Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TRUPACT-II”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

30 records · Page 2

CH-TRU Waste Content Codes (CH-TRUCON) (Rev. 38)

The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented in Table 1. The CH-TRAMPAC describes "shipping categories" that are assigned to each payload container. Multiple shipping categories may be assigned to a single content code. A summary of approved content codes and corresponding shipping categories is provided in Table 2, which consists of Tables 2A, 2B, and 2C. Table 2A provides a summary of approved content codes and corresponding shipping categories for the "General Case," which reflects the assumption of a 60-day shipping period as described in the CH-TRAMPAC and Appendix 3.4 of the CH-TRU Payload Appendices. For shipments to be completed within an approximately 1,000-mile radius, a shorter shipping period of 20 days is applicable as described in the CH-TRAMPAC and Appendix 3.5 of the CH-TRU Payload Appendices. For shipments to WIPP from Los Alamos National Laboratory (LANL), Nevada Test Site, and Rocky Flats Environmental Technology Site, a 20-day shipping period is applicable. Table 2B provides a summary of approved content codes and corresponding shipping categories for "Close-Proximity Shipments" (20-day shipping period). For shipments implementing the controls specified in the CH-TRAMPAC and Appendix 3.6 of the CH-TRU Payload Appendices, a 10-day shipping period is applicable. Table 2C provides a summary of approved content codes and corresponding shipping categories for "Controlled Shipments" (10-day shipping period).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH-TRU Waste Content Codes (CH-TRUCON) (Rev. 39)

The CH-TRU Waste Content Codes (CH-TRUCON) document describes the inventory of the U.S. Department of Energy (DOE) CH-TRU waste within the transportation parameters specified by the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC). The CH-TRAMPAC defines the allowable payload for the Transuranic Package Transporter-II (TRUPACT-II) and HalfPACT packagings. This document is a catalog of TRUPACT-II and HalfPACT authorized contents and a description of the methods utilized to demonstrate compliance with the CH-TRAMPAC. A summary of currently approved content codes by site is presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mobile loading transuranic waste at small quantity sites in the Department of Energy complex-10523

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), operates mobile loading operations for all of the large and small quantity transuranic (TRU) waste sites in the Department of Energy (DOE) complex. The mobile loading team performs loading and unloading evolutions for both contact handled (CH) and remote handled (RH) waste. For small quantity sites, many of which have yet to remove their TRU waste, the mobile loading team will load shipments that will ship to Idaho National Laboratory, a centralization site, or ship directly to the Waste Isolation Pilot Plant (WIPP). For example, Argonne National Laboratory and General Electric Vallecitos Nuclear Center have certified programs for RH waste so they will ship their RH waste directly to WIPP. Many of the other sites will ship their waste to Idaho for characterization and certification. The Mobile Loading Units (MLU) contain all of the necessary equipment needed to load CH and RH waste into the appropriate shipping vessels. Sites are required to provide additional equipment, such as cranes, fork trucks, and office space. The sites are also required to provide personnel to assist in the shipping operations. Each site requires a site visit from the mobile loading team to ensure that all of the necessary site equipment, site requirements and space for shipping can be provided. The mobile loading team works diligently with site representatives to ensure that all safety and regulatory requirements are met. Once the waste is ready and shipping needs are met, the mobile loading team can be scheduled to ship the waste. The CH MLU is designed to support TRUPACT-II and HalfPACT loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for TRUPACT-II and HalfPACT loading and shipment certification. The RH MLU is designed to support removable lid canister (RLC) and RH-72B cask loading activities wherever needed within the DOE complex. The team that performs the mobile loading operation has obtained national certification under DOE for RLC and RH-72B Cask loading and shipment certification. To date, the mobile loading team has successfully made 2,131 CH and RH TRU waste shipments. The mobile loading team continues to provide each site with safe and compliant loading ofTRU waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Flammable Gas Analysis (Rev. 4)

This document describes and implements the process to determine the concentration of flammable gas/volatile organic compounds (VOCs), hydrogen, and methane in a waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II), HalfPACT, TRUPACT-III, or RH-TRU72-B packagings. An aliquot of headspace gas (HSG) is sampled from a waste container and analyzed using a gas chromatograph (GC) with two detectors: a mass spectrometer (MS), and a thermal conductivity detector (TCD). The sample analyzed in the GC is split and half is sent to the MS for volatile organic compound (VOC) analysis while the other half is sent to the TCD for hydrogen and methane analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Flammable Gas Analysis (Rev. 3.1)

