Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Verification and Validation of the Stakeholder Tool for Assessing Radioactive Transportation (START) – 22323

The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.

START, DOE, Transporation, dose, GIS↗

Characterization of GDI PM during Vehicle Start-Stop Operation

As the fuel economy regulations increase in stringency, many manufacturers are implementing start-stop operation to enhance vehicle fuel economy. During start-stop operation, the engine shuts off when the vehicle is stationary for more than a few seconds. When the brake is released by the driver, the engine restarts. Depending on traffic conditions, start-stop operation can result in fuel savings from a few percent to close to 10%. Gasoline direct injection (GDI) engines are also increasingly available on light-duty vehicles. While GDI engines offer fuel economy advantages over port fuel injected (PFI) engines, they also tend to have higher PM emissions, particularly during start-up transients. Thus, there is interest in evaluating the effect of start-stop operation on PM emissions. In this study, a 2.5L GDI vehicle was operated over the FTP75 drive cycle. Runs containing cold starts (FTP-75 cycle Phases 1 & 2) and multiple runs containing hot starts (FTP-75 cycle Phases 3 & 4) were performed each day. Note that the FTP-75 Phases 3 & 4 are identical to Phases 1 & 2 except that the engine is warmed up. Three fuels were evaluated: an 87 AKI gasoline (E0), a 21% splash blend of ethanol and the 87 AKI gasoline (E21), and a 12% splash blend of iso-butanol and the 87 AKI gasoline (iBu12). PM mass, transient particle number concentration and size distribution, and soot mass concentration were evaluated for both start-stop operation and no start-stop operation on each fuel. Three Phase 1 & 2 cycles and as many as 27 Phase 3 & 4 cycles were performed for each fuel-mode combination. Composite FTP mass emissions for E0 and iBu12 showed increased total PM emissions with start-stop operation, but E21 showed no difference. Statistical analysis of the effects of start-stop on PM number and soot emissions showed different trends for different fuels. For example, when E0 is used with start-stop operation, the particle number decreased but the soot mass tended to increase. The results of this study have implications for hybrid vehicle operation as well because the internal combustion engine in hybrid vehicles must stop and re-start during normal operation.

Storey, John↗

Water Start Up Time Model Validation Test

This report is an Oregon Institute of Technology thesis project completed in partial fulfillment for the Masters of Science in Renewable Energy Engineering degree. The testing and research done for this report, investigate the phenomena of water start up time in the spiral case of hydro units. Water start up time is defined as the time it takes for water to accelerate from zero to rated velocity. From analysis of the literature there shows no published article of water start up time being measured and compared to theoretically calculated values. However a multiplier is used to create a buffer in the estimations of water start up time to use in the engineering and selection of governors for hydro units. The multiplier has also been widely used in computer model simulations which causes a dependence of this multiplier. In 2013 an article was published which challenges the hypothesis that water start up time has been over hypothesized and that the multiplier would be of a smaller value than what was hypothesized which would mean that the governing ability is more than what was expected. This proposal of a higher governing ability would mean that the hydro facilities that are currently standing has a higher stability rating than what was initially thought. The higher stability would allow for increased penetration of renewables onto the electrical grid. The lack of actual water start up time measurements as well as the infeasibility of testing on an actual hydro unit meant that a model would need to be designed, built, and tested. The model had two testing parameters that were examined. One of the parameters was flow rate that was controlled by the number of wicket gates that was installed into the system and the other was the reference height from the forebay to tail water. There were one hundred results from the test trials. The data from the trials showed a trend for the multiplier which was not constant as previously hypothesized and instead illustrated a parabolic trend that tapers into a linear digression. This result means that the range of testing was insufficient and the height range in which the trials were taking placed was subjected to higher variability. The results showed that the multiplier used in water start up time is not a constant and is variable based on the water level. The previous hypothesis stating that the water start up time is faster is false. In accordance with the results the trend showed that the actual water start up time is slower than what is hypothesized. This means at lower water levels the hypothesized governing ability is actually less than what is calculated to be using the current method of water start up time calculation for spiral cases. The theoretical analysis showed that with increased water level and flow rate showed that the multiplier has less effect on water start up time. The value of the water start up time tapering off from the experimental data shows that the trend for water start up time for both theoretical and experimental share similarities. An increased testing range of the water level in the trials will hypothetically lower the variability of the multiplier and in turn conform to a linear equation. The linear equation is shown to approach zero with increased head in which a static value can be achieved for a specified range.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

