Engineering PapersSearch

SEARCH · Engineering Papers

Results for “TELESCOPE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Eyes on the Universe: The Legacy of the Hubble Space Telescope and Looking to the Future with the James Webb Space Telescope

Over the past 20 years the Hubble Space Telescope has revolutionized our understanding of the Universe. Most recently, the complete refurbishment of Hubble in 2009 has given new life to the telescope and the new science instruments have already produced groundbreaking science results, revealing some of the most distant galaxy candidates ever discovered. Despite the remarkable advances in astrophysics that Hubble has provided, the new questions that have arisen demand a new space telescope with new technologies and capabilities. I will present the exciting new technology development and science goals of NASA's James Webb Space Telescope, which is currently being built and tested and will be launched this decade.

Straughn, Amber

Hubble Space Telescope and James Webb Space Telescope

Over the past 20 years the Hubble Space Telescope has revolutionized our understanding of the Universe. Most recently, the complete refurbishment of Hubble in 2009 has given new life to the telescope and the new science instruments have already produced ground breaking science results, revealing some of the most distant galaxy candidates ever discovered. Despite the remarkable advances in astrophysics that Hubble has provided, the new questions that have arisen demand a new space telescope with new technologies and capabilities. I will present the exciting new technology development and science goals of NASA's James Webb Space Telescope, which is currently being built and tested and will be launched this decade.

Straughn, Amber

Looking Back in Time: Building the James Webb Space Telescope (JWST) Optical Telescope Element

When it launches in 2018, the James Webb Space Telescope (JWST) will look back in time at the earliest stars and galaxies forming in the universe. This talk will look back in time at the development of the JWST telescope. This will include a discussion of the design, technology development, mirror development, wave front sensing and control algorithms, lightweight cryogenic deployable structure, pathfinder telescope, and integration and test program evolution and status. The talk will provide the engineering answers on why the mirrors are made of Beryllium, why there are 18 segments, where and how the mirrors were made, how the mirrors get aligned using the main science camera, and how the telescope is being tested. It will also look back in time at the many dedicated people all over the country who helped build it.

JWST OTE

Imaging Analysis of the Hard X-Ray Telescope ProtoEXIST2 and New Techniques for High-Resolution Coded-Aperture Telescopes

Wide-field (greater than or approximately equal to 100 degrees squared) hard X-ray coded-aperture telescopes with high angular resolution (greater than or approximately equal to 2 minutes) will enable a wide range of time domain astrophysics. For instance, transient sources such as gamma-ray bursts can be precisely localized without the assistance of secondary focusing X-ray telescopes to enable rapid followup studies. On the other hand, high angular resolution in coded-aperture imaging introduces a new challenge in handling the systematic uncertainty: the average photon count per pixel is often too small to establish a proper background pattern or model the systematic uncertainty in a timescale where the model remains invariant. We introduce two new techniques to improve detection sensitivity, which are designed for, but not limited to, a high-resolution coded-aperture system: a self-background modeling scheme which utilizes continuous scan or dithering operations, and a Poisson-statistics based probabilistic approach to evaluate the significance of source detection without subtraction in handling the background. We illustrate these new imaging analysis techniques in high resolution coded-aperture telescope using the data acquired by the wide-field hard X-ray telescope ProtoEXIST2 during a high-altitude balloon flight in fall 2012. We review the imaging sensitivity of ProtoEXIST2 during the flight, and demonstrate the performance of the new techniques using our balloon flight data in comparison with a simulated ideal Poisson background.

balloons - instrumentation: detectors - techniques

S056 X-ray telescope experiment on the Skylab Apollo Telescope Mount

This paper describes the S056 X-ray instrument which was carried aboard the Skylab Apollo Telescope Mount as part of the solar instrument cluster. The instrument, which was built at the NASA Marshall Space Flight Center, consisted of a glancing incidence X-ray telescope to record solar images in the 6-40-A region, together with an X-ray event analyzer to monitor the total solar soft X-ray flux in several wavelength bands. The X-ray telescope used film as a recording medium and thin foil filters to isolate specific wavelength bands. The instrument subsystems are described in detail and typical results presented.

