EUV FEL light source based on energy recovery linac with on-orbit laser plasma injection

We report on a week-long study of a conceptual design of EUV FEL light source based on an energy recovery linac with on-orbit laser plasma accelerator injection scheme. We carried out this study during USPAS Summer 2023 session of Unifying Physics of Accelerators, Lasers and Plasma applying the art of inventiveness TRIZ. An ultrashort Ti-sapphire laser accelerates electron beams from a gas target with mean energy of 20 MeV, which are then ramped up to 1 GeV in a five-turn scheme with a series of fixed field alternating magnets and two superconducting RF cavities (100 MeV per cavity per turn). The electron beam is then bypassed to an undulator line optimized to generate EUV light of 13.5 nm at kW level in a single pass.

43 PARTICLE ACCELERATORS↗

Concept of circular-linear energy recovery accelerator to probe the energy frontier

Energy-frontier accelerators provide powerful tools performing high precision measurements confirming the fundamentals of the physics and broadening new research horizons. Such machines are either driven by circular or linear accelerators. The circular machines, having the centre-of-mass (CM) energy values reaching 200 GeV (for leptons) and above, experience beam energy loss and quality dilution, for example, due to synchrotron radiation, limiting the overall CM energy achievable and requiring a constant energy top-up to compensate the loss and the beam quality dilution. Linear colliders overcome these limitations, while the finite capabilities of generating high average current beams limits the luminosity. This is partially compensated by the quality of the colliding beams. In this work, we suggest a novel design of circular-linear accelerator based on the merging of the “non-emitting”, low-energy storage rings and energy recovery linear accelerators. We suggest using the recently considered dual-axis asymmetric cavities to enable the operation of such a system, and in particular the energy recovery from spent, high-intensity beams. The machine considered, under the scope of the SNOWMASS-2021 initiative, can be potentially used to reach ultimate energy frontiers in high-energy physics as well as to drive next generation light sources. The merging of circular and linear systems, and applications of dual axes cavities, should allow the maintaining of high beam quality, high luminosity, and high energy efficiency, while offering a flexible energy management and opening clear opportunity for reducing the running cost. We note that the numbers shown in the paper are for illustration purpose and can be improved further.

43 PARTICLE ACCELERATORS↗

A new ductile, tougher resin for impregnation of superconducting magnets

A major remaining challenge for Nb 3 Sn high field magnets is their training due to random temperature variations in the coils. The main objective of our research is to reduce or eliminate it by finding novel impregnation materials in replacement of the epoxies currently used. An organic olefin-based thermosetting dicyclopentadiene resin, C 10 H 12 , commercially available in Japan as TELENE® by RIMTEC, was used to impregnate a short Nb 3 Sn undulator coil developed by ANL and FNAL. This magnet reached short sample limit after only two quenches, compared with ∼100 when CTD-101K® was used. Ductility, i.e. the ability to accept large strains, and toughness were identified as key properties to achieve these results. In addition, we have been investigating whether mixing TELENE with high heat capacity ceramic powders such as Gd 2 O 3 , Gd 2 O 2 S, and HoCu 2 , increases the specific heat (C p ) of impregnated Nb3Sn superconducting magnets. The viscosity, heat capacity, thermal conductivity, and other physical properties of TELENE with high-C p powder fillers were measured in this study as a function of temperature and magnetic field. The TELENE-87 wt%Gd 2 O 2 S had a peak in C p between 4.3 K and 5.3 K at fields between 0 and 8 T. We have also investigated the effect on the mechanical properties of pure and mixed TELENE under 10 MGy of gamma ray irradiation at the Takasaki Advanced Radiation Research Institute in Takasaki, Japan. TELENE-87 wt%Gd 2 O 2 S exhibited exceptional radiation resistance. Impregnating an undulator coil with TELENE mixed with Gd 2 O 2 S powder will verify whether the coils' thermal stability further improves, or whether its low diffusivity will require engineering the material with high-thermal conductivity components. Short magnet training will lead to better magnet reliability, lower magnet margins, lower risk and substantial saving in accelerators' commissioning costs. Part of this study is supported by the U.S.-Japan Science and Technology Cooperation Program in high energy physics operated by MEXT in Japan and DOE in the U.S.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Medium grain niobium SRF cavity production technology for science frontiers and accelerator applications

Herein we present the cost-effective production of superconducting radio frequency (SRF) cavities made of medium grain (MG) niobium (Nb) discs directly sliced from forged and annealed billet. This production method provides clean surface conditions and reliable mechanical characteristics with sub-millimeter average grain size resulting in stable SRF cavity production. We propose to apply this material to particle accelerator in the science and industrial applications. The science applications require high field gradients(≥ 30 MV/m) particularly in pulsed mode. The industrial applications require high $Q_0$ values with moderate gradients (~ 20 MV/m) in CW mode operation. This paper describes the MG Nb disc production recently demonstrated and discusses future prospects for application in advanced particle accelerators in the science and industrial applications.

47 OTHER INSTRUMENTATION↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Unconventional ideas for ionization cooling of muons

Small muon beams increase the luminosity of a muon collider. Reducing the momentum and position spreads of muons reduces emittance and leads to small, cool beams. Ionization cooling has been observed at the Muon Ionization Cooling Experiment. 6D emittance reduction by a factor of 100, 000 has been achieved in simulation. Another factor of 5 in cooling would meet the basic requirements of a high luminosity muon collider. In this paper we compare, for the first time, the amount of RF needed in a cooling channel to previous linacs. Here, we also outline three methods aimed to help achieve a final factor of 5 in 6D cooling.

43 PARTICLE ACCELERATORS↗

Recent activities of National Synchrotron Light Source-II Insertion Device Group

Insertion Device (ID) Group at the National Synchrotron Light Source-II (NSLS-II) has been involved in the following activities: Installation and maintenance of the HEX-Superconducting Wiggler (SCW), Laboratory Directed Research and Development (LDRD) for SC adaptive gap undulator (AGU), NSLS-II Experimental Tools II & III (NEXT-II & III) project IDs. Improvement of in-vacuum flip coil bench, development of in-vacuum pulsed wire bench and upgrade of a regular flip coil bench. Development of rotating coil bench for the lattice magnets for future upgrade. This paper describes the specifics of each activity.

47 OTHER INSTRUMENTATION↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Heavy ion beam physics at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) will be the world's premier rare-isotope beam facility. Experiments with the majority (~80%) of the isotope predicted to exist will become available. The FRIB facility is based on a superconducting (SC) heavy ion linac with output energy above 200 MeV/u for any ions at beam power of 400 kW. FRIB includes a target facility for in-flight production of rare isotopes. A three-stage fragment separator will be used to prepare fast rare isotope beams with high-purity for nuclear physics experiments. The installation work of the accelerator and experimental systems is approaching completion and multi-stage beam commissioning activities started in summer 2017 with expected project completion in early 2022. In conclusion, the commencement of operation for users' experiments is planned immediately following the project completion.

43 PARTICLE ACCELERATORS↗