Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

The NASA Scientific and Technical Information System: Its scope and coverage

Subjects of scientific and technical documents considered for inclusion in NASA's information bank are broadly summarized under the various categories used in Scientific and Technical Aerospace Reports and International Aerospace Abstracts. A general definition of each category is followed by a list of the aspects of each subject which are of exhaustive, selective, or negative interest because of their relevance to aerospace science and technology and to other NASA projects.

Source record↗

Lahaina Energy Partnership: Tasks 1-5

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by NREL. To inform the scope of technical assistance, NREL has partnered with Hawaii-based community engagement and sustainability-focused organizations to connect with Lahaina residents, business owners to understand the community's energy priorities and vision for the future. This presentation presents a summary of the community's energy priorities and NREL's scope of work for the project, to be completed in early 2027.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wai'anae Moku Resilience Hub Network ETIPP Deep-Dive Technical Assistance

In 2024, organizations representing communities in the Wai'anae moku, with support from the National Laboratory of the Rockies (NLR) and Hawai'i State Energy Office (HSEO) through an ETIPP Strategic Energy Planning engagement, developed the Wai'anae Moku Community Energy Plan, along with a companion report from NLR. The plan identified five priority focus areas and associated projects to support an energy vision of Wai'anae moku community representatives. The 2026 ETIPP Deep Dive Technical Assistance focuses explicitly on the project identified as highest priority in the plan: support for resilience hub network design and analysis. This fact sheet outlines the scope of technical assistance, benefits of participation the project, and roles and contact information for partners in the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lahaina Energy Partnership: Technical Assistance Task Updates and Discussion Part 2

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the second in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 focused on hydropower resource potential, building energy modeling, and workforce development. Workshop 2 on December 11 (this presentation) will focus on microgrids, electric grid hardening, policy and regulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lahaina Energy Partnership: Technical Assistance Task Updates and Discussion Part 1 [Slides]

The Lahaina Energy Partnership (LEP) is an initiative funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) to support energy planning and rebuilding efforts in Hawaii's historic town of Lahaina on Maui as the community recovers from a devastating fire on August 8, 2023, with technical assistance provided by the National Laboratory of the Rockies. NLR has partnered with Hawaii-based community organizations to engage with Lahaina the community on energy priorities and inform the technical assistance scope. This virtual workshop presentation is the first in a two-part series to provide progress updates and request community input to guide next steps. Workshop 1 on November 18 (this presentation) will focus on Hydropower resource potential, building energy modeling, workforce development. Workshop 2 on December 11 (presentation forthcoming) will focus on microgrids, electric grid hardening, policy and regulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

Overruns↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts.

Project↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

Project↗

AAM Project: High Density Vertiplex (HDV) Research and Capabilities

NASA is currently engaged in dedicated research into vertiports through its Advanced Air Mobility Project, housed within the Airspace Operations Safety Program (AOSP), through a Sub-Project referred to as High Density Vertiplex, or simply HDV. This effort’s mission is to develop a reference automation architecture for vertiports that will enable operations to scale to the density levels envisioned for future environments. Through the development of the HDV Concept of Operations and accompanying architecture documents a research roadmap was developed as part of the effort's formulation process that laid the foundations for the work and schedule to be completed as part of the HDV scope and technical challenge. This presentation provides the background of the HDV Sub-Project and outlines the concept and capabilities as it has developed to date. Summaries of the completed work package and status of current work package will be provided with details on specific capabilities and supporting integration developments.

vertiport↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