Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Report of the NASA lunar energy enterprise case study task force

The Lunar Energy Enterprise Cast Study Task Force was formed to determine the economic viability and commercial business potential of mining and extracting He-3 from the lunar soil for use in earth-based fusion reactors. In addition, the Solar Power Satellite (SPS) and the Lunar Power Station (LPS) were also evaluated because they involve the use of lunar materials and could provide energy for lunar-based activities. The Task Force considered: (1) the legal and liability aspects of the space energy projects; (2) the long-range terrestrial energy needs and options; (3) the technical maturity of the three space energy projects; and (4) their commercial potential. The use of electricity is expected to increase, but emerging environmental concerns and resource availability suggest changes for the national energy policy. All three options have the potential to provide a nearly inexhaustible, clean source of electricity for the U.S. and worldwide, without major adverse impacts on the Earth's environment. Assumption by industry of the total responsibility for these energy projects is not yet possible. Pursuit of these energy concepts requires the combined efforts of government and industry. The report identifies key steps necessary for the development of these concepts and an evolving industrial role.

Source record↗

Report of the Interagency Task Force on Carbon Capture and Storage

Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO{sub 2}) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO{sub 2}. In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an Interagency Task Force on Carbon Capture and Storage composed of 14 Executive Departments and Federal Agencies. The Task Force, co-chaired by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within ten years, with a goal of bringing five to ten commercial demonstration projects online by 2016. Composed of more than 100 Federal employees, the Task Force examined challenges facing early CCS projects as well as factors that could inhibit widespread commercial deployment of CCS. In developing the findings and recommendations outlined in this report, the Task Force relied on published literature and individual input from more than 100 experts and stakeholders, as well as public comments submitted to the Task Force. The Task Force also held a large public meeting and several targeted stakeholder briefings. While CCS can be applied to a variety of stationary sources of CO{sub 2}, its application to coal-fired power plant emissions offers the greatest potential for GHG reductions. Coal has served as an important domestic source of reliable, affordable energy for decades, and the coal industry has provided stable and quality high-paying jobs for American workers. At the same time, coal-fired power plants are the largest contributor to U.S. greenhouse gas (GHG) emissions, and coal combustion accounts for 40 percent of global carbon dioxide (CO{sub 2}) emissions from the consumption of energy. EPA and Energy Information Administration (EIA) assessments of recent climate and energy legislative proposals show that, if available on a cost-effective basis, CCS can over time play a large role in reducing the overall cost of meeting domestic emissions reduction targets. By playing a leadership role in efforts to develop and deploy CCS technologies to reduce GHG emissions, the United States can preserve the option of using an affordable, abundant, and domestic energy resource, help improve national security, help to maximize production from existing oil fields through enhanced oil recovery (EOR), and assist in the creation of new technologies for export. While there are no insurmountable technological, legal, institutional, regulatory or other barriers that prevent CCS from playing a role in reducing GHG emissions, early CCS projects face economic challenges related to climate policy uncertainty, first-of-a-kind technology risks, and the current high cost of CCS relative to other technologies. Administration analyses of proposed climate change legislation suggest that CCS technologies will not be widely deployed in the next two decades absent financial incentives that supplement projected carbon prices. In addition to the challenges associated with cost, these projects will need to meet regulatory requirements that are currently under development. Long-standing regulatory programs are being adapted to meet the circumstances of CCS, but limited experience and institutional capacity at the Federal and State level may hinder implementation of CCS-specific requirements. Key legal issues, such as long-term liability and property rights, also need resolution. A climate policy designed to reduce our Nation's GHG emissions is the most important step for commercial deployment of low-carbon technologies such as CCS, because it will create a stable, long-term framework for private investments. A concerted effort to properly address financial, economic, technological, legal, institutional, and social barriers will enable CCS to be a viable climate change mitigation option that can over time play an important role in reducing the overall cost of meeting domestic and global emissions reduction targets. Federal and State agencies can use existing authorities and programs to begin addressing these barriers while ensuring appropriate safeguards are in place to protect the environment and public health and safety.

01 COAL, LIGNITE, AND PEAT↗

Fifth Report of the NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions

The NASA Advisory Council Task Force on the Shuttle-Mir rendezvous and docking missions examine a number of specific issues related to the Shuttle-Mir program. Three teams composed of Task Force members and technical advisors were formed to address the follow issues: preliminary results from STS-71 and the status of preparations for STS-74; NASA's presence in Russia; and NASA's automated data processing and telecommunications (ADP/T) infrastructure in Russia. The three review team reports have been included in the fifth report of the Task Force.

Source record↗

Sandia-Power Surety Task Force Hawaii foam analysis.

