Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Shepherding Metadata Through the Building Lifecycle

Many different digital representations of a building are produced over the course of its lifecycle. These representations contain the metadata required to support different stages of the building, from initial planning and design, to construction and commissioning, through operations, audits, retrofits and maintenance. However, because of differences in the semantics, structure and syntax of these representations, the metadata they contain is not interoperable. We present a novel method for leveraging these representations to create a unified, authoritative Brick metadata model for a building that can be continually maintained over the course of the building lifecycle. A simple synchronization protocol relays inferred Brick metadata from existing metadata sources such as gbXML, BuildingSync, Project Haystack and Modelica to a central integration server, which merges the metadata into a valid Brick model.

Fierro, Gabe↗

Interactive Metadata Integration with Brick

Many different digital representations of a building are produced over the course of its lifecycle. While these representations individually contain metadata required to support different stages of the building's lifecycle, they are largely not interoperable due to differences in structure, syntax and semantics. This impedes the development and deployment of data-driven applications providing fault detection and diagnosis, virtual metering or optimal control. [4] introduces a new platform for the continuous curation of a unified, Brick [1]-based metadata model that can be maintained throughout the building lifecycle. In this demonstration, we present a live proof-of-concept implementation of the platform with support for several metadata representations in the context of a simulated building lifecycle.

Fierro, Gabe↗

Maximum Cs-137 Curie Loading onto Crystalline Silicotitanate for the Documented Safety Analysis of the Tank Side Cesium Removal Platform

The Tank Side Cesium Removal (TSCR) system is currently being constructed to process Hanford tank waste supernates for vitrification. TSCR incorporates a filtration system and cesium (Cs) removal system using columns filled with crystalline silicotitanate (CST) ion exchanger, produced by Honeywell UOP, LLC. The documented safety analysis (DSA) developed for TSCR limits a single column curie loading to 141,600 Ci; given a 137 Cs isotopic mass fraction of 20% and the planned CST bed size of a TSCR column, this equates to 0.10 mmole Cs per g CST. Factors that influence 137Cs loading onto the CST include, but are not limited to, CST production lot (different production lots behave differently), contact temperature, contact duration, 137Cs mass fraction, and competitors in the tank waste feed. Seventeen tank waste feeds (compositions) were identified by Washington River Protection Solutions to be processed through TSCR. These feed compositions were used to develop a simulant (referred to herein as Stage 1) that would provide an upper bound to the Cs loading onto CST based on maximizing the Cs/Na activity coefficient ratios in solution while maintaining Na at no less than 5.0 M. Building upon this Stage 1 simulant, a series of four additional simulants were developed based on the cationic/anionic species that impact Cs exchange, with each successive formulation relaxing one or more matrix component concentration constraints as show in Table S.1

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An overview of data tools for representing and managing building information and performance data

Building information modeling (BIM) has been widely adopted for representing and exchanging building data across disciplines during building design and construction. However, BIM's use in the building operation phase is limited. With the increasing deployment of low-cost sensors and meters, as well as affordable digital storage and computing technologies, growing volumes of data have been collected from buildings, their energy services systems, and occupants. Such data are crucial to help decision makers understand what, how, and when energy is consumed in buildings—a critical step to improving building performance for energy efficiency, demand flexibility, and resilience. However, practical analyses and use of the collected data are very limited due to various reasons, including poor data quality, ad-hoc representation of data, and lack of data science skills. To unlock value from building data, there is a strong need for a toolchain to curate and represent building information and performance data in common standardized terminologies and schemas, to enable interoperability between tools and applications. This study selected and reviewed 24 data tools based on common use cases of data across the building life cycle, from design to construction, commissioning, operation, and retrofits. The selected data tools are grouped into three categories: (1) data dictionary or terminology, (2) data ontology and schemas, and (3) data platforms. The data are grouped into ten typologies covering most types of data collected in buildings. This study resulted in five main findings: (1) most data representation tools can represent their intended data typologies well, such as Green Button for smart meter data and Brick schema for metadata of sensors in buildings and HVAC systems, but none of the tools cover all ten types of data; (2) there is a need for data schemas to represent the basis of design data and metadata of occupant data; (3) standard terminologies such as those defined in BEDES are only adopted in a few data tools; (4) integrating data across various stages in the building life cycle remains a challenge; and (5) most data tools were developed and maintained by different parties for different purposes, their flexibility and interoperability can be improved to support broader use cases. Finally, recommendations for future research on building data tools are provided for the data and buildings community based on the FAIR principles to make data Findable, Accessible, Interoperable, and Reusable.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Late-Stage Research Development and Demonstration Sub-activities Updates – FY24 Q3

