Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TANK”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Analysis of Tank 38H (HTF-38-25-36, -32) and Tank 43H (HTF-43-25-33, -35) Samples for Support of the Enrichment Control and Corrosion Control Programs

Savannah River National Laboratory (SRNL) analyzed samples from Tank 38H and Tank 43H to support the Enrichment Control Program (ECP) and Corrosion Control Program (CCP). The results indicate the concentrations of most soluble species in the Tank 38H surface sample are similar to the previous Tank 38H surface sample. The current Tank 38H subsurface sample shows similar Na, free hydroxide, and anions in comparison to the previous subsurface sample. The current Tank 38H subsurface sample appears brown in color. Measurement of the wt.% insoluble solids in the Tank 38H subsurface sample and associated uncertainty analysis indicates that the calculated average wt.% insoluble solids is 5.5 ± 3.6 wt.%. Significant differences in the concentrations of major components between the Tank 38H surface and subsurface samples indicate stratification of solution species between these two locations within the Tank 38H. The current Tank 43H surface sample is ~ 10% diluted versus the previous Tank 43H surface sample and the Tank 43H subsurface sample is similar in composition to the previous Tank 43H subsurface sample. Information provided by SRMC on tank additions since the last ECP sampling indicates that a total of about 4,062 gallons of water was added to Tank 43H. This addition could account for the observed relatively small dilution of ~ 10% in the Tank 43H surface sample. Similar solution compositions measured in the current Tank 43H surface and subsurface samples indicate a minimal stratification within the tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Critical Assumptions in the F-Tank Farm Operational Closure Documentation Regarding Waste Tank Internal Configurations

The intent of this document is to provide clarification of critical assumptions regarding the internal configurations of liquid waste tanks at operational closure, with respect to F-Tank Farm (FTF) closure documentation. For the purposes of this document, FTF closure documentation includes: (1) Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the FTF PA) (SRS-REG-2007-00002), (2) Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site (DOE/SRS-WD-2012-001), (3) Tier 1 Closure Plan for the F-Area Waste Tank Systems at the Savannah River Site (SRR-CWDA-2010-00147), (4) F-Tank Farm Tanks 18 and 19 DOE Manual 435.1-1 Tier 2 Closure Plan Savannah River Site (SRR-CWDA-2011-00015), (5) Industrial Wastewater Closure Module for the Liquid Waste Tanks 18 and 19 (SRRCWDA-2010-00003), and (6) Tank 18/Tank 19 Special Analysis for the Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the Tank 18/Tank 19 Special Analysis) (SRR-CWDA-2010-00124). Note that the first three FTF closure documents listed apply to the entire FTF, whereas the last three FTF closure documents listed are specific to Tanks 18 and 19. These two waste tanks are expected to be the first two tanks to be grouted and operationally closed under the current suite of FTF closure documents and many of the assumptions and approaches that apply to these two tanks are also applicable to the other FTF waste tanks and operational closure processes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H samples from tank closure cesium removal (TCCR) Batch 3 - intermediate and final samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Revision 1 of this report contains additional analyses of the fourth interim sample including inductively coupled plasma – mass spectrometry (ICP-MS) results and activities of other radionuclides. These results are consistent with the previously reported results, showing leaching from the Tank 11H heel. Notably, the 90 Sr activity was about 2.7x higher than calculated from a mixture of the original Tank 11H supernate and the Tank 10H supernate as treated by TCCR, suggesting additional leaching of Sr from the Tank 11H heel solids. In addition, Revision 1 includes analysis results for the Batch 3 Post-Production surface and variable depth samples collected in October of 2020. The Post-Production surface sample was similar in composition to the fourth interim surface sample, except for the increased Cs-137 and oxalate concentrations that were presumably associated with leaching of the Tank 11H heel solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal 1A (TCCR 1A) Batch 1

