Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SWPF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Investigation of Undissolved Solids from Salt Waste Processing Facility (SWPF) Salt Batches Collected via Filtration

SRNL researchers performed six experiments wherein 0.1 μm-grade stainless steel filters were used to filter samples pulled from salt batches 6, 9B, and 11B, without the addition of monosodium titanate. Three of these experiments were performed to collect filterable solids from each salt batch and characterize trapped solids via scanning electron microscopy. The remaining three experiments were performed to collect and then dissolve the same solids using 3.5 M nitric acid (similar to that employed in the Salt Waste Processing Facility) for characterization via Inductively-coupled plasma atomic emission spectroscopy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sharing Lessons Learned 'Across the Pond' on Two Major Construction Projects: Evaporator D and SWPF - 16050

This paper compares and contrasts two projects, the Salt Waste Processing Facility at Savannah River in the US and Evaporator D at Sellafield in the UK, to highlight the similar challenges that each project has experienced since contract award and how these challenges have been addressed. The paper compares the life-cycles of the projects, project strategy, design, construction, and regulatory issues, along with cost and schedule performance. There is also some discussion about the anticipated challenges in the future as the projects move into the startup and commissioning phase. Overall, the paper identifies some of the common areas that have affected these projects and how these similarities have been the subject of sharing and collaborating lessons learned on a broader scale, even though the delivery organizations operate in different countries under different regulatory and Government frameworks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Caustic-Side Solvent Extraction Full-Scale Test

A Full-Scale Test (FST) program was performed by Parsons and its team members General Atomics and Energy Solutions to assess the performance of full-scale centrifugal contactors specified for the Department of Energy Salt Waste Processing Facility (SWPF). The SWPF, to be located at the Savannah River Site (SRS) in Aiken, South Carolina, will remove highly radioactive waste constituents, principally actinides, strontium (Sr), and cesium (Cs) radionuclides, from salt waste solutions currently stored in SRS high-level waste tanks. Caustic-side Solvent Extraction (CSSX) removes Cs from waste feed that has been treated upstream to remove actinides and Sr. CSSX uses a custom solvent to extract Cs from the salt solution in a series of single stage centrifugal contactors. The test system comprised (a) eleven 25.4 cm (10'') full-scale contactors (versus 36 in SWPF) for the extraction, scrub, strip, and wash stages; (b) two solvent recovery coalescers; and (c) the associated hardware and control system, packaged in four skid mounted modules. This paper describes the results of tests performed to define both hydraulic performance parameters (maximum hydraulic capacity and phase carryover) and solvent extraction performance parameters (Cs mass transfer efficiencies) using simulated SWPF waste and actual CSSX solvent. The test results confirmed key design features of the CSSX process and, as a consequence, the use of CSSX in the SWPF. In conclusion: Total throughput was initially limited to 85% of maximum flow during FST. Minor system modifications performed prior to mass transfer testing series resulted in the realization of 100% throughput. The 100% flow equates to slightly more than 35.6 x 10{sup 6} L/yr (9.4 Mgal/yr) of waste processed in SWPF which is anticipated to be the peak plant throughput. To achieve the best hydraulic performance in extraction, it is recommended that the extraction contactors be operated at the highest reasonable speed possible (>2100 rpm). Vibration, hardware limitations, bearing life, and other factors should be considered prior to final selection of extraction contactor speeds in SWPF. In strip (also scrub and wash) aqueous carryover decreased and organic carryover increased as the rotor speeds increased. It is recommended that the strip, scrub, and wash contactors be operated at intermediate speeds (between 1500 and 2100 rpm) to achieve a performance compromise between aqueous and organic carryover. Curved-vane bottom plates showed a significant hydraulic performance (aqueous and organic carryover) advantage over straight-vane bottom plates in extraction. There was no significant mass transfer performance advantage for either plate type in extraction. Thus, curved-vane bottom plates in extraction may be the better option for use in SWPF. There was no significant hydraulic performance difference between the plate types in strip. Straight-vanes provided significantly better mass transfer performance in strip compared to curved-vanes. Based solely on mass transfer performance, straight-vane bottom plates in the strip, scrub, and wash contactors are recommended for use in SWPF. Utilizing straight-vanes in the stripping section, the overall SWPF CSSX performance is expected to meet or exceed the target DF of 40,000 with minimum extraction D{sub Cs} of 10. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2024 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2024 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained.1 The April 2024 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2024 (1QFY2024) and the Second Quarter Fiscal Year 2024 (2QFY2024). The following facts pertaining to the WAC are drawn from the analytical results provided in this report. WAC TARGETS and LIMITS were met for all analyzed chemical and radioactive contaminants for which the detection limits are below the WAC TARGETS and LIMITS. Nitrosamines were not detected in the SWPF DSS salt solution sample above the instrument detection limits of <1 mg/L. The minimum detection limit (<3.33E-01 pCi/mL) is reported for 94 Nb as determined from the minimum detectable activity associated with the radiochemical method used for this radionuclide. The reported detection limit is above the requested SRMC target minimum detection limit concentration. However, the minimum detection limit reported for the April 2024 semiannual SWPF DSS sample for 94 Nb is lower than the estimated detection limit of 4.38E-01 pCi/mL initially established by SRNL in 2009. Thus, per guidance from SRMC, 2 SRNL continues to achieve as low as practical detection limits for this radionuclide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of glasses in support of the Sludge Batch 9 variability study for coupled operation with the Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support the qualification of SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO 2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank as well as Cs-containing strip effluent. The incorporation of these SWPF streams is expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST addition of 0.4 g MST/L of salt solution. If double strike operation is required, then the MST addition is increased to 0.8 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO 2 , but less than 6 wt.%. To support the implementation of the revised PCCS for SB9 – Frit 803 processing at DWPF prior to SWPF startup, the applicability of the new durability models for the SB9 variability study glasses was verified. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. To identify a frit optimized for SB9 coupled operation with SWPF, the Savannah River National Laboratory (SRNL) performed a paper-study by utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. Based on these MAR assessment results, Frit 625 was recommended for processing both single and double MST strike scenarios. Savannah River Remediation (SRR) requested that SRNL perform a variability study with both Frit 803 and Frit 625 for SB9 coupled operation with SWPF. The objective of the variability study is to demonstrate that the Product Consistency Test (PCT) responses of the glasses are acceptable relative to the chemical durability of the Environmental Assessment (EA) reference glass and predictable by the current DWPF PCCS models for durability. This report documents the development of a test matrix that will support the variability study. To provide operational flexibility prior to SWPF startup, the predictability of glasses within the glass region for Frit 625-SB9 coupled operation with ARP-MCU was also confirmed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Increased Salt and Decreased Sludge Volumes in the Defense Waste Processing Facility - 19597