Underwood, J. H.

Telescope protection algorithm for the Space Infrared Telescope Facility

This paper presents a proposed on-board Telescope Protection Algorithm (TPA) for the Space Infrared Telescope Facility (SIRTF). This TPA consists of hardware and software capable of performing both fail-operational and fail-safe modes of operation. In the fail-operational mode, each ephemeris load and slew/dwell command sequence is checked on-board before use. The slew command monitor detects unallowable slew/dwell commands and transfers control to an algorithm which slews to and maintains a safe telescope orientation while preserving precise attitude determination and control. This fail-operational mode is also given the authority to autonomously restart the slew/dwell sequence at a point beyond the faulty command. The fail-safe system consists of software and hardware which detects impending earth, moon, or sun avoidance zone violations and activates a backup hardware safe hold mode. The subject TPA and relevant sensor complement were designed for the SIRTF mission; however, this system can easily be used as a basis for failure detection and correction in a wide range of other missions.

Class, B. F.

An early lunar-based telescope - The Lunar Transit Telescope (LTT)

The first telescope accompanying return to the moon, a simple but elegant two meter class instrument capable of producing an extraordinary survey of the universe is proposed. This telescope produces a deep image of the sky obtained simultaneously in several broad bandpasses in the wavelength range from about 0.1 to 2 microns, with diffraction limited imaging in the infrared and approximately 0.1 arcsec resolution at shorter wavelengths. In an 18.6 year mission, the survey would include approximately 2 percent of the sky with multiple observations of all the surveyed area. This survey is accomplished with a telescope which has no moving parts and requires no continuing support beyond initial deployment.

Mcgraw, John T.

Design of Large Lightweight Space Telescope Optical Systems for the Next Generation Space Telescope

The Next Generation Space Telescope (NGST) is currently in a Pre Phase A study effort to prove feasibility of design and to show that the design can be implemented within cost constraint guidelines and meet the requirements of the science community. In an effort to achieve the science communities goals as outlined in "HST and Beyond" the NGST team has developed a government "yardstick" design of an eight meter diameter segmented telescope which would be launched in an Atlas IIAS launch vehicle to a L2 (Lagrange Point) orbit. This paper will discuss the design of the Optical Telescope Assembly (OTA) and the various issues and complications of designing lightweight optics to be placed in the environment that the NGST will encounter both during launch and during its operational mission at L2. The OTA must be lightweight but structurally must withstand the launch environment and transfer to its final L2 orbit. The OTA must be stable at L2 to provide high quality science at the cryogenic temperatures it will experience. The OTA segmented petal concept is to develop lightweight optics which can either be manipulated to achieve and maintain a desired figure or be rigid enough so that change in shape is only necessary for phasing and alignment. The secondary mirror structural mast must also be rigid with frequency responses which are not coupled to spacecraft modes in order to maintain and decenter and despace requirements.

Jacobson, Dave

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Development Status

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) is a segmented, cryogenic telescope scheduled for launch in 2011. In September of 2002, NASA selected prime contractor Northrop Grumman Space Technology (NGST) to build the observatory including management of the OTE. NGST is teamed with subcontractors Ball Aerospace, Alliant Techsystems (ATK). and Kodak. The team has completed several significant design, technology, architecture definition, and manufacturing milestones in the past year that are summarized in this paper.

Feinberg, Lee D.

Measuring the Cryogenic Optical Alignment Between the Telescope Element and the Instruments Module of the James Webb Space Telescope

The alignment between the Aft Optical Subsystem (AOS) and the Integrated Science Instruments Module (ISIM) is non-adjustable in orbit, so the alignment must be carefully verified in a cryogenic vacuum environment prior to launch. Optical point source locations calibrated by optical metrology instruments are imaged through the AOS onto the Science Instruments to determine focal, lateral, and clock angle alignment. The pupil image of the AOS is overlaid onto the pupil image of the NIRCam to determine the tip and tilt alignment. In addition, an image from fiducial lights at the Primary Mirror checks the pupil alignment between the telescope entrance pupil, the telescope pupil mask, and the NIRCam aperture stop. The image positions are combined to determine the relative alignment between the Optical Telescope Element (OTE) and the ISIM in all six degrees of freedom with corresponding alignment uncertainties. Uncertainties in the position of focused images of the test sources and images from the pupils are derived from sensitivities of an optical model of the system and the Science Instrument sensing capability. Additional uncertainty in the pupil alignment measurement is due to uncertainty in the analytical removal of gravity effects that simulate the on-orbit alignment environment.