The Effect of Size on Postrelease Survival of Head-Started Mojave Desert Tortoises

Abstract Captive-rearing conservation programs focus primarily on maximizing postrelease survival. Survival increases with size in a variety of taxa, often leading to the use of enhanced size as a means to minimize postrelease losses. Head-starting is a specific captive-rearing approach used to accelerate growth in captivity prior to release in the wild. We explored the effect of size at release, among other potential factors, on postrelease survival in head-started Mojave desert tortoises Gopherus agassizii. Juvenile tortoises were reared for different durations of captivity (2–7 y) and under varying husbandry protocols, resulting in a wide range of juvenile sizes (68–145 mm midline carapace length) at release. We released all animals (n = 78) in the Mojave National Preserve, California, United States, on 25 September 2018. Release size and surface activity were the only significant predictors of fate during the first year postrelease. Larger sized head-starts had higher predicted survival rates when compared with smaller individuals. This trend was also observed in animals of the same age but reared under different protocols, suggesting that accelerating the growth of head-started tortoises may increase efficiency of head-starting programs without decreasing postrelease success. Excluding five missing animals, released head-starts had 82.2% survival in their first year postrelease (September 2018–September 2019), with all mortalities resulting from predation. No animals with >90-mm midline carapace length were predated by ravens. Our findings suggest the utility of head-starting may be substantially improved by incorporating indoor rearing to accelerate growth. Target release size for head-started chelonians will vary among head-start programs based on release site conditions and project-specific constraints.

Biodiversity & Conservation↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗

The Challenge for Arms Control Verification in the Post-New START World

Nuclear weapon arms control treaty verification is a key aspect of any agreement between signatories to establish that the terms and conditions spelled out in the treaty are being met. Historically, arms control negotiations have focused more on the rules and protocols for reducing the numbers of warheads and delivery systems - sometimes resorting to complex and arcane procedures for counting forces - in an attempt to address perceived or real imbalances in a nation's strategic posture that could lead to instability. Verification procedures are generally defined in arms control treaties and supporting documents and tend to focus on technical means and measures designed to ensure that a country is following the terms of the treaty and that it is not liable to engage in deception or outright cheating in an attempt to circumvent the spirit and the letter of the agreement. As the Obama Administration implements the articles, terms, and conditions of the recently ratified and entered-into-force New START treaty, there are already efforts within and outside of government to move well below the specified New START levels of 1550 warheads, 700 deployed strategic delivery vehicles, and 800 deployed and nondeployed strategic launchers (Inter-Continental Ballistic Missile (ICBM) silos, Submarine-Launched Ballistic Missile (SLBM) tubes on submarines, and bombers). A number of articles and opinion pieces have appeared that advocate for significantly deeper cuts in the U.S. nuclear stockpile, with some suggesting that unilateral reductions on the part of the U.S. would help coax Russia and others to follow our lead. Papers and studies prepared for the U.S. Department of Defense and at the U.S. Air War College have also been published, suggesting that nuclear forces totaling no more than about 300 warheads would be sufficient to meet U.S. national security and deterrence needs. (Davis 2011, Schaub and Forsyth 2010) Recent articles by James M. Acton and others suggest that the prospects for maintaining U.S. security and minimizing the chances of nuclear war, while deliberately reducing stockpiles to a few hundred weapons, is possible but not without risk. While the question of the appropriate level of cuts to U.S. nuclear forces is being actively debated, a key issue continues to be whether verification procedures are strong enough to ensure that both the U.S. and Russia are fulfilling their obligations under the current New Start treaty and any future arms reduction treaties. A recent opinion piece by Henry Kissinger and Brent Scowcroft (2012) raised a number of issues with respect to governing a policy to enhance strategic stability, including: in deciding on force levels and lower numbers, verification is crucial. Particularly important is a determination of what level of uncertainty threatens the calculation of stability. At present, that level is well within the capabilities of the existing verification systems. We must be certain that projected levels maintain - and when possible, reinforce - that confidence. The strengths and weaknesses of the New START verification regime should inform and give rise to stronger regimes for future arms control agreements. These future arms control agreements will likely need to include other nuclear weapons states and so any verification regime will need to be acceptable to all parties. Currently, China is considered the most challenging party to include in any future arms control agreement and China's willingness to enter into verification regimes such as those implemented in New START may only be possible when it feels it has reached nuclear parity with the U.S. and Russia. Similarly, in keeping with its goals of reaching peer status with the U.S. and Russia, Frieman (2004) suggests that China would be more willing to accept internationally accepted and applied verification regimes rather than bilateral ones. The current verification protocols specified in the New START treaty are considered as the baseline case and are contrasted with possible alternative verification protocols that could be effective in a post-New START era of significant reductions in U.S. and other countries nuclear stockpiles. Of particular concern is the possibility of deception and breakout when declared and observed numbers of weapons are below the level considered to pose an existential threat to the U.S. In a regime of very low stockpile numbers, 'traditional' verification protocols as currently embodied in the New START treaty might prove less than adequate. I introduce and discuss a number of issues that need to be considered in future verification protocols, many of which do not have immediate solutions and so require further study. I also discuss alternatives and enhancements to traditional verification protocols, for example, confidence building measures such as burden sharing against the common threat of weapon of mass destruction (WMD) terrorism, joint research and development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Effects of head-starting on multi-year space use and survival of an at-risk tortoise