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). The disposition of high-level waste (HLW) into a glass waste form poured into canisters at the DWPF began in 1996. DWPF processed a sludge only flowsheet until 2008 when the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began treating the salt waste from the underground liquid storage tanks by striking with monosodium titanate (MST) to remove actinides, when necessary to meet downstream acceptance criteria, and removing the MST and entrained sludge solids (SS) by filtration before using an organic solvent to strip the cesium from the salt, creating two new concentrated HLW streams. This change caused the DWPF to begin processing under both a sludge-only and a coupled operations flowsheet where salt streams would only be added when available. This strategy allows for continuous glass canister production at DWPF. Recently, DWPF completed a 10-month melter replacement in December 2017 and the Concentrate, Storage, and Transfer Facility (CSTF) has completed repairs to the 3H Evaporator system. These facility outages have caused delays in preparing the next batch of sludge feed for DWPF. Concurrent with these facility outages, the Salt Waste Processing Facility (SWPF) has been undergoing system testing and commissioning, working toward startup. SWPF is designed to process salt waste in the same manner as ARP/MCU, but with much higher throughput volumes produced per unit time. In order to process the SWPF salt streams efficiently, DWPF will implement a coupled operation only flowsheet. Based on the facility outages mentioned above, efforts have been made to identify strategies to minimize sludge volumes and maximize salt volumes in the DWPF until the next sludge batch is ready for processing in DWPF. Savannah River Remediation (SRR) recently performed an evaluation that examines the effects of reducing the volume of sludge and maximizing the addition of the cesium-rich concentrated salt solution in each Sludge Receipt and Adjustment Tank (SRAT) batch in order to extend the existing sludge batch as long as possible until the next sludge batch is ready. These effects include a reduction of weight percent solids in the DWPF processing vessels, an increase in cycle time, a new canister heat generation value that remains within regulatory limits, and higher gamma source that remains within bulk facility gamma shielding. Balancing the above parameters resulted in a small reduction of sludge volume per SRAT batch under SWPF operation and maximizing the salt volumes for both ARP/MCU and SWPF operation. This slight reduction in sludge volume and increase in salt volumes allows SRR to mitigate some of the schedule impact incurred by the facility outages. This strategy was evaluated for both ARP/MCU and SWPF operation. This strategy has been successfully implemented under ARP/MCU operation using small step changes in the current process. This paper provides an overview of the evaluation performed for DWPF with ARP/MCU and DWPF with SWPF operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF SMALL COLUMN ION EXCHANGE STREAMS ON DWPF GLASS FORMULATION MELT RATE STUDIES