This document describes and implements the process to determine the concentration of flammable gas/volatile organic compounds (VOCs), hydrogen, and methane in a waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II), HalfPACT, or RH-TRU 72-B packagings. An aliquot of headspace gas (HSG) is sampled from a waste container and analyzed using a gas chromatograph (GC) with two detectors: a mass spectrometer (MS), and a thermal conductivity detector (TCD). The sample analyzed in the GC is split and half is sent to the MS for volatile organic compound (VOC) analysis while the other half is sent to the TCD for hydrogen and methane analysis. The requirements and technical bases for allowable flammable gas/VOC concentrations are described in the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC) and the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RHTRAMPAC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Flammable Gas Analysis (Rev. 3.2)

This document describes and implements the process to establish the concentration of flammable gas/volatile organic compounds (VOCs), hydrogen, and methane in a waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II) or HalfPACT packagings. An aliquot of headspace gas (HSG) is sampled from a waste container and analyzed using one analytical unit which is a gas chromatograph (GC) with two detectors, a mass spectrometer (MS) and a thermal conductivity detector (TCD). The sample introduced to the GC is split and part goes to MS and the other part goes to TCD. The MS analyzes sample for volatile organic compounds (VOC) and the TCD analyzes for hydrogen and methane. The requirements and technical bases for allowable flammable gas/VOC concentrations are described in the Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Generator Instructions: Key to Successful Implementation of the US DOE's 435.1 for Transuranic Waste Packaging Instructions (LA-UR-12-24155) - 13218

In times of continuing fiscal constraints, a management and operation tool that is straightforward to implement, works as advertised, and virtually ensures compliant waste packaging should be carefully considered and employed wherever practicable. In the near future, the Department of Energy (DOE) will issue the first major update to DOE Order 435.1, Radioactive Waste Management. This update will contain a requirement for sites that do not have a Waste Isolation Pilot Plant (WIPP) waste certification program to use two newly developed technical standards: Contact-Handled Defense Transuranic Waste Packaging Instructions and Remote-Handled Defense Transuranic Waste Packaging Instructions. The technical standards are being developed from the DOE O 435.1 Notice, Contact-Handled and Remote-Handled Transuranic Waste Packaging, approved August 2011. The packaging instructions will provide detailed information and instruction for packaging almost every conceivable type of transuranic (TRU) waste for disposal at WIPP. While providing specificity, the packaging instructions leave to each site's own discretion the actual mechanics of how those Instructions will be functionally implemented at the floor level. While the Technical Standards are designed to provide precise information for compliant packaging, the density of the information in the packaging instructions necessitates a type of Rosetta Stone that translates the requirements into concise, clear, easy to use and operationally practical recipes that are waste stream and facility specific for use by both first line management and hands-on operations personnel. The Waste Generator Instructions provide the operator with step-by-step instructions that will integrate the sites' various operational requirements (e.g., health and safety limits, radiological limits or dose limits) and result in a WIPP certifiable waste and package that can be transported to and emplaced at WIPP. These little known but widely productive Waste Generator Instructions (WGIs) have been used occasionally in the past at large sites for treatment and packaging of TRU waste. The WGIs have resulted in highly efficient waste treatment, packaging and certification for disposal of TRU waste at WIPP. For example, a single WGI at LANL, combined with an increase in gram loading, resulted in a mind boggling 6,400% increase in waste loading for {sup 238}Pu heat source waste. In fact, the WGI combined with a new Contact Handled (CH) TRU Waste Content (TRUCON) Code provided a massive increase in shippable wattage per Transuranic Package Transporter-II (TRUPACT-II) over the previously used and more restrictive TRUCON Code that have been used previously for the heat source waste. In fact, the use of the WGI process at LANL's TA-55 facility reduced non-compliant drums for WIPP certification and disposal from a 13% failure rate down to a 0.5% failure rate and is expected to further reduce the failure rate to zero drums per year. The inherent value of the WGI is that it can be implemented in a site's current procedure issuance process and it provides documented proof of what actions were taken for each waste stream packaged. The WGI protocol provides a key floor-level operational component to achieve goal alignment between actual site operations, the WIPP TRU waste packaging instructions, and DOE O 435.1. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2009

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) Confirm compliance with environmental standards and requirements; and (4) highlight the WIPP Environmental Management System (EMS) and significant environmental programs and accomplishments, including progress toward the DOE Environmental Sustainability Goals. The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