process bituminous and anthracite waste coals to produce: 1) a clean coal containing less than 5% ash (super-clean) and 2) another containing less than 1.5% ash (ultra-clean), all of which contain single-digit moistures. Sufficient quantities of these products were to be generated to permit detailed evaluations by potential customers producing or developing new, high-value market applications. In addition, the project included the evaluation of several process improvements to reduce the capital and operating costs for a commercial HHS plant. A final objective was to complete an economic analysis, market-penetration analysis, and technology-gap analysis of the HHS technology and its products.

01 COAL, LIGNITE, AND PEAT↗

ION Validation of Transformational CO2 Capture Solvent Technology with Revolutionary Stability: “Project Apollo”

This final report presents all the work and tests performed during ION’s carbon dioxide (CO2) capture pilot test campaign at the 0.6 MWe scale in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center (NCCC): “Validation of Transformational CO2 Capture Solvent Technology with Revolutionary Stability,” referred to as the “Apollo” Project (DE-FE0031727).

Meuleman, Erik↗

Energy use of piperazine with the advanced stripper from pilot plant testing

Here, piperazine with the Advanced Stripper (PZAS™) was tested at the National Carbon Capture Center (NCCC) at coal and NGCC conditions. Energy performance was measured with accounting for heat loss. The net heat duty was found to be identical at 2.45 GJ/tonne for both 4 and 12% CO 2 at 90% CO 2 removal. The average measured heat loss was 0.38 GJ/tonne and represented 30% of the gross heat rate. For PZAS, the warm rich piping before the control valve is the largest in surface area. Heat loss at this location increased heat duty by 80% of the heat loss value. Therefore, the total heat duty was decreased by 80% of the heat loss. The Independence™ model was validated using 112 steady-state pilot plant runs and predicted average net heat duty with an error of 9% and lean loading with an error of 10%. The model was used to simulate process impacts of heat loss for the PZAS and simple stripper configurations. For both strippers, heat loss was found to impact heat duty at locations other than just the steam heater. While heat loss in the steam heater was the most important for PZAS, heat loss in the column was the most important for the simple stripper due to a large top-side pinch and CO 2 reabsorption at the same location. CO 2 reabsorption in PZAS occurred only at high heat loss values (~0.14 GJ/hr), compared to low heat loss values (~ 0.03 GJ/hr) in the PZ-simple stripper. Excessive packing in the PZ-simple stripper caused a large top-side pinch at 0.23 mol/mol lean loading, making the column very sensitive to heat loss. Heat loss in the PZ-simple stripper increased heat duty by 120–150% at typical heat loss values and lean loading of 0.23 mol/mol. Heat loss in the MEA-simple stripper only increased heat duty by 1–13% in a typical lean loading range of 0.1–0.2 mol/mol. A large bottom side pinch at low lean loading for 7 m MEA made the effect of heat loss less pronounced.

42 ENGINEERING↗

Experimental Investigation of Polymer Induced Fouling of Heater Tubes in the First-ever Polymer Flood Pilot on Alaska North Slope

Polymer flooding has been validated in the lab and by successful applications in other countries, such as Canada and China, to be an effective EOR technique for heavy oil reservoirs. Currently, polymer flooding is being pilot tested for the first time in the Schrader Bluff viscous oil reservoir at Milne Point field on Alaska North Slope (ANS). One of the major concerns of the operator is the impact of polymer on the oil production system after polymer breakthrough, especially the polymer induced fouling issues in the heat exchanger. This study investigates the propensity of polymer fouling on the heater tubes as a function of different variables, with the ultimate goal of determining safe and efficient operating conditions. A unique experimental set-up was indigenously designed and developed to simulate the fouling process on the heating tube. The influence of heating tube skin temperature, tube material, and polymer concentration on fouling tendency was investigated. Under each test condition, the test was run five times with the same tube, and in each run, the freshly prepared synthetic brine and polymer solution were heated from 77°F to 122°F to mimic field operating conditions. The heating time and fouling amount were recorded for each run. The morphology and composition of the deposit samples were analyzed by environmental scanning electron microscopy (ESEM) and X-ray diffraction (XRD), respectively. It has been found that, in general, the presence of polymer in produced fluids would aggravate the fouling issues on both carbon steel and stainless steel surfaces at all tested skin temperatures (165°F, 250 °F and 350°F), but only higher skin temperatures of 250°F and 350°F could cause polymer induced fouling issues on the copper tube surface and the fouling tendency increased with polymer concentration. At the lower skin temperatures of 165°F, no polymer-induced fouling was identified on the copper tube. A critical temperature that is related to the cloud point of the polymer solution was believed to exist, below which polymer induced fouling would not occur and only mineral scale deposited, but above which the polymer would obviously aggravate the fouling issue. The heating efficiency of the tube would be reduced gradually as more fouling material accumulates on its surface. The ESEM results indicate that if polymer precipitated and deposited on the surface, it would bond to the mineral crystals to form a stronger three- dimensional network structure, and that is why the polymer induced fouling was tougher and more difficult to be removed from the tube surface. The XRD analysis results confirm that the presence of polymer in the fluids can enhance the mineral scale propensity. Overall, the study results have provided practical guidance to the field operator for the ongoing polymer flooding pilot test on ANS. This study may also prove to be valuable for other chemical EOR projects around the world.