This study was undertaken to evaluate the potential impacts of the Small Column Ion Exchange (SCIX) streams - particularly the addition of Monosodium Titanate (MST) and Crystalline Silicotitanate (CST) - on the melt rate of simulated feed for the Defense Waste Processing Facility (DWPF). Additional MST was added to account for contributions from the Salt Waste Processing Facility (SWPF). The Savannah River National Laboratory (SRNL) Melt Rate Furnace (MRF) was used to evaluate four melter feed compositions: two with simulated SCIX and SWPF material and two without. The Slurry-fed Melt Rate Furnace (SMRF) was then used to compare two different feeds: one with and one without bounding concentrations of simulated SCIX and SWPF material. Analyses of the melter feed materials confirmed that they met their targeted compositions. Four feeds were tested in triplicate in the MRF. The linear melt rates were determined by using X-ray computed tomography to measure the height of the glass formed along the bottom of the beakers. The addition of the SCIX and SWPF material reduced the average measured melt rate by about 10% in MRF testing, although there was significant scatter in the data. Two feeds were tested in the SMRF. It was noted that the ground CST alone (ground CST with liquid in a bucket) was extremely difficult to resuspend during preparation of the feed with material from SCIX and SWPF. This feed was also more difficult to pump than the material without MST and CST due to settling occurring in the melter feed line, although the yield stress of both feeds was high relative to the DWPF design basis. Steady state feeding conditions were maintained for about five hours for each feed. There was a reduction in the feed and pour rates of approximately 15% when CST and MST were added to the feed, although there was significant scatter in the data. Analysis of samples collected from the SMRF pour stream showed that the composition of the glass changed as expected when MST and CST were added to the feed. These reductions in melt rate are consistent with previous studies that showed a negative impact of increased TiO{sub 2} concentrations on the rate of melting. The impact of agitating the melt pool via bubbling was not studied as part of this work, but may be of interest for further testing. It is recommended that additional melt rate testing be performed should a potential reduction in melt rate of 10-15% be considered an issue of concern, or should the anticipated composition of the glass with the addition of material from salt waste processing be modified significantly from the current projections, either due to changes in sludge batch preparation or changes in the composition or volume of SCIX and SWPF material.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2023 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2023 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The October 2023 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the Third Quarter Fiscal Year 2023 (3QFY2023) and the Fourth Quarter Fiscal Year 2023 (4QFY2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Frit Recommendation For Sludge Batch 9 Coupled Operation With The Salt Waste Processing Facility

