Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SMUD”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Intra-Hour Dispatch and Automatic Generator Control Demonstration with Solar Forecasting - Final Report

In this project we address multiple resource integration challenges associated with increasing levels of solar penetration that arise from the variability and uncertainty in solar irradiance. We will model the SMUD service region as its own balancing region, and develop an integrated, real-time operational tool that takes solar-load forecast uncertainties into consideration and commits optimal energy resources and reserves for intra-hour and intra-day decisions. The primary objectives of this effort are to reduce power system operation cost by committing appropriate amount of energy resources and reserves, as well as to provide operators a prediction of the generation fleet’s behavior in real time for realistic PV penetration scenarios. The proposed methodology includes the following steps: clustering analysis on the expected solar variability per region for the SMUD system, Day-ahead (DA) and real-time (RT) load forecasts for the entire service areas, 1-year of intra-hour CPR forecasts for cluster centers, 1-year of smart re-forecasting CPR forecasts in real-time for determination of irreducible errors, and uncertainty quantification for integrated solar-load for both distributed and central stations (selected locations within service region) PV generation.

14 SOLAR ENERGY↗

Iowa Hill Pumped Storage Project Investigations - Final Technical Report

This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

13 HYDRO ENERGY↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Managing changes in peak demand from building and transportation electrification with energy efficiency [Slides]

The Department of Energy funded Berkeley Lab to provide technical assistance to two municipal utilities on how energy efficiency and demand flexibility can mitigate the peak demand impacts of building and transportation electrification. Berkeley Lab worked with these utilities, Sacramento Municipal Utility District (SMUD) and Fort Collins Utilities, to identify research questions that supported their planning needs. For both utilities, Berkeley Lab developed scenario-based load forecasts that considered baseline and high-efficiency building electrification. For SMUD, the forecast also explored the sensitivity of peak demand to extreme weather (a winter cold snap) at the system-level. For Fort Collins Utilities, the forecast addressed the impacts of low, medium, and high levels of building and transportation technology adoption on select distribution feeders. Berkeley Lab is also developing a guidance document for utilities that will draw on lessons learned from the technical assistance and provide a framework for conducting similar analyses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Meadowview Neighborhood Electrification Project

Awarded a Congressionally Directed Spend (CDS) in 2023, Sacramento Municipal Utility District (SMUD) has successfully executed the Meadowview Neighborhood Electrification Project designed to demonstrate the efficacy of residential energy efficiency and weatherization upgrades for under-resourced communities positively impacting energy use reductions, financial metrics, and indoor air quality. Initially, the project sought to electrify and upgrade 300 homes in Sacramento’s Meadowview neighborhood. However, as interest and momentum grew, the project team proved increasingly efficient and was able to retrofit 374 homes. The project built on SMUD’s years of effort increasing energy efficiency, weatherization, and electrification for low-income residential customers—moving beyond incremental improvements toward full home electrification where it was both feasible and cost-effective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sacramento Deep Energy Retrofit (DER) Home Study

This project was part of the Sacramento Municipal Utility District (SMUD) Deep Energy Retrofit (DER) Project which included several other homes in addition to the the subject of this study. Some of the reports and presentations included in this dataset cover the whole DER project. The retrofit home was one of several homes in the DER project. The goal of this monitoring plan is to develop a protocol for monitoring the SMUD DER project and answer the following major questions: 1. Is heat pump water heater performing as expected? 2. Is the whole house energy as expected? 3. Based on monitored results, how can performance be improved in future retrofit projects?

Array↗

Sacremento Municipal Utility District 100-MW sub e photovoltaic plant

A status report on plans for the Sacramento Municipal Utility District (SMUD) 1-MW photovoltaic power plant is presented. DOE, the California Energy Commission, and SMUD will fund the project cooperatively. Emphasis is placed on the details of the government contract/cooperation agreement.

Powell, R. V.↗

Evaluation of PV Module Field Performance

This paper describes an effort to inspect and evaluate PV modules in order to determine what failure or degradation modes are occurring in field installations. This paper will report on the results of six site visits, including the Sacramento Municipal Utility District (SMUD) Hedge Array, Tucson Electric Power (TEP) Springerville, Central Florida Utility, Florida Solar Energy Center (FSEC), the TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification.