The Office of Secretary of Defense (OSD) Power Surety Task Force was officially created in early 2008, after nearly two years of work in demand reduction and renewable energy technologies to support the Warfighter in Theater. The OSD Power Surety Task Force is tasked with identifying efficient energy solutions that support mission requirements. Spray foam insulation demonstrations were recently expanded beyond field structures to include military housing at Ft. Belvoir. Initial results to using the foam in both applications are favorable. This project will address the remaining key questions: (1) Can this technology help to reduce utility costs for the Installation Commander? (2) Is the foam cost effective? (3) What application differences in housing affect those key metrics? The critical need for energy solutions in Hawaii and the existing relationships among Sandia, the Department of Defense (DOD), the Department of Energy (DOE), and Forest City, make this location a logical choice for a foam demonstration. This project includes application and analysis of foam to a residential duplex at the Waikulu military community on Oahu, Hawaii, as well as reference to spray foam applied to a PACOM facility and additional foamed units on Maui, conducted during this project phase. This report concludes the analysis and describes the utilization of foam insulation at military housing in Hawaii and the subsequent data gathering and analysis.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

GeoVision Analysis Supporting Task Force Report: Electric Sector Potential to Penetration

This report describes research and analysis performed in support of the U.S. Department of Energy Geothermal Technologies Office for its Geothermal Vision Study. A summary of the study is captured in DOE’s report, GeoVision: Harnessing the Heat Beneath Our Feet and included ground-breaking, detailed research on geothermal technologies. The study projects and quantifies the future electric and nonelectric deployment potentials of these geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment. Coordinated by the U.S. Department of Energy Geothermal Technologies Office, the Geothermal Vision Study development relied on collecting, modeling, and analyzing robust data sets through seven national laboratory partners that were organized into eight technical task force groups. These task forces and their respective principal leading national laboratory are listed in Table F-1. The table also provides a guide to the final research documents produced by each GeoVision task force. In most cases, these were prepared as laboratory reports, and they are referenced accordingly. Consult these external reports for detailed discussions of the topics contained within, which form the basis of the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

GeoVision Analysis Supporting Task Force Report: Barriers-An Analysis of Non-Technical Barriers to Geothermal Deployment and Potential Improvement Scenarios

This report describes research and analysis performed in support of the U.S. Department of Energy Geothermal Technologies Office for its Geothermal Vision Study. A summary of the study is captured in DOE’s report, GeoVision: Harnessing the Heat Beneath Our Feet and included ground-breaking, detailed research on geothermal technologies. The study projects and quantifies the future electric and nonelectric deployment potentials of these geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment. Coordinated by the U.S. Department of Energy Geothermal Technologies Office, the Geothermal Vision Study development relied on collecting, modeling, and analyzing robust data sets through seven national laboratory partners that were organized into eight technical task force groups. These task forces and their respective principal leading national laboratory are listed in Table F-1. The table also provides a guide to the final research documents produced by each GeoVision task force. In most cases, these were prepared as laboratory reports, and they are referenced accordingly. Consult these external reports for detailed discussions of the topics contained within, which form the basis of the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

GeoVision Analysis Supporting Task Force Report: Thermal Applications-Quantifying Technical, Economic, and Market Potential of Geothermal District Heating Systems in the United States

This report describes research and analysis performed in support of the U.S. Department of Energy Geothermal Technologies Office for its Geothermal Vision Study. A summary of the study is captured in DOE’s report, GeoVision: Harnessing the Heat Beneath Our Feet and included ground-breaking, detailed research on geothermal technologies. The study projects and quantifies the future electric and nonelectric deployment potentials of these geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment. Coordinated by the U.S. Department of Energy Geothermal Technologies Office, the Geothermal Vision Study development relied on collecting, modeling, and analyzing robust data sets through seven national laboratory partners that were organized into eight technical task force groups. These task forces and their respective principal leading national laboratory are listed in Table F-1. The table also provides a guide to the final research documents produced by each GeoVision task force. In most cases, these were prepared as laboratory reports, and they are referenced accordingly. Consult these external reports for detailed discussions of the topics contained within, which form the basis of the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

GeoVision Analysis Supporting Task Force Report: Impacts-The Employment Opportunities, Water Impacts, Emission Reductions, and Air Quality Improvements of Achieving High Penetrations of Geothermal Power in the United States

This report describes research and analysis performed in support of the U.S. Department of Energy Geothermal Technologies Office for its Geothermal Vision Study. A summary of the study is captured in DOE’s report, GeoVision: Harnessing the Heat Beneath Our Feet and included ground-breaking, detailed research on geothermal technologies. The study projects and quantifies the future electric and nonelectric deployment potentials of these geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment. Coordinated by the U.S. Department of Energy Geothermal Technologies Office, the Geothermal Vision Study development relied on collecting, modeling, and analyzing robust data sets through seven national laboratory partners that were organized into eight technical task force groups. These task forces and their respective principal leading national laboratory are listed in Table F-1. The table also provides a guide to the final research documents produced by each GeoVision task force. In most cases, these were prepared as laboratory reports, and they are referenced accordingly. Consult these external reports for detailed discussions of the topics contained within, which form the basis of the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