Prior to the processing of Sludge Batch 9 (SB9) with Frit 803 at the Defense Waste Processing Facility (DWPF), assessments and experimental glass work were completed to support SB9 coupled processing with streams from the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU). This previous work did not address coupled processing with streams from the Salt Waste Processing Facility (SWPF) because the Product Composition Control System (PCCS) models limited the TiO2 concentration in glass to 2 weight percent (wt.%). These high activity streams from SWPF include monosodium titanate (MST) and sludge solids from the Sludge Solids Receipt Tank (SSRT) as well as Cscontaining strip effluent (SE). The SWPF streams are expected to reach TiO2 concentrations in glass greater than 2 wt.% based on an MST strike of 0.4 g MST/L of salt solution. Therefore, revisions to the models contained in PCCS were completed to allow the evaluation of glasses containing greater than 2 wt.% TiO2, but less than 6 wt.%. Since the initial SB9 qualification for ARP-MCU coupled operation, additional Tank 40 analyses have been completed, which served as the basis for an updated projection of the SB9 blend composition in Tank 40. This projection will be used to support SB9 coupled operation with SWPF in 2019. Savannah River Remediation (SRR) has requested that the Savannah River National Laboratory (SRNL) select a second frit to optimize SB9 coupled operation with SWPF. The selected frit would provide operational flexibility by allowing an acceptable waste loading (WL) to be targeted while maintaining an operating window of at least ± 4 percentage points around this target. The objective of this study was to select a second frit based on a paper-study utilizing Measurement Acceptance Region (MAR) assessments with DWPF PCCS. To support these assessments, SRNL developed a new method for rigorous and directed optimization of frit compositions, which allowed for rapid screening and an assessment of a large array of candidate frits, and the ability to simultaneously satisfy the following single and double MST strike operating scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Solids Obtained from 201O, 201P, 202A, and 202B Contactors in the Salt Waste Processing Facility

In December 2022, Savannah River Mission Completion personnel recovered solids samples from four contractors (EXT-001, EXT-007, EXT-031, and EXT-040) employed at the Salt Waste Processing Facility (SWPF). These solids were submitted to Savannah River National Laboratory for analysis and characterization. This Technical Report outlines the analytical findings and observations associated with these samples and explores the potential source of solid generation within the SWPF. The following conclusions are offered as a result of this work: the light color solids recovered from EXT-007 are consistent with crystallized, soluble salt components (such as sodium nitrate, sodium hydroxide, and sodium carbonate), all of which can be easily re-dissolved in process water and do not represent a threat to SWPF CSSX processing. While the light solids from the top of EXT-040 were not analyzed, it is believed that they share similar characteristics to those recovered from EXT-007; The dark color solids recovered from EXT-001, EXT-031, and the inside of EXT-040 appear to be complex, consisting of several different types of solids: High concentrations of mercury (Hg, 40-75% by mass) partially present as elemental Hg are consistent with the precipitation of Hg 0 /Hg 2+ from disproportionation of Hg + species in pH swing conditions; Moderate concentrations of titanium (Ti) (2-7%, by mass) are also present, often co-located with Hg. This is consistent with co-precipitation, entrainment, and/or amalgamation of Ti and Hg; Moderate concentrations of iron (Fe) (1-3%, by mass) are observed in SWPF solids and are likely attributable to erosion of stainless-steel components within the CSSX process; Small concentrations of tungsten (W) and cobalt (Co) (<1%, by mass) are observed in SWPF solids. The presence of these solids is consistent with the erosion of components coated with W and Co (e.g., Stellite); Small concentrations of aluminum (Al) (<1%, by mass) are observed in the form of gibbsite and potentially sodium aluminosilicate. The presence of these compounds is likely attributable to the pH swing observed between the scrub and extraction cycles within the CSSX process. The following recommendations are made as a result of this work: Testing should be performed to determine the chemical drivers, process, and mechanism of Hg precipitation in CSSX processing. Special care should be taken to include titanium in tests to evaluate the potential for co-precipitation, entrainment, and amalgamation; Hg-mitigation options that would minimize or eliminate risks of Hg precipitation and solids accumulation (e.g., Hg-absorption techniques, ion exchange/adsorbents, flowsheet changes, etc.) should be assessed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PAPER STUDY EVALUATIONS OF THE INTRODUCTION OF SMALL COLUMN ION EXCHANGE WASTE STREAMS TO THE DEFENSE WASTE PROCESSING FACILITY