Alaska North Slope↗

Pilot scale testing of an advanced solvent in a 0.7 MWe post-combustion CO 2 capture unit

An advanced Amine Promoted Buffer Solution (APBS), APBS-CDRMax® (CDRMax), developed by Carbon Clean Solutions Limited (CCSL), was tested at the 0.7 MWe CO 2 capture facility at Kentucky Utilities E.W. Brown Generation Station using a heat-integrated two-staged stripping CO 2 capture process. The performance of the solvent was evaluated to determine operating conditions that maximized the cyclic capacity of the solvent and results in energy savings. The regeneration energy ranged from 2.9 to 3.3 GJ/ton CO 2 with 14 vol % (dry) CO 2 inlet and approximately 90 % capture. The difference in the reboiler specific heat duty at stripper pressures of 1.7 and 2.1 bar was minimal as similar amounts of water vapor were observed in the CO 2 product stream at stripper outlet. Recycling of product CO 2 increased the inlet CO 2 concentration to the absorber from 14 to 16 vol% which enhanced mass transfer from the gas to the solvent resulting in about 5 % reduction in the energy of regeneration at the lower stripper pressure. The solvent circulation rate was reduced by about 30 % relative to previous 30 wt% MEA campaign for the CO 2 target capture of 90 %. Finally, the reduced solvent make-up rate of CDRMax shows promise for capital and operating cost savings for post-combustion CO 2 capture.

42 ENGINEERING↗

Particle Separator for Improved Flameless Pressurized Oxy-Combustion

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), and General Electric Global Research (GE) is advancing Flameless Pressurized Oxy-combustion (FPO), a novel coal technology. This effort seeks to develop a particle separator for the hot-gas stream leaving the FPO loop. In order to maximize the energy extracted from the cycle, the hot gas is put through a turbo-expander before flue-gas treatment. The particle separator designed under this project sought to operate at high temperature and with low-pressure drop, protecting the turbo-expander from erosion damage. The team engaged potential vendors for the test, developed plans for the pilot test loop modification, and refined requirements for the commercial turbo-expander.

01 COAL, LIGNITE, AND PEAT↗

Design of Experiments for Dynamic Test Runs in Solvent-Based CO 2 Capture Pilot Plants

Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.

CO2 capture↗

Tracking and Positioning System for Floating Solar (CRADA Abstract)

The project goal is to develop a floating solar photovoltaics (FPV) tracking & position system that: (1) increases annual energy production of FPV projects by >10%, (2) lowers levelized cost of energy (LCOE) for FPV by >10%, and (3) leverages U.S. contract supply chain & manufacturing. The outcome of the project will be a certified tracking product that has undergone extensive field testing and is ready for commercial sales. The primary objectives for each budget period are: • BP1: Define product requirements, develop initial controls architecture and design other sub-components, complete small-scale pilot testing, install a larger-scale pilot, secure sites for commercial pilots, and develop the beta-version of a user portal. • BP2: complete control system and sub-component design, successful demonstration and testing at a commercial pilot, certification & bankability, finalize user portal, and complete various commercialization activities related to supply chain, customer acquisition, and sales. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. PNNL will provide support during both project phases for prototype development and testing of the controls architecture, software, and hardware components of the tracking and positioning system. This effort represents PNNL’s first opportunity to support the floating solar photovoltaics (FPV) industry with capabilities, facilities, and personnel developed to contribute to the marine energy (e.g., wave and tidal energy) sector. This portfolio expansion leverages internal and DOE EERE investments and the growing visibility of PNNL-Sequim’s Marine and Coastal Research Laboratory (MCRL) and our marine research capabilities, in general. The development of effective and low-cost FPV platforms is a potential way to increase the nation’s set of tools for providing emission-free electricity without utilizing valuable terrestrial resources. Successful commercialization of such a project may lead to economic benefits through job creation, supply chain creation, and access to a cheaper source of electricity.

14 SOLAR ENERGY↗

CTAP REPORT. Commercialization of Power Spectrum Analysis (PSA) Technology

Power Spectrum Analysis (PSA) is a Sandia-developed, non-intrusive, electrical technique that captures distinct frequency-domain signatures of microelectronics devices using an innovative, unconventional biasing scheme (off-normal biasing). PSA can identify subtle differences in devices and is applicable in various areas such as device screening, counterfeit identification, reliability assurance, and trust authentication. From October 2020 to April 2021, Sandia worked with entrepreneurs from a new start-up company, Chiplytics, to commercialize PSA technology through NNSA-sponsored FedTech Program. In September 2021, Sandia received funding through Covid-19 Technical Assistance Program (CTAP) to provide technical assistance to Chiplytics for commercialization. Under the CTAP Statement of Work, Sandia was tasked with providing technical assistance to Chiplytics in PSA pilot testing for Naval Surface Warfare Center (NSWC) at Crane and other pilot participants. Sandia was also tasked with assisting Chiplytics in hardware development and evaluation of Chiplytics prototype system.

24 POWER TRANSMISSION AND DISTRIBUTION↗