Tennessee: Tennessee's Clean Energy Resources and Economy
This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Tennessee.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Tennessee.
Switchgrass is a potential bioenergy crop that could promote soil C sequestration in some environments. We compared four cultivars on a well-drained Alfisol to test for differences in biomass, C, and N dynamics during the fourth growing season. There was no difference (P > 0.05) among cultivars and no significant cultivar x time interaction in analyses of dry mass, C stocks, or N stocks in aboveground biomass and surface litter. At the end of the growing season, mean (±SE) aboveground biomass was 2.1±0.13 kg m-2, and surface litter dry mass was approximately 50% of aboveground biomass. Prior to harvest, the live root:shoot biomass ratio was 0.76. There was no difference (P > 0.05) among cultivars for total biomass, C, and N stocks belowground. Total belowground biomass (90-cm soil depth) as well as coarse (greater than or equal to 1 mm diameter) and fine (< 1 mm diameter) live root biomass increased from April to October. Dead roots were less than 7% of live root biomass to a depth of 90 cm. Net production of total belowground biomass (505 ±132 g m-2) occurred in the last half of the growing season. The increase in total live belowground biomass (426 ±139 g m-2) was more or less evenly divided among rhizomes, coarse, and fine roots. The N budget for annual switchgrass production was closely balanced with 6.3 g N m-2 removed by harvest of aboveground biomass and 6.7 g N m-2 supplied by fertilization. At the location of our study in west Tennessee, intra-annual changes in biomass, C, and N stocks belowground were of greater importance to crop management for C sequestration than were differences among cultivars.
Switchgrass (Panicum virgatum) is a perennial, warm-season grass that has been identified as a potential biofuel feedstock over a large part of North America. We examined above- and belowground responses to nitrogen fertilization in “Alamo” switchgrass grown in West Tennessee, USA. The fertilizer study included a spring and fall sampling of 5-year old switchgrass grown under annual applications of 0, 67, and 202 kg N ha -1 (as ammonium nitrate). Fertilization changed switchgrass biomass allocation as indicated by root:shoot ratios. End-of-growing season root:shoot ratios (mean ± SE) declined significantly (P ≤ 0.05) at the highest fertilizer nitrogen treatment (2.16 ± 0.08, 2.02 ± 0.18, and 0.88 ± 0.14, respectively, at 0, 67, and 202 kg N ha -1 ). Fertilization also significantly increased above- and belowground nitrogen concentrations and decreased plant C:N ratios. Data are presented for coarse live roots, fine live roots, coarse dead roots, fine dead roots, and rhizomes. At the end of the growing season, there was more carbon and nitrogen stored in belowground biomass than aboveground biomass. Finally, fertilization impacted switchgrass tissue chemistry and biomass allocation in ways that potentially impact soil carbon cycle processes and soil carbon storage.
This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI reports. Groundwater sampling was also conducted to support a Parcel 21d decision.
The Memphis Aquifer (MA) is located in the Mississippi Embayment that extends 250,000 square kilometers across eight states. Fayette and Haywood counties in West Tennessee are situated within the recharge zone of the MA and include the forthcoming Ford “mega campus” named Blue Oval City (BOC), which will consist of a vehicle-production facility and battery assembly division. Increased water demand and land cover change resulting from urban development, such as BOC in the MA’s narrow recharge zone, threaten the aquifer’s groundwater storage and recharge rate. Groundwater recharge factors that influence the narrow recharge zone of the MA include precipitation, evapotranspiration, runoff, and land cover type. In partnership with Protect Our Aquifer (POA) and the Center for Applied Earth Science and Engineering Research (CAESAR) at the University of Memphis, the team used data from the ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS), Integrated Multi-Satellite Retrievals for Global Precipitation Measurement (GPM IMERG), and Landsat 8 Operational Land Imager (OLI) and Thermal Infrared Sensor (TIRS). The team also used ancillary data from the National Land Cover Database (NLCD) and the North American Land Data Assimilation System (NLDAS) Noah Land Surface Model. These results identified “thriving” recharge locations, which are areas most conducive to aquifer recharge in Fayette County. The partners may use the results to prioritize specific areas in need of protection before they become susceptible to the effects of urbanization and industrialization.