14 SOLAR ENERGY↗

Retrofit California: Better Buildings Program Overview

Energy efficiency retrofits (also called upgrades) are widely recognized as a critical component to achieving energy savings in the building sector to help lower greenhouse gas (GHG) emissions. To date, however, upgrades have accounted for only a small percentage of aggregate energy savings in building stock, both in California and nationally. Although the measures and technologies to retrofit a building to become energy efficient are readily deployed, establishing this model as a standard practice remains elusive. Retrofit California sought to develop and test new program models to increase participation in the energy upgrade market in California. The Program encompassed 24 pilot projects, conducted between 2010 and mid-2013 and funded through a $30 million American Recovery and Reinvestment Act (ARRA) grant from the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The broad scope of the Program can be seen in the involvement of the following regionally based Grant Partners: Los Angeles County (as prime grantee); Association of Bay Area Governments (ABAG), consisting of: StopWaste.org for Alameda County, Regional Climate Protection Authority (RCPA) for Sonoma County, SF Environment for the City and County of San Francisco, and City of San Jose; California Center for Sustainable Energy (CCSE) for the San Diego region; Sacramento Municipal Utilities District (SMUD). Within these jurisdictions, nine different types of pilots were tested with the common goal of identifying, informing, and educating the people most likely to undertake energy upgrades (both homeowners and contractors), and to provide them with incentives and resources to facilitate the process. Despite its limited duration, Retrofit California undoubtedly succeeded in increasing awareness and education among home and property owners, as well as contractors, realtors, and community leaders. However, program results indicate that a longer timeframe will be needed to transform the market and establish energy retrofits as the new paradigm. Innovations such as Flex Path, which came about because of barriers encountered during the Program, have already shown promise and are enabling increased participation. Together, the pilots represent an unprecedented effort to identify and address market barriers to energy efficiency upgrades and to provide lessons learned to shape future program planning and implementation. The statistics reflects the scope of the marketing and outreach campaigns, which tested a variety of approaches to increase understanding of the benefits of energy upgrades to drive participation in the Program. More traditional methods such as TV and radio advertisements were complimented by innovative community based social marketing campaigns that sought to leverage the trusted status of neighborhood organizations and leaders in order to motivate their constituents to undertake retrofits. The remainder of this report provides an overview of Retrofit California including brief summaries of the pilots’ main components and highlights, followed by the major findings or takeaway lessons from the approaches that were tested. Eleven of the pilots will be continued, with modifications, under the ratepayer-funded Regional Energy Networks. Involvement in the RENS by many of the Retrofit California partners will ensure that early lessons learned are carried forward to guide future programs for energy upgrades in California.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SMART Scale An Innovative Program Accelerating the Energy Efficiency Market

Small business is a major component of the American economy. More than half of all private sector workers in this country are employed by small businesses and nearly two-thirds of the new jobs generated in the last ten years were created in this sector. Studies have shown that buildings of less than 50,000 square feet represent 94% of the commercial sector and half of all non-residential floor space in the United States. The future of the American economy relies on a vibrant, robust, and profitable small business community. Small and mid-sized businesses (SMB) can increase their profitability by reducing their operating costs through energy efficiency. The SMART Scale program delivers deep retrofits that maximize energy and cost savings for the SMB market and can be adapted throughout the country in markets of all sizes. For the past 14 years, Ecology Action has been perfecting a Direct Install (DI) program for the SMB market that offers this sector the type of sophisticated, comprehensive energy saving opportunities that were previously available only to large commercial and industrial customers. The DI 2.0 model that Ecology Action has administered for several public and investor-owned California utilities, and most recently for the Sacramento Municipal Utilities District (SMUD), provides the template for a successful retrofit program that can address the unique barriers faced by the SMB sector and achieve a greater impact than traditional DI programs. The impressive results produced by the DI 2.0 program prompted the US Department of Energy to award Ecology Action a $2 million grant in 2013 to create, demonstrate and roll out a replicable model for delivering deep retrofits to small commercial buildings. The grant enabled Ecology Action to build on the success of DI 2.0 by incorporating improvements into the model, market-testing it and designing a costeffective method of achieving significant energy savings for small businesses across the country.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Greenbuilt Construction Energy Efficiency Retrofit House Demonstration - Sacramento

