Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Service Quality”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Quality of service for input/output memory management unit

A data processing system includes a memory, a group of input/output (I/O) devices, an input/output memory management unit (IOMMU). The IOMMU is connected to the memory and adapted to allocate a hardware resource from among a group of hardware resources to receive an address translation request for a memory access from an I/O device. The IOMMU detects address translation requests from the plurality of I/O devices. The IOMMU reorders the address translation requests such that an order of dispatching an address translation request is based on a policy associated with the I/O device that is requesting the memory access. The IOMMU selectively allocates a hardware resource to the input/output device, based on the policy that is associated with the I/O device in response to the reordering.

Basu, Arkaprava↗

Systems and methods for quality of service (QoS) based management of bottlenecks and flows in networks

Techniques based on the Theory of Bottleneck Ordering can reveal the bottleneck structure of a network, and the Theory of Flow ordering can take advantage of the revealed bottleneck structure to manage and configure network flows so as to improve the overall network performance. These two techniques provide insights into the inherent topological properties of a network at least in three areas: (1) identification of the regions of influence of each bottleneck; (2) the order in which bottlenecks (and flows traversing them) may converge to their steady state transmission rates in distributed congestion control algorithms; and (3) the design of optimized traffic engineering policies.

97 MATHEMATICS AND COMPUTING↗

The ABCs of On-Demand Transit (ODT)

On-demand mobility - also referred to as on-demand transit (ODT) - is a form of public mobility that is flexible with respect to where and when service is provided, and ODT deployments have increased significantly in recent years. Transit agencies are becoming increasingly interested in ODT, and due to differing definitions and various service design and business model options, it can be difficult to learn about the emerging industry. This work provides an overview of the definitions of ODT, recent trends internationally and in the U.S., ODT's benefits and challenges (particularly compared to fixed-route transit), three primary service design options, system costs and funding considerations, and a metrics framework for evaluating ODT systems to ensure continued successful performance. Identified benefits include increased service areas, short ride and wait times, increased user flexibility, potential to reduce energy consumption and emissions through shared trips and smaller, right-sized vehicles, increased safety and comfort through door-to-door service, and rich data streams including granular spatio-temporal data that can be analyzed to continuously improve the service. Challenges include scaling ODT service up as small increases in ridership require additional supply to keep service quality high, serving peak times including keeping low wait times, the lack of fixed schedule being challenging for commuters, integrating ODT services with nearby transit systems, and equity for riders without smartphones who cannot track the vehicle in a mobile app. Finally, an overview of seven ODT case studies (in Texas, Missouri, New York, and Ontario, Canada) performed by NREL and related analysis of travel time, energy and emissions, costs, and equity are presented. Initial key findings include: ODT can be cost- and energy-effective compared to fixed-route transit, ODT serves more people than other transit options, and ODT system deployments can be followed by rapid growth.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Factors and Technologies Design to Improve User Acceptance of Pooled Rideshare for Increasing Transportation System Energy Efficiency

This multi-year project delivered a comprehensive, human-factors-driven framework to understand, model, and improve pooled rideshare (PR) adoption in the United States. Through three large-scale national survey studies involving more than 16,000 participants across multiple cities and demographic groups, the research established one of the most extensive datasets to date on user perceptions, behavioral barriers, and service expectations related to pooled rideshare. These data revealed key human factors barriers of user acceptance of PR and suggested potential actionable experience optimizations that could lead to increased PR usage. This foundational knowledge guided the development of novel human-factors models and behavioral choice models that quantify how psychological, demographic, and trip-level factors influence willingness to pool. Building on these empirical insights, the project developed advanced behavioral modeling tools, including mixed logit and integrated choice and latent variable models, to capture both observable and latent influences on PR adoption. These models significantly improved the ability to predict riders’ acceptance of pooled trips, explaining choice heterogeneity through latent constructs such as safety, service experience, privacy concerns, time sensitivity, and environmental attitudes. Together, these models provide a robust analytical foundation for designing PR systems that more effectively meet user needs. The project translated human-factors insights and behavioral models into actionable technology innovations by extending POLARIS—an agent-based, activity-based travel simulation platform—into a fully functional pooled rideshare simulation environment. New PR modules, acceptance models, and regional scenarios were implemented for Greenville, SC and Austin, TX, enabling high-fidelity validation of algorithmic strategies under realistic demand and traffic conditions. The simulation platform supported the development and evaluation of adaptive discount-based assignment algorithms, enhanced willingness-to-pay formulations, demographic-aware incentive mechanisms, and a proactive joint assignment and repositioning strategy. Simulation results demonstrated substantial gains in pooling uptake, average vehicle occupancy, energy efficiency, and fleet profitability. In Greenville, pooling adoption more than doubled, while reductions in vehicle-miles traveled and energy consumption were significant. In Austin, pooling improvements were achieved with minimal service-quality trade-offs, and profitability increased across all fleet sizes. Through this research, we developed a comprehensive understanding of the human factors barriers that limit user acceptance of pooled rideshare services. These insights enabled the design of human-factors-aware pooled rideshare technologies that more effectively address user concerns and improve adoption rates. By integrating these models into an advanced agent-based simulation framework, we demonstrated that higher adoption of pooled rideshare can lead to measurable improvements in energy efficiency and system performance. Together, these contributions establish a validated pathway from human-centered analysis to technology development and energy-saving outcomes, supporting national goals for more sustainable and efficient mobility systems.