On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)
The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe, efficient cleanup, and (3) an implementation section which describes how the partnering process will be conducted, as well as how disputes will be managed. The signed Partnering Framework and Partnering Agreement provide the needed foundation of the safe and cost-effective cleanup and re-industrialization of the ETTP Site. The benefits of partnering have already been observed as the Partnering Teams effectively addressed a number of early contract and project challenges such as funding reductions and progress in resolving Material Differences. Based, in part of the successes achieved as a result of the partnering between UCOR and DOE-ORO, UCOR and DOE-ORO are extending this partnering approach to a number of the ETTP Site stakeholders. For example, DOE-ORO, UCOR and CROET signed a Partnering Agreement on November 3, 2011. This Partnering Agreement affirms the parties' commitment to work collaboratively to re-industrialize the ETTP Site. Both DOE-ORO and UCOR are looking to extend this partnering approach with other Site stakeholders such as its employees, its subcontractors, the Oak Ridge National Laboratory and the Y-12 Security Complex in the future. (authors)
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.
The West TN portion of the Memphis aquifer, located within the Hatchie-Obion watershed is experiencing increased urban development, especially with the construction of "Blue Oval City", a battery manufacturing site for Ford's new electric trucks. Hayfood and Fayette counties fall within the sensitive recharge zone of the aquifer, and also contain the manufacturing megasite, making this an area of interest to highlight the consequences of increased urbanization to the aquifer. To understand the aquifers health, we averaged aquifer recharge factors seasonally to assess relationships from 2019-2022. Seasonal relationships were considered to highlight the hydrological factors that contribute to recharge, such as water balance, runoff, and evaporative stress that flux season to season (i.e. less precipitation in summer).
Explore the source record for details and available documents.
Explore the source record for details and available documents.
UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In 1989, the U.S. Environmental Protection Agency (EPA) added the Oak Ridge Reservation to the National Priorities List of sites and facilities that pose a sufficient threat to human health or the environment to warrant cleanup. The U.S. Department of Energy is cleaning up the Oak Ridge Reservation under a Federal Facility Agreement with the EPA and the Tennessee Department of Environment and Conservation. Many types of waste have been managed and disposed as part of the multi-decade cleanup effort. One unique facility, the Toxic Substance Control Act (TSCA) Incinerator, was constructed at the Department of Energy's Est Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Incinerator was constructed in the mid-1980's and underwent a series of test burns and readiness reviews to obtain the necessary environmental permits and operating approvals from state and federal regulatory agencies. With these in place, the incinerator began routine operations in 1991. It was designed and permitted for receiving, sorting, storing, preparing, and thermally destroying low-level radioactive and RCRA mixed waste contaminated with PCBs. The incinerator was named after a law passed in 1976 that provides the U.S. Environmental Protection Agency with authority to require reporting, record-keeping, testing, and restrictions relating to chemical substances and/or mixtures. During its operating lifetime, the one-of-a-kind thermal treatment facility burned materials regulated under TSCA and the Resource Conservation and Recovery Act (RCRA), most notably radiologically-contaminated polychlorinated biphenyls (PCBs). The TSCA Incinerator met or exceeded environmental regulations and DOE requirements for the treatment of these types of wastes. After more than 18 years of operation and more than 35 million pounds of waste safely incinerated, the TSCA Incinerator shut down operations on December 2, 2009. The TSCA Incinerator has been called a national resource for DOE sites from coast to coast. As the only U.S. facility permitted to incinerate specialized types of wastes, it not only accepted material from the Oak Ridge Reservation but also other facilities across the nationwide DOE complex. Over the years, a dynamic team of hard working and talented people operated and maintained the facility under the most stringent environmental permits and site requirements. The facility has played a key role in the treatment of radioactive PCB and hazardous wastes (mixed wastes) from the Oak Ridge Reservation, as well as from other facilities across the DOE complex. Through its support to over 20 sites in the DOE complex, environmental waste from past and ongoing operations has been safely and permanently treated. In the years since it was shut down, deactivation workers have been preparing TSCA for demolition. This work scope included triple cleaning, rinsing of all production equipment and tanks to RCRA clean criteria, filling sumps, encapsulating PCB and radioactive contamination, removal of universal waste (asbestos. lead and mercury), draining and disposal of residual water in tanks and transfer piping, and removing and disposing of carbon vessels, which were part of the water management system. In 2018, the facility was successfully deactivated and demolished, permanently removing one of the most unique facilities in the DOE complex. (authors)