Whitman, Tony

James Webb Space Telescope Optical Telescope Element Mirror Development History and Results

In a little under a decade, the James Webb Space Telescope (JWST) program has designed, manufactured, assembled and tested 21 flight beryllium mirrors for the James Webb Space Telescope Optical Telescope Element. This paper will summarize the mirror development history starting with the selection of beryllium as the mirror material and ending with the final test results. It will provide an overview of the technological roadmap and schedules and the key challenges that were overcome. It will also provide a summary or the key tests that were performed and the results of these tests.

Feinber, Lee D.

James Webb Space Telescope Optical Telescope Element Mirror Coatings

James Webb Space Telescope (JWST) Optical Telescope Element (OTE) mirror coating program has been completed. The science goals of the JWST mission require a uniform, low stress, durable optical coating with high reflectivity over the JWST spectral region. The coating has to be environmentally stable, radiation resistant and compatible with the cryogenic operating environment. The large size, 1.52 m point to point, light weight, beryllium primary mirror (PM) segments and flawless coating process during the flight mirror coating program that consisted coating of 21 flight mirrors were among many technical challenges. This paper provides an overview of the JWST telescope mirror coating program. The paper summarizes the coating development program and performance of the flight mirrors.

Keski-Kuha, Ritva A.

James Webb Space Telescope Optical Telescope Element/Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirror center of curvature optical tests, electrical and operational tests, acoustics and vibration testing at the Goddard Space Flight Center before being shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparation for the cryogenic optical testing, the JWST project has built a Pathfinder telescope and has completed two Optical Ground System Equipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize optical test results to date and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (OTIS) Status

The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated ScienceInstrument Module (ISIM)are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirrorcenter of curvatureoptical tests, electrical and operational tests, acoustics and vibration testing at the Goddard SpaceFlight Center beforebeing shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparationfor the cryogenicoptical testing, the JWST project has built a Pathfinder telescope and has completed two OpticalGround SystemEquipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize opticaltest results todate and status the final Pathfinder test and the OTIS integration and environmental test preparations

Feinberg, Lee

Addressing Thermal Model Run Time Concerns of the Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA)

The Wide Field Infrared Survey Telescope using Astrophysics Focused Telescope Assets (WFIRST-AFTA) utilizes an existing 2.4 m diameter Hubble sized telescope donated from elsewhere in the federal government for near-infrared sky surveys and Exoplanet searches to answer crucial questions about the universe and dark energy. The WFIRST design continues to increase in maturity, detail, and complexity with each design cycle leading to a Mission Concept Review and entrance to the Mission Formulation Phase. Each cycle has required a Structural-Thermal-Optical-Performance (STOP) analysis to ensure the design can meet the stringent pointing and stability requirements. As such, the models have also grown in size and complexity leading to increased model run time. This paper addresses efforts to reduce the run time while still maintaining sufficient accuracy for STOP analyses. A technique was developed to identify slews between observing orientations that were sufficiently different to warrant recalculation of the environmental fluxes to reduce the total number of radiation calculation points. The inclusion of a cryocooler fluid loop in the model also forced smaller time-steps than desired, which greatly increases the overall run time. The analysis of this fluid model required mitigation to drive the run time down by solving portions of the model at different time scales. Lastly, investigations were made into the impact of the removal of small radiation couplings on run time and accuracy. Use of these techniques allowed the models to produce meaningful results within reasonable run times to meet project schedule deadlines.

Thermal Analysis

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg