Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TITAN LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

United States launch vehicle systems

United States policy for national space launch capability provides for a balanced mix of launches, utilizing the Space Shuttle and Expendable Launch Vehicles (ELVs). The current mixed fleet includes the Space Shuttle and four expendable launch vehicles - Titan, Atlas, Delta, and Scout. New small class launch vehicles, including Pegasus, are in development. In addition, studies are underway to assure that the United States has cost-effective, reliable access to space, heavy-lift launch capability, and a new manned spacecraft after the current Space Shuttle reaches the end of its operational life. This paper highlights the current capabilities of the mixed fleet and summarizes the plans for new or modified United States launch vehicles through the first decade of the next century.

Krause, Robert B.↗

Final Environmental Impact Statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

Source record↗

Space transportation - Options and opportunities

The development space transportation options to earth orbit and beyond are summarized. The performance of available launch systems is reviewed, including the Scout, Delta, Long March 3, Atlas Centaur, Ariane 3, Titan 34D, Proton, the Japanese M-3S-II, N-1, and H-1, and the Space Shuttle. Launch vehicle which are planned or are under development are examined, including the Conestoga, Industrial Launch Vehicle, Titan II, Delta II, H-II, Ariane 5, Titan IV, and the NASA/DOD Heavy Lift Launch Vehicle. Also, issues pertinent to the development of space transportation vehicles are considered, such as reliability, reduced unit cost, reduced lead time, and improved payload accommodations.

Loftus, J. P., Jr.↗

Earth Observatory Satellite system definition study. Report 5: System design and specifications. Volume 1: Baseline system description

A system baseline design oriented to the requirements of the next generation of Earth Observatory Satellite missions is presented. The first mission (EOS-A) is envisioned as a two-fold mission which (1) provides a continuum of data of the type being supplied by ERTS for the emerging operational applications and also (2) expands the research and development activities for future instrumentation and analysis techniques. The baseline system specifically satisfies the requirements of this first mission. However, EOS-A is expected to be the first of a series of earth observation missions. Thus the baseline design has been developed so as to accommodate these latter missions effectively as the transition is made from conventional, expendable launch vehicles and spacecraft to the Shuttle Space Transportation System era. Further, a subset of alternative missions requirements including Seasat, SEOS, SMM and MSS-5 have been analyzed to verify that the spacecraft design to serve a multi-mission role is economically sound. A key feature of the baseline system design is the concept of a modular observatory system whose elements are compatible with varying levels of launch vehicle capability. The design configuration can be used with either the Delta or Titan launch vehicles and will adapt readily to the space shuttle when that system becomes available in the early 1980's.

Source record↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 1: Spacecraft configuration

The results of structural studies of the Earth Observatory Satellite (EOS) which define the member sizes to meet the vehicle design requirements are presented. The most significant requirements in sizing the members are the stiffness required to meet the launch vehicle design frequencies both in the late al and in the longitudinal directions. The selected configurations, both baseline and preferred, for the Delta and Titan launch vehicles were evaluated for stiffness requirements. The structural idealization used to estimate the stiffness of each structural arrangement, was based on an evaluation of primary loads paths, effectivity of structural members, and estimated sizes for the preferred configurations. The study included an evaluation of the following structural materials: (1) aluminum alloys, (2) titanium alloys, (3) beryllium, (4) beryllium/aluminum alloy, and (5) composite materials.

Source record↗

Monitoring Direct Effects of Delta, Atlas, and Titan Launches from Cape Canaveral Air Station