Our hypothesis is that a high diversity of dominant life forms in Tennessee forests conveys resilience to disturbance such as climate change. Because of uncertainty in climate change and their effects, three climate change scenarios for 2030 and 2080 from three General Circulation Models (GCMs) were used to simulate a range of potential climate conditions for the state. These climate changes derive from the Intergovernmental Panel on Climate Change (IPCC) A1B storyline that assumes rapid global economic growth. The precipitation and temperature projections from the three GCMs for 2030 and 2080 were related to changes in five ecological provinces using the monthly record of temperature and precipitation from 1980 to 1997 for each 1 km cell across the state as aggregated into the provinces. Temperatures are projected to increase in all ecological provinces in all months for all three GCMs for both 2030 and 2080. Precipitation differences from the long-term average are more complex but less striking. The forest ecosystem model LINKAGES was used to simulate conditions for five ecological provinces from 1989 to 2300. Average output projects changes in tree diversity and species composition in all ecological provinces in Tennessee with the greatest changes in the Southern Mixed Forest province. Projected declines in total tree biomass are followed by biomass recovery as species replacement occurs in stands. The Southern Mixed Forest province results in less diversity in dominant trees as well as lower overall biomass than projections for the other four provinces. The biomass and composition changes projected in this study differ from forest dynamics expected without climate change. These results suggest that biomass recovery following climate change is linked to dominant tree diversity in the southeastern forest of the US. The generality of this observation warrants further investigation, for it relates to ways that forest management may influence climate change effects.
With the completion of the Spallation Neutron Source (SNS) and upgrading of the High-Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) the state of Tennessee now leads the world in the capability of neutron scattering research. This project aimed at directing the great impact of these facilities to researchers in the EPSCoR states, Tennessee in particular, by creating a research collaboration network around these facilities. The plan consisted of two parts: (1) Direct effort to increase the user base through the travel fellowship for graduate students and faculty from the EPSCoR states to use the neutron facilities at the ORNL, and through workshops and schools on the application of neutron scattering, and (2) Research collaboration among the core participants from UTK, ORNL and other states. The EPSCoR Travel Fellowship Program has supported over 300 distinct and 600 cumulative neutron facility users and over 250 workshop participants, with the total of nearly 600 distinct recipients. This program has been highly popular particularly among young faculty members who often have difficulty in raising travel funds, and enabled participation of young graduate students to neutron research. This program has been the foundation of this project. We supported several educational workshops, organized one (“neutrons for novice”) by ourselves each year, targeting non-users of neutron scattering. These efforts significantly contributed to expand the neutron user base among the EPSCoR states. The core research targeted condensed matter physics and soft matter sciences. The core research groups participating in this project include not only researchers from Tennessee but those from Kansas, South Carolina, Puerto Rico and Louisiana, making this project a national, rather than regional, enterprise. Collaborations that were seeded by this project have grown into two major projects, one in materials science (irradiation effects on high-entropy alloys) and the other in soft matter sciences (bio-membranes). Through this project we promoted the use of neutron scattering, particularly in biological and life sciences and in energy sciences, and facilitated the DOE investment in this field to impact wide fields of science and engineering. This project was administered through the Joint Institute for Neutron Sciences (JINS) of the University of Tennessee (UT) and ORNL. JINS is jointly supported by both UT and ORNL, and participate in organizing workshops and schools to promote the use of neutron scattering.
The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.