Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Space Launch System (SLS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Methodologies for Verification and Validation of Space Launch System (SLS) Structural Dynamic Models: Appendices

Verification and validation (V&V) is a highly challenging undertaking for SLS structural dynamics models due to the magnitude and complexity of SLS subassemblies and subassemblies. Responses to challenges associated with V&V of Space Launch System (SLS) structural dynamics models are presented in Volume I of this paper. Four methodologies addressing specific requirements for V&V are discussed. (1) Residual Mode Augmentation (RMA). (2) Modified Guyan Reduction (MGR) and Harmonic Reduction (HR, introduced in 1976). (3) Mode Consolidation (MC). Finally, (4) Experimental Mode Verification (EMV). This document contains the appendices to Volume I.

Coppolino, Robert N.

Development of the Multi-Purpose Transportation System for the Space Launch System (SLS) Core Stage (CS) Flight Article

NASA's Multi-Purpose Transportation System (MPTS) is designed to transport the Space Launch System (SLS) vehicle segments by waterway and roadway. It is tasked with transporting the vehicle from where it is manufactured to its intermediate test location and final launch destination. Its design incorporates mechanisms that release degrees of freedom to prevent excessive loading during transit and ensure a successful delivery of the vehicle to its intended destination. In addition to the Core Stage (CS) flight article, the system will also move three Structural Test Articles (STAs), the Dynamic Demonstration Unit (DDU), and a simulated CS Pathfinder (weight, center of gravity, outer mold line dimensions, and overall length) over road terrain at four NASA centers and on the Pegasus barge. The MPTS independently supports the article at both ends while operating as a combined unit through automated monitoring of its released degree of freedom and corrective responses. This allows the system to constrain its payload in a statically determinate manner while traversing highly variable terrain. Multi-body simulation of the transportation route is useful to predict free-body motion within its range of mobility. The MPTS has completed its design and analysis developmental cycles. This paper describes the design challenges encountered in developing this system of large-scale structure, which incorporates complex mechanisms. The unique techniques and methodologies developed for analytical assessment of the hardware are also discussed.

Sandridge, Sarah

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

Application of Norton-Thevenin Receptance Coupling (NTRC) to Space Launch System (SLS) Payload Coupled Loads Analysis (CLA)

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS

Space Launch System (SLS) Human Factors Engineering Modeling & Analysis

The Human Systems Integration & Engineering (HSI&E) team at NASA’s Marshall Space Flight Center (MSFC) strives to advocate for the humans in the loop of Space Launch System’s (SLS) ground operations. Using assessment methods like human simulation, virtual reality, and physical mockups, both flight hardware and ground support equipment (GSE) are evaluated for human integration. Those ranging from 5th percentile female (approximately 5’2” tall) to 95th percentile male (approximately 6’2” tall) should be able to perform all SLS stacking operations. Operations include element physical mates, element electrical mates, and testing activities. The primary human simulation software used is Process Simulate Human (PSH) made by Siemens. This software supplies highly accurate human manikins that can interact with CAD models. PSH was used to evaluate the Transportation and Integration Platform’s (TIP) side opening that was designed for access to the Payload Adapter (PLA) cables. Technicians will need to access these cables for testing purposes before element stacking at Kennedy Space Center (KSC). After performing an analysis in PSH using the TIP side opening, it was found that neither a 5th percentile female or a 95th percentile male could perform the task as the designers had intended. There is a C-beam that blocks access to the cables (both physically and visually). An alternative analysis was performed using PSH to look at another access point to the PLA cables. Although this method would disrupt already established procedures and produce more work, the designers confirmed it was an option. Instead of technicians accessing the cables through the side opening in the TIP, a human simulation was performed for going through a panel opening in the bottom of the TIP. This method requires removal of a TIP panel and a stepladder of at least 36 inches for a 5th percentile female to access the cables.

human factors

Development of the Multi Purpose Transportation System for the Space Launch System (SLS) Core Stage (CS) Flight Article

NASA’s Multi Purpose Transportation System (MPTS) is designed to transport the Space Launch System vehicle segments by waterway and roadway. It is tasked with transporting the vehicle from where it is manufactured to its intermediate test location and final launch destination. Its design incorporates mechanisms that release degrees of freedom to prevent excessive loading during transit and ensure a successful delivery of the vehicle to its intended destination. In addition to the CS (Core Stage) flight article, the system will also move three structural test articles and a simulated CS Pathfinder (weight, center of gravity, outer mold line dimensions, and overall length) over road terrain on four NASA centers and on the Pegasus barge. The MPTS independently supports the article at both ends while communicating as a combined unit through automated monitoring of its released degree of freedom and corrective responses. This allows the system to constrain its payload in a statically determinate manner while traversing across highly variable terrain. Multi-body simulation of the transportation route is useful to predict free-body motion within the specified travel ranges. The MPTS has completed its design and analysis developmental cycles. This unpublished paper will describe the design challenges encountered in developing this system of large scale structure which incorporates complex mechanisms. The unique techniques and methodologies developed for analytical assessment of the hardware will be also be discussed. Key results from analytical evaluations as well as ongoing performance testing will be presented.

Sandridge, Sarah

Asymmetric Flow State Switching on the Space Launch System (SLS) Block 2 Crew Vehicle

An in-depth investigation was conducted at the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel to evaluate flow state switching in the liftoff flow environment of the Space Launch System Block 2 Crew launch vehicle using side force measurements, two-component particle image velocimetry, and tufts flow visualization. Multimodal flow states were observed in the gap flow between the centerbody and solid rocket boosters at a range of incoming flow angles and were characterized for the relative strength of state switches. When flow switches occur, the flow is predominantly bimodal, but trimodal flow states are observed with the launch tower downstream of the vehicle. Tufts visualization indicates three-dimensionality during flow state switching, which initiates at one part of the gap and quickly transitions throughout the length of the booster. Due to the long time scales between switches, statistics such as frequency of flow state switches and converged state probabilities cannot be established without significantly increased acquisition times.

Lee J. Mears

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System

Space Launch System (SLS) Program Overview NASA Research Announcement (NRA) Advanced Booster (AB) Engineering Demonstration and Risk Reduction (EDRR) Industry Day

SLS is a national capability that empowers entirely new exploration for missions of national importance. Program key tenets are safety, affordability, and sustainability. SLS builds on a solid foundation of experience and current capacities to enable a timely initial capability and evolve to a flexible heavy-lift capability through competitive opportunities: (1) Reduce risks leading to an affordable Advanced Booster that meets the evolved capabilities of SLS (2) Enable competition by mitigating targeted Advanced Booster risks to enhance SLS affordability and performance The road ahead promises to be an exciting journey for present and future generations, and we look forward to working with you to continue America fs space exploration.

May, Todd A.