Savannah River Mission Completion (SRMC) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR 1A unit processes dissolved salt fed from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST, IONSIV TM R9120-B, 30x60) and the effluent is then discharged to Tank 11H. In support of the TCCR 1A program, SRNL analyzed samples taken from Tank 11H (without tank mixing) before, during, and at the completion of TCCR 1A Batch 1 processing. Tank 11H serves as the receipt tank for the filtered and cesium removed product from the TCCR 1A system. Processing of Batch 1 commenced on January 13, 2022 and completed on February 17, 2022, after processing approximately 70,100 gallons. A pre-production sample was collected from the heel remaining in Tank 11H just before Batch 1 processing began. In addition, five interim surface samples were collected from Tank 11H during processing, and both a surface and a variable depth sample (VDS, ~7” from tank bottom) were collected just after processing completed. Analysis of all samples included density and gamma spectroscopy, in addition to a more comprehensive suite of analytes for the pre- and post-production samples. The density of the pre-production sample was the highest of all samples measured and was then observed to decrease for the first two interim samples, followed by becoming fairly consistent for the remainder of the samples (~1.3 g/mL). The density of 1.3 g/mL is similar to the density measured for one of the three Tank 10H qualification samples (HTF-10-21-126). The 137 Cs activity was found to decrease as additional decontaminated effluent from the TCCR columns was added to Tank 11H during processing; however, an increase in activity was observed during periods of no processing which can be attributed to leaching of 137 Cs from the known solids in Tank 11H. The Cs isotope concentrations in the Tank 11H postproduction surface sample were determined to be 99.7-99.8% lower than the concentrations measured in the Tank 10H feed as measured by mass spectrometry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Efforts to Gain Insight into Historical Leak Events from the Single-Shell Tank A-105 in the Hanford 241-A Tank Farm - 20113

The 241-A Tank Farm is a single-shell tank (SST) farm constructed to store process waste from Hanford nuclear operations. Millions of gallons of nuclear waste were stored in the 241-A Tank Farm SSTs and some of the SSTs leaked in the past. In addition, spills and pipeline leaks during transfers and storage and intentional discharges to cribs and trenches resulted in releasing waste to the ground. Tank liner leaks are referred to as 'leaks' and all other discharges to the soil are referred to as 'releases.' Liquid waste that could be removed by pumping has been removed from all of the SSTs to reduce the potential for future leaks. The most significant historical leak event in 241-A Tank Farm occurred in 1965 when tank A-105 experienced a pressurized steam event. This event resulted in damage to the inner steel liner flooring of A-105, which was separated from the sidewalls over part of its circumference and buckled up to 2.5 m, vertically. During this event up to 7,570 L of contaminated liquid may have leaked to the adjacent soil. This leak occurred under extreme temperature and pressure conditions. Modeling efforts to better understand the nature and extent of historical leaks from subsurface SSTs that were used to store highly radioactive, self-boiling liquid wastes at 241-A Tank Farm have recently been undertaken. These efforts have compiled the available historical information to support a preliminary non-isothermal, multiphase flow and chemical transport modeling effort to re-create the conditions under which the leaks occurred and to formulate a conceptual model as to the extent and distribution of leaked radioactive contaminants in the adjacent soil material. The focus of this work was on developing an understanding of the key features, processes and bounding conditions related to tank A-105 leak events that occurred in the 1960's. The activities include estimation of leak composition, non-isothermal multiphase flow and transport modeling, and geochemical modeling. The STOMP{sup C} Water-Air-Energy modeling code was utilized to implement the three-dimensional representation of the subsurface tank and the surrounding flow field. Once constructed, the model was used to evaluate the conceptual understanding of leaks originating from different parts of the tank under the elevated temperature boundary conditions that were imposed by surrounding tanks at the time of the historical leaks. The chemical evolution of the liquid waste was also evaluated as it leaked from the tank under transient pressure and temperature gradients. The results of the preliminary evaluation suggested the presence of a heat-pipe effect beneath tank A-105 in which water vapor at an elevated temperature is driven away from the base of the tank to a position where water vapor cools, condenses and is then drawn back toward the tank by the strong capillary attraction of the dry soil. A non-sorbing contaminant (Tc-99) was introduced into this flow field to better understand the potential distribution patterns of leaked contaminants that may have occurred during the historical leak events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 21 and tank 24 blend and feed study: blending times, settling times, and transfers