Oak Ridge National Laboratory (ORNL), in collaboration with the Pacific Northwest National Laboratory (PNNL), the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Hummingbird Firm (a specialized consulting firm focused on promoting diversity, equity, and inclusion considerations), has initiated a national initiative known as the Heat Pump (HP) and Heat Pump Water Heater (HPWH) Field Validation Partnership. This effort involves active participation from numerous critical entities involved in research and market transformation within the field. The ORNL team is responsible for leading Late-Stage Research Development and Demonstration (LSRDD) among the four different topics. The overall outcomes of this project will be: (1) A structured Field Validation Partnership between DOE, the national labs, research, implementation, and market transformation organizations. This will result in unique way to coordinate field validation plans and collect relevant data from around the country into the HP and HPWH Field Validation Database. (2) The Field Validation Partnership will result in a continuous stream of information between DOE and the major industry players in the space of HPs and HPWHs. If desired, DOE could use this information to inform roadmaps related to HP and HPWH market adoption and research going forward. (3) The structure of this Partnership provides a mechanism for sharing lessons learned directly between Late-Stage RD&D, Building Integration Barriers, Regional Market and Policy and Workforce Development efforts. The result will be training content that is well-reviewed by the Partnership which will lead to a workforce that meets the industry’s quality and workforce supply demands. (4) The structure of this Partnership also provides an opportunity for regions to share lessons learned on policy and market transformation with each other through the Market and Policy core Committee. This report includes an update in Late-Stage Research Development and Demonstration.

99 GENERAL AND MISCELLANEOUS↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multigene engineering in plants: Technologies, applications, and future prospects

The emerging bioeconomy presents a promising solution to both economic and environmental challenges. Within the bioeconomy, plants serve as a renewable, sustainable, and cost-effective source of foods, fuels, chemicals, and materials. However, traditional breeding and single-gene engineering approaches fall short in addressing complex traits (e.g., drought tolerance, disease resistance, yield, nutrient use efficiency) which are controlled by multiple genes. The complexity of plant biology often necessitates the use of multigene engineering (MGE), which involves simultaneous ectopic expression, up/down-regulation, or editing of multiple genes, to enhance plant traits relevant to the bioeconomy. These genes may be associated with distinct traits or function as components of specific metabolic and regulatory pathways. This review summarizes current technologies for MGE within the synthetic biology-driven Design-Build-Test-Learn (DBTL) framework, detailing its four key stages: Design – gene construct development; Build – DNA assembly and plant transformation; Test – the molecular, biochemical, and physiological characterization of engineered plants; and Learn – computational modeling to refine, multiplex and iterate the process. Despite good progress in the applications of MGE in biofortification, metabolic engineering, and stress resilience, challenges remain in construct stability, coordinated gene expression, and regulatory predictability. We identified optimization paths and future directions to accelerate MGE deployment in sustainable agriculture, with possible societal benefits including reduced production costs, increased yield, and improved food and nutritional security.

AI-aided plant engineering↗

Two-Stage Reinforcement Learning Policy Search for Grid-Interactive Building Control

This paper develops an intelligent grid-interactive building controller, which optimizes building operation during both normal hours and demand response (DR) events. To avoid costly on-demand computation and to adapt to non-linear building models, the controller utilizes reinforcement learning (RL) and makes real-time decisions based on a near-optimal control policy. Learning such a policy typically amounts to solving a hard non-convex optimization problem. We propose to address this problem with a novel global-local policy search method. In the first stage, an RL algorithm based on zero-order gradient estimation is leveraged to search for the optimal policy globally, due to its scalability and the potential to escape some poor performing local optima. The obtained policy is then fine-tuned locally to bring the first-stage solution closer to that of the original unsmoothed problem. Experiments on a simulated five-zone commercial building demonstrate the advantages of the proposed method over existing learning approaches. They also show that the learned control policy outperforms a pragmatic linear model predictive controller (MPC) and approaches the performance of an oracle MPC in testing scenarios. Using a state-of-the-art advanced computing system, we demonstrate that the controller can be learned and deployed within hours of training.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Deep Reinforcement Learning From Demonstrations to Assist Service Restoration in Islanded Microgrids

Microgrids can be operated in island mode during utility grid outages to support service restoration and improve system resilience. To schedule and dispatch distributed energy resources (DERs) in an islanded microgrid, conventional model-based methods rely on accurate distribution network models and lack generalization and adaptability. Data-driven methods are promising for DER coordination but face practical challenges such as potential hazards to microgrids during online training and insufficient online training opportunities due to low outage rates. This paper presents a novel two-stage learning framework that builds on the deep deterministic policy gradient from demonstrations to identify an optimal restoration strategy. At the pre-training stage, imitation learning is applied to equip the control agent with expert experiences to guarantee acceptable initial performance. At the online training stage, action clipping, reward shaping, and expert demonstrations are leveraged to ensure safe exploration while accelerating the training process. In conclusion, the proposed method is illustrated using the IEEE 123-node system and compared with a representative model-based method and the standard deep deterministic policy gradient method to prove solution accuracy and demonstrate increased computational efficiency.