Launches of Delta, Atlas, and Titan rockets from Cape Canaveral Air Station (CCAS) have potential environmental effects that could arise from direct impacts of the launch exhaust (e.g., blast, heat), deposition of exhaust products of the solid rocket motors (hydrogen chloride, aluminum oxide), or other effects such as noise. Here we: 1) review previous reports, environmental assessments, and environmental impact statements for Delta, Atlas, and Titan vehicles and pad areas to clarity the magnitude of potential impacts; 2) summarize observed effects of 15 Delta, 22 Atlas, and 8 Titan launches; and 3) develop a spatial database of the distribution of effects from individual launches and cumulative effects of launches. The review of previous studies indicated that impacts from these launches can occur from the launch exhaust heat, deposition of exhaust products from the solid rocket motors, and noise. The principal effluents from solid rocket motors are hydrogen chloride (HCl), aluminum oxide (Al2O3), water (H2O), hydrogen (H2), carbon monoxide (CO), and carbon dioxide (CO2). The exhaust plume interacts with the launch complex structure and water deluge system to generate a launch cloud. Fall out or rain out of material from this cloud can produce localized effects from acid or particulate deposition. Delta, Atlas, and Titan launch vehicles differ in the number and size of solid rocket boosters and in the amount of deluge water used. All are smaller and use less water than the Space Shuttle. Acid deposition can cause damage to plants and animals exposed to it, acidify surface water and soil, and cause long-term changes to community composition and structure from repeated exposure. The magnitude of these effects depends on the intensity and frequency of acid deposition.

Schmalzer, Paul A.↗

Environmental noise assessment STS-1 Columbia launch

An environmental noise assessement of the initial launch of the Space Transportation System, STS-1 Columbia was conducted. The principal objective of the environmental noise assessment was to measure the noise generated during the initial launch of the space shuttle to ascertain the validity of the levels predicted in the 1979 environmental impact statement. In the 1979 study information obtained for expendable launch vehicles, Titan, Saturn and Atlas was used to predict the noise levels that would be generated by the simultaneous firing of the two solid rocket boosters and the three space shuttle main engines. Fifteen monitoring sites were established in accessable areas located from 4,953 to 23,640 meters from the launch pad. Precision sound level meters were used to capture the peak level during the launch. Data obtained was compared to the predicted levels and were also compared to the identified levels, standards and criteria established by the federal agencies with noise abatement and control responsibilities.

Putnicki, G. J.↗

Study to adapt solar electric propulsion to the Pioneer F and G spacecraft

The addition of an electric thrust subsystem to the spin-stabilized Pioneer F and G spacecraft to improve performance capability for certain missions is discussed. The evaluation was performed for the Atlas and Titan launch vehicles with Centaur and TE-364-4 stages and for electric thrust stages of 8- and 5-kw with three 30- and five 15-cm thrusters respectively. The combination of a spinning spacecraft with electric propulsion is a concept only recently evaluated and the penalty from spinning over three-axis stabilized is not as significant as might initally be thought. There are major gains in weight, cost, and reliability, the disadvantages being lower data rate during the thrust phase and less efficient pointing. A variety of missions were evaluated from a solar approach mission into 0.14 AU to a flyby mission of Neptune at approximately 30 AU. Performance improvements were present for all missions evaluated.

Source record↗

Achieving reliability - The evolution of redundancy in American manned spacecraft computers

The Shuttle is the first launch system deployed by NASA with full redundancy in the on-board computer systems. Fault-tolerance, i.e., restoring to a backup with less capabilities, was the method selected for Apollo. The Gemini capsule was the first to carry a computer, which also served as backup for Titan launch vehicle guidance. Failure of the Gemini computer resulted in manual control of the spacecraft. The Apollo system served vehicle flight control and navigation functions. The redundant computer on Skylab provided attitude control only in support of solar telescope pointing. The STS digital, fly-by-wire avionics system requires 100 percent reliability. The Orbiter carries five general purpose computers, four being fully-redundant and the fifth being soley an ascent-descent tool. The computers are synchronized at input and output points at a rate of about six times a second. The system is projected to cause a loss of an Orbiter only four times in a billion flights.

Tomayko, J. E.↗

Acoustic and thermal testing of the Titan/Centaur upper stage

A new version of the Centaur high-energy upper stage is being produced by General Dynamics for the USAF/Martin Marietta Titan launch vehicle. The Titan/Centaur upper stage is subject to consecutive acoustic and thermal testing in General Dynamics' Acoustic and Thermal Test Facility (ATTF). All data is acquired and processed digitally using the high-speed data acquisition system located in the ATTF. Processed data from over 250 sensors measuring acceleration, temperature, and sound pressure level is made available to the test team in minutes for use in making real-time test decisions. These tests represent the first consecutive large-scale environmental tests conducted on a complete, pressure stabilized, cryogenically tanked space launch vehicle. Some of the unique challenges involved in testing the Titan/Centaur and how these challenges were met using the ATTF are described.

Gehringer, Mark↗