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks were evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest the solid particles have higher density and/or larger size than indicated by previous analysis of SRS sludge and sludge simulants. (5) Tank 21 waste characterization, laboratory settling tests, and additional field turbidity measurements during mixing evolutions are recommended to better understand potential risk for extended (> 60 days) settling times in Tank 21.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Inspection NDE Results for Fiscal Year 2014, Waste Tanks 26, 27, 28 and 33

Ultrasonic nondestructive examinations (NDE) were performed on waste storage tanks 26, 27, 28 and 33 at the Savannah River Site as a part of the “In-Service Inspection (ISI) Program for High Level Waste Tanks.” No reportable conditions were identified during these inspections. The results indicate that the implemented corrosion control program continues to effectively mitigate corrosion in the SRS waste tanks. Ultrasonic inspection (UT) is used to detect general wall thinning, pitting and interface attack, as well as vertically oriented cracks through inspection of an 8.5 inch wide strip extending over the accessible height of the primary tank wall and accessible knuckle regions. Welds were also inspected in tanks 27, 28 and 33 with no reportable indications. In a Type III/IIIA primary tank, a complete vertical strip includes scans of five plates (including knuckles) so five “plate/strips” would be completed at each vertical strip location. In FY 2014, a combined total of 79 plate/strips were examined for thickness mapping and crack detection, equating to over 45,000 square inches of area inspected on the primary tank wall. Of the 79 plate/strips examined in FY 2014 all but three have average thicknesses that remain at or above the construction minimum thickness which is nominal thickness minus 0.010 inches. There were no service induced reportable thicknesses or cracking encountered. A total of 2 pits were documented in 2014 with the deepest being 0.032 inches deep. One pit was detected in Tank 27 and one in Tank 33. No pitting was identified in Tanks 26 or 28. The maximum depth of any pit encountered in FY 2014 is 5% of nominal thickness, which is less than the minimum reportable criteria of 25% through-wall for pitting. In Tank 26 two vertical strips were inspected, as required by the ISI Program, due to tank conditions being outside normal chemistry controls for more than 3 months. Tank 28 had an area of localized thinning on the exterior wall of the secondary tank noted during the initial inspections in 2005. That area was inspected again in 2014 and found to be larger and slightly deeper. The deepest area of thinning in the secondary wall is less than 20% wall loss. The maximum length of thinning is less than 24 inches and does not impact structural or leak integrity per WSRC-TR-2002-00063. Inspection results were presented to the In-service Inspection Review Committee (ISIRC) where it was determined that no additional data was required to complete these inspections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Single-Shell Tank and Double-Shell Tank Integrity Programs - 16390

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks. Concerns related to aging radioactive waste storage facilities throughout the DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems. The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them. The Double-Shell Tank (DST) integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. In October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of 241-AY-102 was leaking. WRPS contracted a panel of experts from industry and academia to provide advice and recommendations for the DST Integrity Program. The panel focused on three concerns: - No Early warning - Determine why the existing DST Integrity Program did not predict a primary tank failure or provide early warning of the pending failure. - Program improvements - Recommend activities to either predict a primary tank failure or increase the probability of early warning. - Forensic recommendations - The panel provided additional recommendations regarding forensic assessment of Tank 241-AY-102 (AY-102) to facilitate a conclusion on why the leak occurred. WRPS has prepared a response to the concerns of the panel coupled with recommendations for project action to strengthen the DST Integrity Program [4]. The purpose of this DST Integrity Improvement Plan is to translate the recommendations to specific project activities that are technically and practically responsive. To improve the understanding of the Single-Shell Tank (SST) integrity, WRPS, the Department of Energy-Office of River Protection tank operations contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matter experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase, which was completed in 2015, was focused on efforts to envelope the integrity of the tanks. It was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary, based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the tanks and liners. The two combined phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by an Independent Qualified Registered Professional Engineer. This paper will summarize the current status of the DST and SST Integrity Programs and discuss the ongoing efforts to improve these programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of tank 38H (HTF-38-17-18, -19) and tank 43H (HTF-43-17-20, -21) samples for support of the enrichment control and corrosion control programs