A major challenge in the recovery of long-lived at-risk taxa like turtles is low juvenile recruitment. Head-starting—the raising of juveniles to larger sizes to improve survival—is one tool that can be used in circumstances where juvenile recruitment is limited. Due to declining populations and difficulty detecting juveniles, however, lack of knowledge of the ecology of juveniles can hinder efforts to develop and evaluate head-starting programs for many turtle species. We sought to inform recovery efforts of Mojave desert tortoises by quantifying multi-year space use and survival of head-started juveniles after release. We radio-tracked tortoises head-started under three different husbandry treatments that varied in rearing duration (from two to over six years) and whether head-starting included an indoor rearing component the first year. We compared postrelease space use and survival as a function of treatment, release size, and time since release. We found that space use, including home range size and site fidelity, varied by husbandry treatment, with smaller and younger tortoises having smaller home ranges and higher site fidelity. Additionally, home range size decreased and site fidelity increased with time since release across treatments. Tortoises with an indoor-rearing component experiencing increased risk of mortality as movement increased compared to tortoises reared solely outdoors. Nevertheless, survival did not differ among treatments or with tortoise age or size. Regardless of husbandry treatment, head-started tortoises exhibited similar space-use and survival overall. Our study provides insight into juvenile tortoise behavior and head-starting as a tool for tortoise conservation.

60 APPLIED LIFE SCIENCES↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation: Preprint

As the modern power systems are experiencing exceptional changes with increasing penetration of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system would obtain high system resilience, by not relying on the bulk power system restoration requiring significant human intervention and procedure to restore. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and start-up behaviors as well as network dynamics. In addition, active involvement of grid-following distributed energy resources (DER) is also studied to facilitate the black start process. It is shown that, by allowing multiple GFM inverters to collectively black start without master-slave coordination, a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Interaction between the PH and START domains of ceramide transfer protein competes with phosphatidylinositol 4-phosphate binding by the PH domain

De novo synthesis of the sphingolipid sphingomyelin requires non-vesicular transport of ceramide from the endoplasmic reticulum to the Golgi by the multidomain protein ceramide transfer protein (CERT). CERT's N-terminal pleckstrin homology (PH) domain targets it to the Golgi by binding to phosphatidylinositol 4-phosphate (PtdIns(4)P) in the Golgi membrane, whereas its C-terminal StAR-related lipid transfer domain (START) carries out ceramide transfer. Hyperphosphorylation of a serine-rich motif immediately after the PH domain decreases both PtdIns(4)P binding and ceramide transfer by CERT. This down-regulation requires both the PH and START domains, suggesting a possible inhibitory interaction between the two domains. In this study we show that isolated PH and START domains interact with each other. The crystal structure of a PH–START complex revealed that the START domain binds to the PH domain at the same site for PtdIns(4)P-binding, suggesting that the START domain competes with PtdIns(4)P for association with the PH domain. We further report that mutations disrupting the PH–START interaction increase both PtdIns(4)P-binding affinity and ceramide transfer activity of a CERT-serine–rich phosphorylation mimic. We also found that these mutations increase the Golgi localization of CERT inside the cell, consistent with enhanced PtdIns(4)P binding of the mutant. Collectively, our structural, biochemical, and cellular investigations provide important structural insight into the regulation of CERT function and localization.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Stop and Restart Effects on Modern Vehicle Starting System Components