Jia, Yunyi↗

Physical Property Analysis and Report for Sediments at 100-BC-5 Operable Unit, Boreholes C7505, C7506, C7507, and C7665

Between October 14, 2009 and February 22, 2010 sediment samples were received from 100-BC Decision Unit for geochemical studies. This is an analytical data report for sediments received from CHPRC at the 100 BC 5 OU. The analyses for this project were performed at the 325 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

100 BC 5, Analytical data, Characterization↗

100-BC-5 Operable Unit, Batch Leach Analyses and Report for Sediments at RI/FS Wells C7508, C7783, C7784, C7785, and C7787

This is an analytical data report for sediment samples from the 100 BC Operable unit. This report contains the updated dates for samples associated with Hexavalent Chromium/Soil analysis. Between August 24, 2010 and March 3, 2011 sediment samples were received from 100-BC Decision Unit Soil for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

100 BC, Kd, sediment charaterization↗

Data Package of Samples Collected for Hydrogeologic and Geochemical Characterization: 300 Area RI/FS Sediment Cores

This is a data package for sediment samples received from the 300 FF 5 OU. This report was prepared for CHPRC. Between August 16, 2010 and April 25, 2011 sediment samples were received from 300-FF-5 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

300 Area, Charaterization, Sediment↗

Report for Batch Leach Analyses on Sediments at 100-FR-3 Operable Unit, Boreholes C7790, C7791, and C7792

This is a data report for CHPRC for the 100-FR-3 operable unit. Between August 15, 2010 and December 2, 2010 sediment samples were received from the 100-FR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 325 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

100-FR-3, Chemical caracterization, KD↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866.

This is a data report for sediment samples analyzed for CHPRC. Between November 4, 2010 and April 25, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

58 GEOSCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-KR-4 Operable Unit, Boreholes C7684, C7688, and C7695

This is a data report for sediment samples received by CHPRC from the 100-KR-4 OU. Between December 17, 2010 and February 17, 2011 sediment samples were received from 100-KR-4 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

58 GEOSCIENCES↗

200-DV-1OU Sediment and Pore Water Analysis and Report for Samples at Borehole C8096

This is an analytical data report for sediment samples received at 200-DV-1 OU. On August 30, 2011 sediment samples were received from 200-DV-1 OU Borehole C8096 for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

54 ENVIRONMENTAL SCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866

This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.

54 ENVIRONMENTAL SCIENCES↗

An Autonomic Middleware Solution for Coordinating Multiple QoS Controls

Adaptive self-managing applications can adapt their behavior through components that monitor the application behavior and provide feedback controls. This paper outlines an autonomic approach to coordinate multiple controls for managing service quality using executable control models. In this approach, controls are modeled as process models. Moreover, controls with cross-cutting concerns are provisioned by a dedicated process model. The flexibility of this approach allows composing new controls from existing control components. The coordination of their dependencies is performed within a unified architecture framework for modeling, deploying and executing these models. We integrate the process modeling and execution techniques into a middleware architecture to deliver such features. To demonstrate the practical utilization of this approach, we employ it to manage fail-over and over-loading controls for a service oriented loan brokering application. The empirical results further validate that this solution is not only sensitive to resolving cross-cutting interests of multiple controls, but also lightweight as it incurs low computational overhead.

99 GENERAL AND MISCELLANEOUS↗