The objective of this paper study is to provide guidance on the impact of Monosodium Titanate (MST) and Crystalline Silicotitanate (CST) streams from the Small Column Ion Exchange (SCIX) process on the Defense Waste Processing Facility (DWPF) flowsheet and glass waste form. A series of waste processing scenarios was evaluated, including projected compositions of Sludge Batches 8 through 17 (SB8 through SB17), MST additions, CST additions to Tank 40 or to a sludge batch preparation tank (Tank 42 or Tank 51, referred to generically as Tank 51 in this report), streams from the Salt Waste Processing Facility (SWPF), and two canister production rates. A wide array of potential glass frit compositions was used to support this assessment. The sludge and frit combinations were evaluated using the predictive models in the current DWPF Product Composition Control System (PCCS). The results were evaluated based on the number of frit compositions available for a particular sludge composition scenario. A large number of candidate frit compositions (e.g., several dozen to several hundred) is typically a good indicator of a sludge composition for which there is flexibility in forming an acceptable waste glass and meeting canister production rate commitments. The MST and CST streams will significantly increase the concentrations of certain components in glass, such as Nb{sub 2}O{sub 5}, TiO{sub 2}, and ZrO{sub 2}, to levels much higher than have been previously processed at DWPF. Therefore, several important assumptions, described in detail in the report, had to be made in performing the evaluations. The results of the paper studies, which must be applied carefully given the assumptions made concerning the impact of higher Ti, Zr, and Nb concentrations on model validity, provided several observations: (1) There was difficulty in identifying a reasonable number of candidate frits (and in some cases an inability to identify any candidate frits) when a waste loading of 40% is targeted for Sludge Batches 8, 16, and 17, regardless of the addition of SCIX or SWPF streams. This indicates that the blending strategy for these sludge batches should be reevaluated by Savannah River Remediation (SRR). (2) In general, candidate frits were available to accommodate CST additions to either Tank 40 or Tank 51. A larger number of candidate frits were typically available for the sludge batches when CST is added to Tank 51 rather than Tank 40, meaning that more compositional flexibility would be available for frit selection and DWPF operation. Note however that for SB8 and SB17, no candidate frits were available to accommodate CST going to Tank 40 with and without SWPF streams. The addition of SWPF streams generally improves the number of candidate frits available for processing of a given sludge batch. (3) The change in production rate from 40 Sludge Receipt and Adjustment Tank (SRAT) batches per year (i.e., the current production rate) to 75 SRAT batches per year, without SWPF streams included, had varied results in terms of the number of candidate frits available for processing of a given sludge batch. Therefore, this variable is not of much concern in terms of incorporating the SCIX streams. Note that the evaluation at 75 SRAT batches per year (approximately equivalent to 325 canisters per year) is more conservative in terms of the impact of SCIX streams as compared to a production rate of 400 canisters per year. Overall, the outcome of this paper study shows no major issues with the ability to identify an acceptable glass processing window when CST from the SCIX process is transferred to either Tank 40 or Tank 51. The assumptions used and the model limitations identified in this report must be addressed through further experimental studies, which are currently being performed. As changes occur to the planned additions of MST and CST, or to the sludge batch preparation strategy, additional evaluations will be performed to determine the potential impacts. As stated above, the issues with Sludge Batches 8, 16, and 17 should be further evaluated by SRR. A review of Chemical Process Cell (CPC) processing identified no changes to the recommendations from the previous review of the SCIX process impacts. Recommendations for testing were made during the previous review to evaluate the impact of CST on the rheological properties of DWPF process streams and evaluate the impact of CST on catalytic hydrogen generation during CPC processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 49H Solids Disturbance Analysis

Tank 49H will serve as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1200 mg/L from the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls from the Tank 49H B4 downcomer and passes through the supernate could potentially disturb the solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. The scope of this task is to perform fluid flow analysis to determine the impact of a “plunging jet” through the B4 downcomer on solids in Tank 49H and to determine a minimum liquid level to be maintained in Tank 49H prior to transfers that will minimize disturbing the solids and exceeding the SWPF WAC limits for insoluble solids carryover to SWPF.

54 ENVIRONMENTAL SCIENCES↗

Tank 21 and tank 24 blend and feed study: blending times, settling times, and transfers

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks were evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest the solid particles have higher density and/or larger size than indicated by previous analysis of SRS sludge and sludge simulants. (5) Tank 21 waste characterization, laboratory settling tests, and additional field turbidity measurements during mixing evolutions are recommended to better understand potential risk for extended (> 60 days) settling times in Tank 21.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