One of the homes that was part of Sacramento Municipal Utility District's (SMUD) Energy Efficiency Retrofit Demonstration (EERD) project was a 1980's era home in Fair Oaks, California, referred to as the Greenbuilt house, as Greenbuilt Construction completed the retrofit of the home. The home underwent an extensive energy efficiency retrofit with a goal of achieving a 50% reduction in energy use to demonstrate the potential for other builders and homeowners in the area. The retrofit measures included installing: ENERGY STAR appliances high efficiency light roof radiant barrier additional ceiling and wall insulation double-pane, low-e windows external motorized shading and solar tubes a 16 SEER/9.75 HSPF heat pump improved ducts a whole-house fan a heat pump water heater (HPWH) integrated collector storage solar water heater (ICS SWH) and 3.2 kW of PV. In addition, the home was air sealed to reduce infiltration. Researchers from the National Renewable Energy Laboratory (NREL) performed short-term tests on the major systems installed as part of the retrofit to ensure that they were performing as expected. The systems evaluated included the space conditioning heat pump, the air handler and ducts, the HPWH, the ICS SWH, and the PV array. Some ducts were untwisted after testing revealed that two rooms were not getting sufficient airflow. Afterwards, all systems were performing as expected. In addition to testing to confirm adequate performance of all new systems, NREL was given the opportunity to use the Greenbuilt house as a laboratory house for a year. The space conditioning system and home water systems were subjected to a series of tests to determine optimal control strategies for lowering energy consumption and reducing peak (4:00-7:00 p.m.) energy consumption during the summer. The different cooling strategies considered included two different precooling schedules, drawing the external shades during the day and using the whole-house fan at night, and combinations of those. The most effective strategy for reducing overall energy consumption was the use of external shades, which cut the daily cooling load by 34% and reduced the energy use during peak hours by 40%. The different precooling strategies eliminated the peak load entirely but actually increased daily cooling energy use. The use of shades and the advanced precooling strategy increased the daily energy use by 5% but eliminated all peak use and maintained a comfortable home. These results were verified over the entire summer using an Energy Plus model of the home. The hot water system was tested in two configurations: the HPWH alone and the ICS solar water heater paired with the HPWH. Six hot water draw profiles, varying in terms of daily hot water volume, time of day for hot water use, and the duration of the draws, were imposed on the hot water system to test their effects on performance. When operating alone in the summer, the HPWH operated with a COP around 2.2, except for a draw that used a quarter of the averaged daily hot water usage, which had an average COP of 1.6. The combination of ICS and HPWH resulted in larger COPs, but also more variability depending on the draw profile. The standard, hourly draw profile produced the highest COP of 6.4. The quarter volume draw profile had the lowest COP of 2.8 for the combined system. Relative to a standard electric water heater, the HPWH operating alone reduced the peak load by 56% and the combined ICS and HPWH system completely eliminated the peak load.

air sealing↗

Hot-spot heating in central-station arrays

Hot spot tests performed on the Sacramento Municipal Utility District (SMUD) verificaton array show that current imbalance occurs, resulting in significant hot spot heating. One cause of current imbalance is differences in the average shunt resistances of parallel cell strings due to cell shunt resistance variations. In depth hot spot tests are performed on the verification array with bypass diodes. The tests had several objectives: (1) a comparison of hot spot temperatures achieved under field conditions with those obtained with the present laboratory hot spot test using similar modules; (2) an assessment of current imbalance versus cross tie frequency; and (3) an assessment of different shadow patterns and shadow densities. Instrumented modules are used to vary the number of cross ties and to measure the test-cell current and back-bias voltage. The widths, lengths, and densities of the shadows are varied to maximize the back bias voltage at maximum power current. An infrared camera is used to indicate the existence of hot spots and estimate temperature increases in conjunction with thermocouples. The results of these hot spot tests indicate a sensitivity of back bias heating to the shadow size (amount of cell coverage) and density.

Gonzalez, C. C.↗

Hot-spot investigations of utility scale panel configurations

The causes of array faults and efforts to mitigate their effects are examined. Research is concentrated on the panel for the 900 kw second phase of the Sacramento Municipal Utility District (SMUD) project. The panel is designed for hot spot tolerance without comprising efficiency under normal operating conditions. Series/paralleling internal to each module improves tolerance in the power quadrant to cell short or open circuits. Analtyical methods are developed for predicting worst case shade patterns and calculating the resultant cell temperature. Experiments conducted on a prototype panel support the analytical calculations.

Arnett, J. C.↗

Interface standardization

Central-station applications create a large and attractive market for photovoltaics in the near future. However, some significant barriers lie between the industry of today and realization of that market. Manufacturing capacity and price are two principal impediments. The Utilities, which are the future system owners, are gaining experience with central-station PV power through the Sacramento Municipal Utility District, Hesperia and similar small central-station installations. SMUD has recognized that competition must be maintained to help reduce prices. So little standardization exists that the cost is driven upward to redefine mechanical and electrical interfaces for each vendor. New structues are required for each vendor and nonoptimum field geometries result from attempts to include more than one vendor in an array field. Standards at some hardware level are required.

Spencer, R.↗

Using EnergyPlus to Simulate the Dynamic Response of a Residential Building to Advanced Cooling Strategies: Preprint

This study demonstrates the ability of EnergyPlus to accurately model complex cooling strategies in a real home with a goal of shifting energy use off peak and realizing energy savings. The house was retrofitted through the Sacramento Municipal Utility District's (SMUD) deep energy retrofit demonstration program; field tests were operated by the National Renewable Energy Laboratory (NREL). Theexperimental data were collected as part of a larger study and are used here to validate simulation predictions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