Many drivers of personal and commercial vehicles believe that turning the vehicle off and on frequently instead of idling will cause premature wear of the starter system (starter motor and starter battery). As a result, they are concerned that the replacement cost of the starter motor and/or battery due to increased manual engine cycling would be more than the cumulative cost of the fuel saved by not idling unnecessarily. A number of variables play a role in addressing this complex concern, including the number of starting cycles per day, the time between starting cycles, the intended design life of the starting system, the amount of fuel used to restart an engine, and the cumulative cost of the saved fuel. Qualitative and quantitative information from a variety of sources was used to develop a life-cycle economic model to evaluate the cost and quantify the realistic factors that are related to the permissible frequency of starter motor cycles for the average vehicle to economically minimize engine idle time. Annual cost savings can be calculated depending on shutdown duration and the number of shutdown cycles per day. Analysis shows that cost savings are realized by eliminating idling exceeding one minute by shutting down the engine and restarting it. For a typical motorist, the damage to starting system components resulting from additional daily start cycles will be negligible. Overall, it was found that starter life is mostly dependent on the total number of start cycles, while battery life is more dependent on ensuring a full charge between start events.

42 ENGINEERING↗

Development of a Cold Start Fuel Penalty Metric for Evaluating the Impact of Fuel Composition Changes on SI Engine Emissions Control

The U.S. Department of Energy’s Co-Optimization of Fuels and Engines initiative (Co-Optima) aims to simultaneously transform both transportation fuels and engines to maximize performance and energy efficiency. Researchers from across the DOE national laboratories are working within Co-Optima to develop merit functions for evaluating the impact of fuel formulations on the performance of advanced engines. The merit functions relate overall engine efficiency to specific measurable fuel properties and will serve as key tools in the fuel/engine co-optimization process. This work focused on developing a term for the Co-Optima light-duty boosted spark ignition (SI) engine merit function that captures the effects of fuel composition on emissions control system performance. For stoichiometric light-duty SI engines, the majority of NOx, NMOG, and CO emissions occur during cold start, before the three-way catalyst (TWC) has reached its “light-off” temperature. This light-off temperature depends on the exhaust composition, which changes with fuel formulation. Thus, the time to achieve light-off, and therefore the cold start emissions, depends on fuel composition. Since the time to reach light-off must be minimized to meet emissions regulations, modern vehicles employ cold start strategies that intentionally release fuel energy into the engine exhaust to heat the TWC above the light-off temperature as quickly as possible. The fuel penalty associated with catalyst heating during cold start provides a link between fuel properties, emissions performance, and engine efficiency. This paper describes the derivation of the Co-Optima SI engine merit function term for emissions control, which is based on the cold start fuel penalty for catalyst heating and the catalytic light-off temperature for a particular fuel composition. It also discusses the process used for extracting cold start fuel penalties from chassis dynamometer data sets previously collected at ORNL. The form of the merit function term is simple, but it is only intended as a starting point for comparing the potential impacts of changes in fuel formulation on emissions control system performance.

Pihl, Josh↗

An infeasible-start framework for convex quadratic optimization, with application to constraint-reduced interior-point and other methods

A framework is proposed for solving general convex quadratic programs (CQPs) from an infeasible starting point by invoking an existing feasible-start algorithm tailored for inequality-constrained CQPs. The central tool is an exact penalty function scheme equipped with a penalty-parameter updating rule. The feasible-start algorithm merely has to satisfy certain general requirements, and so is the updating rule. Under mild assumptions, the framework is proved to converge on CQPs with both inequality and equality constraints and, at a negligible additional cost per iteration, produces an infeasibility certificate, together with a feasible point for an (approximately) ℓ 1 -least relaxed feasible problem, when the given problem does not have a feasible solution. The framework is applied to a feasible-start constraint-reduced interior-point algorithm previously proved to be highly performant on problems with many more inequality constraints than variables (“imbalanced”). Numerical comparison with popular codes (OSQP, qpOASES, MOSEK) is reported on both randomly generated problems and support-vector machine classifier training problems. The results show that the former typically outperforms the latter on imbalanced problems. Finally, application of the proposed infeasible-start framework to other feasible-start algorithms is briefly considered, and is tested on a simplex iteration.