Sustainable energy for all. Technical report of task force 2 in support of doubling the global rate of energy efficiency improvement and doubling the share of renewable energy in the global energy mix by 2030

The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force Two which is dedicated energy efficiency and renewable energy objectives. The report shows that doubling the rate of energy efficiency improvements and doubling the share of energy from renewable sources by 2030 is challenging but feasible if sufficient actions are implemented. Strong and well-informed government policies as well as extensive private investment should focus on the high impact areas identified by the task force.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗

NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions

The NASA Advisory Council Task Force on the Shuttle-Mir rendezvous and docking convened on May 24 and 25, 1994. Based on the meetings, the Task Force made the following recommendations: at a minimum, the mission commander and payload commander for all subsequent Shuttle-Mir missions should be named at least 18 months in advance of the scheduled launch date; in order to derive early operational experience in advance of the first Mir docking mission, the primary objective of STS-63 should be Mir rendezvous and proximity operations; and if at all possible, the launch date for STS-63 should be moved forward.

Source record↗

Sustainable energy for all. Technical report of task force 1 in support of the objective to achieve universal access to modern energy services by 2030

The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force One which is dedicated to the objective of achieving universal access to modern energy services by 2030. The report shows that universal energy access can be realized by 2030 with strong, focused actions set within a coordinated framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wave scheduling - Decentralized scheduling of task forces in multicomputers

Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

Van Tilborg, A. M.↗

Sci—Fri PM: Topics — 03: The Global Task Force on Radiotherapy for Cancer Control: Core Investments

The Union for International Cancer Control (UICC) is a membership-based, non-governmental organization with a mandate to “…to unite the cancer community to reduce the global cancer burden, to promote greater equity, and to integrate cancer control into the world health and development agenda.” COMP is an associate member of the UICC. It is well recognized by the UICC that there are major gaps between high, and low and middle income countries, in terms of access to cancer services including access to radiation therapy. In this context, the UICC has developed a Global Task Force on Radiotherapy for Cancer Control with a charge to answer a single question: “What does it cost to close the gap between what exists today and reasonable access to radiotherapy globally?” The Task Force consists of leaders internationally recognized for their radiation treatment related expertise (radiation oncologists, medical physicists, radiation therapists) as well as those with global health and economics specialization. The Task Force has developed three working groups: (1) to look at the global burden of cancer; (2) to look at the infrastructure requirements (facilities, equipment, personnel); and (3) to consider outcomes in terms of numbers of lives saved and palliated patients. A report is due at the World Cancer Congress in December 2014. This presentation reviews the infrastructure considerations under analysis by the second work group. The infrastructure parameters being addressed include capital costs of buildings and equipment and operating costs, which include human resources, equipment servicing and quality control, and general overhead.

60 APPLIED LIFE SCIENCES↗

Group Task Force on Satellite Rescue and Repair

The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.

Source record↗

Fourth Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

On December 6, 1994, the NASA Administrator, Mr. Daniel Goldin, requested that Lt. Gen. Thomas P. Stafford, in his role as the Chairman of the NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions, lead a team composed of several Task Force members and technical advisors' to Russia with the goal of reviewing preparations and readiness for the upcoming international Space Station Phase 1 missions. In his directions to Gen. Stafford, Mr. Goldin requested that the review team focus its initial efforts on safety of flight issues for the following Phase 1A missions: the Soyuz TM-21 mission which will carry U.S. astronaut Dr. Norman Thagard and cosmonauts Lt. Col. Vladimir Dezhurov and Mr. Gennady Strekalov aboard a Soyuz spacecraft to the Mir Station; the Mir 18 Main Expedition during which Thagard and his fellow cosmonauts, Dezhurov and Strokalov, will spend approximately three months aboard the Mir Station; the STS-71 Space Shuttle mission which will perform the first Shuttle-Mir docking, carry cosmonauts Col. Anatoly SoloViev and Mr. Nikolai Budarin to the Mir Station, and return Thagard, Dezhurov, and Strekalov to Earth.

Source record↗

Research priorities and plans for the International Space Station-results of the 'REMAP' Task Force

Recent events in the International Space Station (ISS) Program have resulted in the necessity to re-examine the research priorities and research plans for future years. Due to both technical and fiscal resource constraints expected on the International Space Station, it is imperative that research priorities be carefully reviewed and clearly articulated. In consultation with OSTP and the Office of Management and budget (OMB), NASA's Office of Biological and Physical Research (OBPR) assembled an ad-hoc external advisory committee, the Biological and Physical Research Maximization and Prioritization (REMAP) Task Force. This paper describes the outcome of the Task Force and how it is being used to define a roadmap for near and long-term Biological and Physical Research objectives that supports NASA's Vision and Mission. Additionally, the paper discusses further prioritizations that were necessitated by budget and ISS resource constraints in order to maximize utilization of the International Space Station. Finally, a process has been developed to integrate the requirements for this prioritized research with other agency requirements to develop an integrated ISS assembly and utilization plan that maximizes scientific output. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.

NASA Center HQS↗