23 records · Page 2

STS-51 pad abort. OV103-engine 2033 (ME-2) fuel flowmeter sensor open circuit

The STS-51 initial launch attempt of Discovery (OV-103) was terminated on KSC launch pad 39B on 12 Aug. 1993 at 9:12 AM E.S.T. due to a sensor redundancy failure in the liquid hydrogen system of ME-2 (Engine 2033). The event description and time line are summarized. Propellant loading was initiated on 12 Aug. 1993 at 12:00 AM EST. All space shuttle main engine (SSME) chill parameters and Launch Commit Criteria (LCC) were nominal. At engine start plus 1.34 seconds a Failure Identification (FID) was posted against Engine 2033 for exceeding the 1800 spin intra-channel (A1-A2) Fuel Flowrate sensor channel qualification limit. The engine was shut down at 1.50 seconds followed by Engines 2032 and 2030. All shut down sequences were nominal and the mission was safely aborted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 111-101, Fuel Flowrate Intra-Channel Test Channel A disqualification. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to an open circuit in a Fuel Flowrate Sensor. This type of failure has occurred eight previous times in ground testing. The sensor had performed acceptably on three previous flights of the engine and SSME flight history shows 684 combined fuel flow rate sensor channel flights without failure. The disqualification of an Engine 2 (SSME No. 2033) Fuel Flowrate sensor channel was a result of an instrumentation failure and not engine performance. All other engine operations were nominal. This disqualification resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

STS-55 pad abort: Engine 2011 oxidizer preburner augmented spark igniter check valve leak

The STS-55 initial launch attempt of Columbia (OV102) was terminated on KSC launch pad A March 22, 1993 at 9:51 AM E.S.T. due to violation of an ME-3 (Engine 2011) Launch Commit Criteria (LCC) limit exceedance. The event description and timeline are summarized. Propellant loading was initiated on 22 March, 1993 at 1:15 AM EST. All SSME chill parameters and launch commit criteria (LCC) were nominal. At engine start plus 1.44 seconds, a Failure Identification (FID) was posted against Engine 2011 for exceeding the 50 psia Oxidizer Preburner (OPB) purge pressure redline. The engine was shut down at 1.50 seconds followed by Engines 2034 and 2030. All shut down sequences were nominal and the mission was safely aborted. The OPB purge pressure redline violation and the abort profile/overlay for all three engines are depicted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 013-414, OPB purge pressure redline exceeded. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to the oxidizer preburner augmented spark igniter purge check valve not being fully closed due to contamination. The source of the contaminant was traced to a cut segment from a rubber O-ring which was used in a fine clean tool during valve production prior to 1992. The valve was apparently contaminated during its fabrication in 1985. The valve had performed acceptably on four previous flights of the engine, and SSME flight history shows 780 combined check valve flights without failure. The failure of an Engine 3 (SSME No. 2011) check valve to close was sensed by onboard engine instruments even though all other engine operations were normal. This resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

NPP Simulators for Coupled Thermal and Electric Power Dispatch

The Light Water Reactor Sustainability (LWRS) program within the United States Department of Energy supports extending the operation of the U.S. commercial nuclear power plant (NPP) fleet. Within the LWRS program, the Flexible Plant Operation and Generation (FPOG) Pathway works to diversify the revenue streams of light water reactors (LWRs) by opening opportunities for the co-generation of non-electric products in addition to supplying electrical power to the grid. Recent events have added greater motivation to these efforts. For example, the recent Inflation Reduction Act (IRA) passed by the U.S. federal government offers substantial tax incentives for producing clean hydrogen, the technology readiness level of dispatchable and high-efficiency hydrogen production has dramatically increased in a short time, and societal response to world climate change is driving a transition away from fossil fuels. Producing hydrogen with maximum efficiency using nuclear power requires dispatching both electrical and thermal power from the nuclear plant to the hydrogen plant, so testing concepts of operations for combined electrical and thermal power dispatch (TPD) from an NNP to a hydrogen plant is of interest. This report documents achievement of the Light Water Reactor Sustainability (LWRS) program milestone “Install and demonstrate a vendor-developed simulator on the Human Systems Simulation Laboratory (HSS) for dispatch of LWR electrical power to a close-coupled electrolysis plant” with a due date of Dec. 22, 2022. Several factors provide motivation for this effort. Coupling the power generation deck of a nuclear power plant to a hydrogen production facility introduces new possibilities for operational transients that must be addressed. In particular, the performance of the integrated system during startup and shutdown of the hydrogen production facility, as well as offnormal conditions, need to be evaluated to ensure there are no adverse effects on the operation of the existing NPP. The concept of operations involving the NPP, the hydrogen plant, and the electric power grid must be tested using NPP simulators and operating procedures that have been modified for TPD operations. These tests must also include dynamic simulations of the coupled tertiary thermal and electric loads as well as coordinated activities with NPP operators, tertiary load operators and grid power coordinators. The report summarizes progress in developing and testing full-scope NPP simulators at the HSSL, including a generic BWR simulator from GSE Systems, Inc. and generic PWR simulator from Westinghouse. In the case of the TPD-GBWR Simulator from GSE Systems, Inc., a BWR is thermally coupled to a high temperature electrolysis (HTE) plant that produces hydrogen and oxygen from de-ionized water. The hydrogen plant is not explicitly simulated but only included as a transient heat sink. A thermal power dispatch (TPD) system transfers heat between the steam systems at the BWR and the hydrogen plant. Operational results from two versions of the modified simulator are presented. The first version uses synthetic oil as a heat transfer fluid in a closed delivery heat loop (DHL) that generates steam at the hydrogen plant. The second version uses steam as the heat transfer fluid in a delivery steam line (DSL) to provide steam to the hydrogen plant. For both versions, the estimated thermal power delivery distance is approximately one kilometer. The amount of thermal power dispatched in the simulators is 15% of the total reactor thermal power such that the simulators provide a tool to study the feasibility of coupling a BWR to industrial processes that benefit from a combination electrical and thermal power dispatch. Ongoing work within a CRADA is also developing a full-scope PWR simulator provided by Westinghouse for both thermal and electric power coupling. This simulator is based on a PWR plant with two three-loop Westinghouse reactors. Westinghouse PWRs are sufficiently similar that a simulator of a three-loop reactor is an appropriate representation for two-loop and four-loop PWR reactors. The three-loop simulator will initially be modified for close-coupling to a 100 MW HTE hydrogen production plant that will require approximately 25 MW of thermal power while operating at its maximum rated capacity. The simulator testing will include full coupling to dynamic simulations of a hydrogen production plant and a representative bulk electric grid. The simulator provided by Westinghouse is similar to the GPWR simulator that INL has already obtained from GSE Systems but has a few important added benefits. First, the Westinghouse simulator is based on digital controls and has additional screens that can be called up to show parameter trends to assist operators in decision-making. The Westinghouse simulator also has upgrades to the controls and hardware representations, such as valve actuators, that make it more realistic and flexible in terms of accurately sim

99 GENERAL AND MISCELLANEOUS↗