97 MATHEMATICS AND COMPUTING↗

Comparison of plasma start-up with high Z and low Z first wall in WEST

The choice of first wall material is of paramount importance for the plasma start-up conditions in ITER and future fusion power plants. In this context, the present work focuses on the correlations between first wall impurity sources and total radiated power during plasma start-up in the tungsten (W) Environment in Steady-state Tokamak (WEST). The objective is to highlight experimental indications for a preferable combination of start-up plasma scenario and first wall materials. Until 2019, WEST featured a full high Z first wall with all limiters exposing only W surfaces to the plasma. To study the impact of a low Z first wall in WEST, boron nitride tiles were installed in the central part of the inner and outer limiters in 2020. Although visible spectroscopy and bolometry measurements show respectively a strong weakening of the WI line intensity on the limiters and a reduction of radiated power after the changeover, a degradation occurs with the accumulation of plasma exposure. In addition, the different plasma facing elements of the main chamber do not influence equally the radiated power during start-up. In both high Z and low Z environments, a clear non-linear dependence is found between the start-up radiated power and the outer limiter W impurity source. Since W seems to be the main cause for core radiation, correlation between outer limiter W sources and other impurity sources are investigated. Finally, analysis of the legacy of B powder drops on a number of start-up plasmas suggests that it is less effective at reducing radiated power when the first wall is covered with W.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Resilient Inverter-Driven Black Start with Collective Parallel Grid-Forming Operation

As modern power systems are experiencing exceptional changes with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has received attention. Using local grid-forming (GFM) assets near consumers, engineered to establish grid voltages in the absence of a stiff grid, i.e., bottom-up restoration, a distribution system could obtain high system resilience by not relying on the bulk power system restoration, which requires significant human intervention and procedure. This paper studies the technical feasibility of the novel approach with detailed electromagnetic transient (EMT) simulations. To thoroughly evaluate the potential of GFM inverters and the technical challenges in IBR-driven black start, a detailed three-phase inverter model is developed, including negative-sequence control for voltage balance and a phase-by- phase current limiter to sustain momentary overloading during the black start. To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics to emulate their inrush and startup behaviors as well as network dynamics. In addition, active involvement of grid- following distributed energy resources is also studied to facilitate the black-start process. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, we demonstrate that a system can achieve high resilience even with a fraction of assets lost. Two test cases of inverter-driven black start, using two and one GFM inverters, respectively, for a heavily unbalanced 2-MVA distribution feeder are demonstrated. Takeaways for further study and field deployment are provided.

grid-forming inverter↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters: Preprint

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

Survival and Age at Maturity in Head-Started Wood Turtles ( Glyptemys insculpta ) with Implications for Population Recovery

A small relict population of Glyptemys insculpta (Wood Turtle) was discovered on a protected area in New Jersey in 2006. Marking and radio-tracking of the old founder individuals helped to determine movement patterns and habitat use. Monitoring of nesting females revealed that nesting habitat and nest success was limited due to invasive plants, human landscape alteration, and Procyon lotor (Raccoon) depredation. We initiated habitat restoration including creation of protected nesting areas, mowing in winter, invasive plant removal, and adjacent landowner education. Here, we direct-released hatchlings from protected nests from 2006 to 2015, yet only a few were detected in subsequent years. Between 2011 and 2023, some or all of each hatchling cohort were head-started indoors at a high school for 9 months. We have continuously radio-tracked all head-starts from the 2011 cohort and portions of the 2012–2014 cohorts. Head-started turtles found their own food, established home ranges, and hibernated communally with founder adults. Subsidized Raccoons, mowers, automobiles, and flooding events—all human-instigated—were the causes of mortality. The first males and first females from the 2011 head-start cohort reached maturity in 2017 and 2019, respectively, at ages 6–8, younger than expected by 4–5 years. Successful reproduction by head-starts was confirmed by viable hatchlings produced in 2019, 2020, and 2023. Head-starting can pull a relict population out of the nose-dive to extirpation when used in conjunction with habitat-restoration practices, but it must be conducted with persistence and continuity over at least the number of years it takes for the earliest cohorts to reach maturity and begin producing offspring of their own.

59 BASIC BIOLOGICAL SCIENCES↗