SRNL analyzed samples from Tank 38H and Tank 43H to support ECP and CCP. The total uranium in the Tank 38H samples ranged from 53.7 mg/L for the surface sample to 57.0 mg/L in the sub-surface sample. The Tank 43H samples showed uranium concentrations of 46.2 mg/L for the surface sample and 45.7 mg/L in the sub-surface sample. The U-235 percentage was 0.63% in the Tank 38H samples and 0.62% in the Tank 43H samples. The total uranium and percent U-235 results appear consistent with recent Tank 38H and Tank 43H uranium measurements. The plutonium results for the Tank 38H surface sample are slightly higher than recent sample results, while the Tank 43H plutonium results are within the range of values measured on previous samples. The Cs-137 results for the Tank 38H surface and subsurface samples are slightly higher than the concentrations measured in recent samples. The Cs-137 results for the two Tank 43H samples are within the range of values measured on previous samples. The comparison of the sum of the cations in each sample versus the sum of the anions shows a difference of 23% for the Tank 38H surface sample and 18% for the Tank 43H surface sample. The four samples show silicon concentrations somewhat lower than the previous samples with values ranging from 80.2 to 105 mg/L.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-23-95, -96) and Tank 43H (HTF-43-23-93, -94) Samples for Support of the Enrichment Control and Corrosion Control Programs

Savannah River National Laboratory analyzed samples from Tank 38H and Tank 43H to support Enrichment Control Program (ECP) and Corrosion Control Program (CCP). The results indicate the concentrations of most soluble species in the Tank 38H surface sample increased significantly from the previous Tank 38H surface sample. The current Tank 38H subsurface sample shows similar Na, free hydroxide, and anions versus the previous subsurface sample. However, the 38H subsurface sample shows higher concentrations of Al, Ca, Fe, Mn, and Si vs. the previous Tank 38H subsurface sample. The current Tank 38H subsurface sample contained visible sludge solids in excess of the previous sample based on visual appearance. Weight percent solids measurements indicate presence of 3.0 ± 0.1 wt.% insoluble solids in the Tank 38H subsurface sample. The significant differences in the concentrations of major components between the Tank 38H surface and subsurface samples indicate significant stratification of solution species between these two locations within the Tank 38H. Savannah River Mission Completion (SRMC) personnel indicated that there were no tank-to-tank transfers into Tank 38H since early January 2023 and the 2H (16H) Evaporator was shut down on 3/26/2023 and has not operated since that time. There have been many pumped non-waste transfers of water from the H-Area diversion box 7 (HDB-7) sump into Tank 38 since the 3/26/2023 date.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Processing Batches for Tank Closure Cesium Removal Through In-Tank Batch Contact Testing - 20470