Du, Yan↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Grid-Interactive Building Control Via Reinforcement Learning

In this work, we present the proposed two-stage reinforcement learning approach for training building controllers to help buildings to participate in DR events. The original conference paper for this research idea can be found at https://www.nrel.gov/docs/fy21osti/78000.pdf.

building control↗

A Spectroscopic Road Map for Cosmic Frontier: DESI, DESI-II, Stage-5

In this white paper, we present an experimental road map for spectroscopic experiments beyond DESI. DESI will be a transformative cosmological survey in the 2020s, mapping 40 million galaxies and quasars and capturing a significant fraction of the available linear modes up to z=1.2. DESI-II will pilot observations of galaxies both at much higher densities and extending to higher redshifts. A Stage-5 experiment would build out those high-density and high-redshift observations, mapping hundreds of millions of stars and galaxies in three dimensions, to address the problems of inflation, dark energy, light relativistic species, and dark matter. These spectroscopic data will also complement the next generation of weak lensing, line intensity mapping and CMB experiments and allow them to reach their full potential.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Categorizing Plug Load Solutions by Ease of Implementation

Plug loads account for a growing share of U.S. commercial building electricity use, projected to rise from 16% today to 21% by 2050. Managing these loads presents a substantial opportunity for reducing energy costs while providing additional operational benefits, such as improved asset management and occupant comfort. Despite their potential, plug loads are numerous, diverse, and highly occupant-dependent, making control challenging. This publication organizes plug load control strategies by level of effort, offering building owners and operators a staged approach to implement interventions ranging from smart outlets and automatic receptacle controls to behavioral strategies. By following these actionable steps, building stakeholders can reduce energy consumption, lower utility bills, and realize broader operational advantages.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mitigation for roof alterations to building 06-cp-65 at the area 6 control point, nevada national security site, nye county, nevada

Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).

54 ENVIRONMENTAL SCIENCES↗

Sinter formation during directed energy deposition of titanium alloy powders

During directed energy deposition (DED) additive manufacturing, powder agglomeration and sintering can occur outside of the melt pool when using titanium alloy powders. Using in situ synchrotron radiography we investigate the mechanisms by which sintering of Ti6242 powder occurs around the pool, performing a parametric study to determine the influence of laser power and stage traverse speed on sinter build-up. The results reveal that detrimental sinter can be reduced using a high laser power or increased stage traverse speed, although the latter also reduces deposition layer thickness. The mechanism of sinter formation during DED was determined to be in-flight heating of the powder particles in the laser beam. Calculations of particle heating under the processing conditions explored in this study confirm that powder particles can reasonably exceed 700 °C, the threshold for Ti surface oxide dissolution, and thus the powder is prone to sintering if not incorporated into the melt pool. The build-up of sinter powder layer on deposit surfaces led to lack of fusion pores. To mitigate sinter formation and its detrimental effects on DED component quality, it is essential that the powder delivery spot area is smaller than the melt pool, ensuring most powder lands in the melt pool.

36 MATERIALS SCIENCE↗

Understanding Metal–Organic Framework Nucleation from a Solution with Evolving Graphs

A mechanistic understanding of metal–organic framework (MOF) synthesis and scale-up remains underexplored due to the complex nature of the interactions of their building blocks. In this work, we investigate the collective assembly of building units at the early stages of MOF nucleation, using MIL-101(Cr) as a prototypical example. Using large-scale molecular dynamics simulations, we observe that the choice of solvent (water and N,N-dimethylformamide), the introduction of ions (Na+ and F–) and the relative populations of MIL-101(Cr) half-secondary building unit (half-SBU) isomers have a strong influence on the cluster formation process. Additionally, the shape, size, nucleation and growth rates, crystallinity, and short and long-range order largely vary depending on the synthesis conditions. We evaluate these properties as they naturally emerge when interpreting the self-assembly of MOF nuclei as the time evolution of an undirected graph. Solution-induced conformational complexity and ionic concentration have a dramatic effect on the morphology of clusters emerging during assembly. While pure solvents lead to the rapid formation of a small number of large clusters, the presence of ions in aqueous solutions results in smaller clusters and slower nucleation. This diversity is captured by the key features of the graph representation. Principle component analysis on graph properties reveals that only a small number of molecular descriptors is needed to deconvolute MOF self-assembly. Furthermore, descriptors such as the average coordination number between half-SBUs and fractal dimension are of particular interest as they can be can be followed experimentally by techniques like by time-resolved spectroscopy. Ultimately, graph theory emerges as an approach that can be used to understand complex processes revealing molecular descriptors accessible by both simulation and experiment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Controls Optimization Final Report, Controls Algorithms Report, Control Optimization - SPA II: Heaving Buoy Test Results [Three reports]

The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners’ WEC devices, including; CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on an at-sea prototype that is to be custom-built and maturing the HW and SW required to successfully run our advanced controls code frameworks on at-sea systems. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to RT capability, robustness, and reliability.

16 TIDAL AND WAVE POWER↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