Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING

Forecasting Solar Photovoltaic Power Production: A Comprehensive Review and Innovative Data-Driven Modeling Framework

The intermittent and stochastic nature of Renewable Energy Sources (RESs) necessitates accurate power production prediction for effective scheduling and grid management. This paper presents a comprehensive review conducted with reference to a pioneering, comprehensive, and data-driven framework proposed for solar Photovoltaic (PV) power generation prediction. The systematic and integrating framework comprises three main phases carried out by seven main comprehensive modules for addressing numerous practical difficulties of the prediction task: phase I handles the aspects related to data acquisition (module 1) and manipulation (module 2) in preparation for the development of the prediction scheme; phase II tackles the aspects associated with the development of the prediction model (module 3) and the assessment of its accuracy (module 4), including the quantification of the uncertainty (module 5); and phase III evolves towards enhancing the prediction accuracy by incorporating aspects of context change detection (module 6) and incremental learning when new data become available (module 7). This framework adeptly addresses all facets of solar PV power production prediction, bridging existing gaps and offering a comprehensive solution to inherent challenges. By seamlessly integrating these elements, our approach stands as a robust and versatile tool for enhancing the precision of solar PV power prediction in real-world applications.

14 SOLAR ENERGY

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints

Same Data, Different Audiences: Using Personas to Scope a Supercomputing Job Queue Visualization

Domain-specific visualizations sometimes focus on narrow, albeit important, tasks for one group of users. This focus limits the utility of a visualization to other groups working with the same data. While tasks elicited from other groups can present a design pitfall if not disambiguated, they also present a design opportunity—namely, the development of visualizations that support multiple groups. This development choice presents a trade-off of broadening the scope but limiting support for the more narrow tasks of any one group, which in some cases can enhance the overall utility of the visualization. We investigate this scenario through a design study where we develop Guidepost, a notebook-embedded visualization of data that helps scientists assess compute wait times, machine learning researchers understand prediction accuracy, and system maintainers analyze usage trends. We adapt the use of personas for visualization design from existing literature in the HCI and design domains, applying them to categorize tasks based on their uniqueness across stakeholder personas. Under this model, tasks shared between all groups should be supported by interactive visualizations and tasks unique to each group can be deferred to scripting with notebook-embedded visualization design. We evaluate our visualization through real-world case studies and a task-focused evaluation with nine participants. We observe that together, Guidepost's visual encodings, interactions, and export capabilities support the tasks of our differing personas.

97 MATHEMATICS AND COMPUTING

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS

IRIS: A Performance-Portable Framework for Cross-Platform Heterogeneous Computing

From edge to exascale, computer architectures are becoming more heterogeneous and complex. The systems typically have fat nodes, with multicore CPUs and multiple hardware accelerators such as GPUs, FPGAs, and DSPs. This complexity is causing a crisis in programming systems and performance portability. Several programming systems are working to address these challenges, but the increasing architectural diversity is forcing software stacks and applications to be specialized for each architecture. As we show, all of these approaches critically depend on their software framework for discovery, execution, scheduling, and data orchestration. To address this challenge, we believe that a more agile and proactive software framework is essential to increase performance portability and improve user productivity. To this end, we have designed and implemented IRIS: a performance-portable framework for cross-platform heterogeneous computing. IRIS can discover available resources, manage multiple diverse programming platforms (e.g., CUDA, Hexagon, HIP, Level Zero, OpenCL, OpenMP) simultaneously in the same execution, respect data dependencies, orchestrate data movement proactively, and provide for user-configurable scheduling. To simplify data movement, IRIS introduces a shared virtual device memory with relaxed consistency among different heterogeneous devices. IRIS also adds an automatic kernel workload partitioning technique using the polyhedral model so that it can resize kernels for a wide range of devices. Our evaluation on three architectures, ranging from Qualcomm Snapdragon to a Summit supercomputer node, shows that IRIS improves portability across a wide range of diverse heterogeneous architectures with negligible overhead.

97 MATHEMATICS AND COMPUTING

Development of High Temperature (>700°C) Molten Salt Pump Technology for Generation 3 Solar Power Tower Systems

Bearings are required for long-shafted pumps historically used in concentrating solar thermal power applications. For molten chloride salts, bearings for such service conditions are not commercially available, nor has a design been demonstrated to work. Therefore, a project was sponsored by the Department of Energy’s Solar Energy Technologies Office for the development and demonstration of a submerged bearing for use in chloride salt pumps. This project’s tasks covered the tribological testing of candidate materials and the design, fabrication, testing, and post-test analysis of full-scale salt-compatible bearings. This work expands upon previous work. The effects of potential particulate in the salt were investigated through tribological bench testing. Through 11 tests, the MgO particulate size and concentration in a molten chloride salt were varied, and the effects on friction, wear rate, and wear characteristics were recorded. Novel journal bearings for chloride salt service were designed and fabricated based on these results. The bearings were of a relevant scale (i.e., for a 1.5 in. pump shaft) to demonstrate the technology with respect to further scale-up. The bearings were made of Haynes 244 and Yttria Partially Stabilized Zirconia. A custom bearing test rig, salt tanks, and associated infrastructure (e.g., heaters, tanks, transfer lines, gas flow control) were designed, procured, and installed. A few issues were encountered in the system fabrication process, resulting in delay of the project schedule. The system was successfully fabricated and assembled. Heating, cover gas, and pump motor systems were integrated into the control logic. This progress of the bearing test system represents a significant step forward towards demonstrating this promising technology. Nevertheless, the project ended before testing of the full-scale bearings could be performed.

14 SOLAR ENERGY

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W