The Tank Closure Cesium Removal (TCCR) process at the Savannah River Site (SRS) is currently processing waste from Tank 10H, generating decontaminated salt solution that is sent to Tank 11H. Transfers out of Tank 11H are then disposed of on site as a grout wasteform in the SRS Saltstone Processing Facility. This is a full-scale demonstration of the use of Crystalline Silicotitanate (CST) for the decontamination of aqueous nuclear waste supernate. CST primarily removes cesium from the high sodium alkaline feed, but also adsorbs strontium, actinides, and some other trace metals. The TCCR unit is an at-tank set of four ion exchange columns, with two typically being operated in series during waste processing. Tank 10H is serving a dual function as both the salt dissolution tank as well as the feed tank for the TCCR system. Prior to operation of TCCR, Tank 10H must undergo dissolution campaigns, dissolving the salt cake to form an aqueous salt solution (supernate). After each dissolution campaign, the supernate created must be qualified prior to processing through the TCCR system. Qualification includes detailed characterization of the supernate as well as in-tank batch contact tests to determine the equilibrium loading of Cs-137 on the CST ion exchange media (IONSIV{sup TM} R9120-Ba). In support of the in-tank batch contact testing, Savannah River National Laboratory (SRNL) developed a CST sample holder, also referred to as a 'tea-bag', to hold a measured amount (∼0.1 grams) of pretreated CST between stainless steel screens. The tea-bag fits within a standard stainless steel sample vial that has been modified to allow the flow of supernate to the CST. This sample holder is then immersed in the waste tank allowing free contact between the CST beads and the surrounding liquid, at an effectively infinite liquid-to-solid phase ratio. A pair of tea-bags are deployed in the tank for a period of 10 days for each batch, after which the CST is recovered, digested, and analyzed to determine the loading of cesium isotopes on the CST. This result then supports the TCCR column thermal loading limits for processing as part of the TCCR safety basis. This paper will discuss the design and testing of the CST sample holder, as well as results from the first few batches of waste qualified and subsequently processed through the TCCR system. In addition, results from analyses of Tank 11H samples, showing decontamination of the product will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 27 Solids Disturbance Testing Using M-Star for the Impact of CSMP Usage on Blend Tank Mixing Effectiveness

Savannah River Mission Completion (SRMC) plans to operate Tank 27as a blend tank for future waste disposal operations. It is desirable to avoid additional worker exposure by using the planned commercial submersible mixing pump (CSMP) installations in Risers B2 and B4 to function as the blend pumps for prolonged blend tank operations. The purpose of this task is to evaluate the impacts to mixing across a range of pump installation heights from 1 to 201 inches above the tank floor. The CSMPs shall maintain adequate blending within a 24 hour maximum timeframe and an adequate nozzle discharge velocity as outlined in U-ESR-G-00030, using the specifications of the planned CSMPs listed in PO SRRA149971 and M-DS-G-00081. Specifications include: maximum pump diameter of D=22.5 in., dual nozzles placed tangentially opposed with nominal inside diameter of 2 in., total flow range (both nozzles combined) of 500 to 1950 GPM and maximum RPM of 1800. Tank 27 is expected to have a fill height maximum of 360". This analysis began by using results from the 2010 testing and applying them to the Tank 27 design to calculate a mixing time as a function of pump flow rate. These results were modified to account for the higher liquid level in Tank 27. Once the liquid level was increased to 360 inches, the results were modified to account for a higher viscosity in Tank 27 than in the testing. Once the viscosity was increased, the effect of changing pump elevation was applied to calculations of the mixing time in Tank 27. Finally, the uncertainty from the testing was included in the analysis to recommend a blend time as a function of pump flow rate and elevation. The conclusion from this study is that the particles in tank 27 will be suspended at both the 600 and 900 gpm flow rates. Only particles above 90 micron will not be suspended in significant amounts when the flow rate is 600 gpm. At 900 gpm even 100 micron particles were thoroughly suspended in the tank. From the series of simulations it has been concluded that it will not be possible to mix tank 27 at the proposed fluid flow rates and not suspend the solid particles at the bottom of the tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-20-62, -63) and Tank 43H (HTF-43-20-60, -61) Samples for Support of the Enrichment Control and Corrosion Control Programs

SRNL analyzed samples from Tank 38H and Tank 43H to support ECP and CCP. The results indicate the concentrations of most species in the Tank 38H surface sample increased from the previous surface sample. The Tank 38H sub-surface sample shows only small changes in concentration for most major species in the solution from the previous sample. The large differences in the concentrations of major components between the Tank 38H surface and sub-surface samples indicate significant stratification of solution species within the tank. The Tank 38H surface and sub-surface samples both contained a small amount of sludge solids (<1 wt%). The Tank 43H surface and sub-surface samples are slightly more dilute than the previous samples. The Tank 43H sub-surface sample exhibits a composition more concentrated than the surface sample indicating some stratification within the tank. The Tank 38H surface and sub-surface sample both show large increases in the concentrations of uranium and plutonium likely due to the presence of sludge solids in both samples. (Note: the samples were digested and analyzed without filtration.) The total uranium concentrations of the two Tank 43H samples are similar to the previous sample results. The plutonium concentration in both Tank 43H samples appear to have decreased from the previous samples; however, the surface sample concentrations are close to the detection limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Tank 38H (HTF-38-17-52, -53) and Tank 43H (HTF-43-17-54, -55) Samples for Support of the Enrichment Control and Corrosion Control Programs

SRNL analyzed samples from Tank 38H and Tank 43H to support ECP and CCP. The total uranium in the Tank 38H surface sample was 41.3 mg/L while the sub-surface sample was 43.5 mg/L. The Tank 43H samples contained total uranium concentrations of 28.5 mg/L in the surface sample and 28.1 mg/L in the sub-surface sample. The U-235 percentage ranged from 0.62% to 0.63% for the Tank 38H samples and Tank 43H samples. The total uranium and percent U-235 results in the table appear slightly lower than recent Tank 38H and Tank 43H uranium measurements. The plutonium results in the table show a large difference between the surface and sub-surface sample concentrations for Tank 38H. The Tank 43H plutonium results closely match the range of values measured on previous samples. The Cs-137 results for the Tank 38H surface and sub-surface samples show similar concentrations slightly higher than the concentrations measured in recent samples. The Cs-137 results for the two Tank 43H samples also show similar concentrations within the range of values measured on previous samples. The four samples show silicon concentrations somewhat lower than the previous samples with values ranging from 124 to 168 mg/L.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completion of the Operational Closure of Tank 18F and Tank 19F at the Savannah River Site by Grouting - 13236

Radioactive waste is stored in underground waste tanks at the Savannah River Site (SRS). The low-level fraction of the waste is immobilized in a grout waste form, and the high level fraction is disposed of in a glass waste form. Once the waste is removed, the tanks are prepared for closure. Operational closure of the tanks consists of filling with grout for the purpose of chemically stabilizing residual material, filling the tank void space for long-term structural stability, and discouraging future intrusion. Two of the old-style single-shell tanks at the SRS have received regulatory approval confirming waste removal had been completed, and have been stabilized with grout as part of completing operational closure and removal from service. Consistent with the regulatory framework, two types of grout were used for the filling of Tanks 18F and 19F. Reducing grout was used to fill the entire volume of Tanks 18F and 19F (bulk fill grout) and a more flowable grout was used to fill equipment that was left in the tank (equipment fill grout). The reducing grout was added to the tanks using portable grout pumps filled from concrete trucks, and delivered the grout through slick lines to the center riser of each tank. Filling of the two tanks has been completed, and all equipment has been filled. The final capping of riser penetrations brings the operation closure of Tanks 18F and 19F to completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization Strategy of a Limited Number of Radioactive Waste Effluent Tanks in View of Decommissioning a Large Number of Tanks - 20286

In order to organize the D and D of the former effluent treatment facility at the CEA Cadarache Center (France), the key data to gather through the facility characterization are the following:: volumes and masses, liquid/solid distribution and specific activity. By studying the treatment processes and the history of the facility, families of tanks have been defined and a reference tank chosen for investigation in each family. The intrusive investigations (video, residue thickness, dose rate..), the gamma spectrometry measurements carried out on site on the residue samples and radiochemical results collected in laboratories, led us to conclude that there was a relative radiological homogeneity (for specific activity and Am-241/Cs-137 ratio) within each tank. The next step consisted in extrapolating the specific activity evaluated for the reference tanks, to the other tanks of each family by using data such as geometry, dose rate or the function of the tanks within the process. Thus, a cartography of the 130 tanks of the facility is available. Finally, the conclusions drawn from the radiological homogeneity of the tanks and their affiliation to homogeneous, well-identified tank clusters lead to a simple and efficient operational approach for the D and D of the 130 tanks of the facility. Indeed, because of the residue characteristics (homogeneous activity and strong differentiation of Cs/Am ratio), a sample collected when opening the tank, and measured on site by gamma spectrometry will allow us to validate the operational design and the emptying techniques defined during the D and D study phase thanks to the characterization of a limited number of reference tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and Quantification of Technetium Species in Hanford Waste Tank AN-102

Technetium-99 (Tc) generated from the fission of 235U and 239Pu in high yields is one of the most difficult contaminants to be addressed at the U.S. Department of Energy Hanford Site. In strongly alkaline solutions typifying Hanford tank waste, Tc exists as pertechnetate (TcO4-) (oxidation state VII) as well as in reduced forms (oxidation state < VII) collectively known as non-pertechnetate species. Designing strategies for effective Tc management, including separation and immobilization, necessitates understanding the molecular structure of the non- pertechnetate species and their identification in the actual tank waste samples, which would facilitate development of new treatment technologies effective for dissimilar Tc species. Toward this objective, a spectroscopic library of the Tc(I) [fac-Tc(CO)3]+ and Tc(IV, VII) compounds was generated using a range of techniques and applied to the characterization of the actual tank waste supernatant collected from the tank 241-AN-102 at Hanford, WA. A sample of the 241-AN-102 tank waste supernatant was processed to adjust Na concentration to about 5.6 M and remove 137Cs by spherical resorcinol-formaldehyde (sRF) ion exchange resin. Cesium-loaded sRF column was eluted with 0.5 M HNO3. As received AN-102, Cs-depleted AN-102 effluent, and sRF eluate fractions were comprehensively characterized for chemical composition and speciation of Tc using 99Tc nuclear magnetic resonance spectroscopy and X-ray absorption spectroscopy. It was demonstrated for the first time that non-pertechnetate Tc present in the 241-AN-102 tank waste is composed of several low-valent Tc species, including the Tc(I) [fac-Tc(CO)3]+ and Tc(IV) compounds. This is the second experimental observation of the [fac-Tc(CO)3]+ species in the Hanford tank waste and the first demonstration of multiple forms of non-pertechnetate species existing simultaneously in the waste, cumulatively highlighting their importance for the waste processing.

Low Activity Waste (LAW), High Level Waste, nuclea↗

SU-E-T-118: Analysis of Variability and Stability Between Two Water Tank Phantoms Utilizing Water Tank Commissioning Procedures

Purpose: The commissioning criteria of water tank phantoms are essential for proper accuracy and reproducibility in a clinical setting. This study outlines the results of mechanical and dosimetric testing between PTW MP3-M water tank system and the Standard Imaging Doseview 3D water tank system. Methods: Measurements were taken of each axis of movement on the tank using 30 cm calipers at 1, 5, 10, 50, 100, and 200 mm for accuracy and reproducibility of tank movement. Dosimetric quantities such as percent depth dose and dose profiles were compared between tanks using a 6 MV beam from a Varian 23EX LINAC. Properties such as scanning speed effects, central axis depth dose agreement with static measurements, reproducibility of measurements, symmetry and flatness, and scan time between tanks were also investigated. Results: Results showed high geometric accuracy within 0.2 mm. Central axis PDD and in-field profiles agreed within 0.75% between the tanks. These outcomes test many possible discrepancies in dose measurements across the two tanks and form a basis for comparison on a broader range of tanks in the future. Conclusion: Both 3D water scanning phantoms possess a high degree of spatial accuracy, allowing for equivalence in measurements regardless of the phantom used. A commissioning procedure when changing water tanks or upon receipt of a new tank is nevertheless critical to ensure consistent operation before and after the arrival of new hardware.

60 APPLIED LIFE SCIENCES↗