Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Integrated Transmission-Distribution Multi-Period Switching for Wildfire Risk Mitigation: Improving Speed and Scalability with Distributed Optimization: Preprint

With increasingly severe wildfire conditions driven by climate change, utilities must manage the risk of wildfire ignitions from electric power lines. During "public safety power shutoff'" events, utilities de-energize power lines to reduce wildfire ignition risk, which may result in load shedding. Distributed energy resources provide flexibility that can help support the system to reduce load shedding when lines are de-energized. We investigate a coordinated transmission-distribution optimization problem that balances wildfire risk mitigation and load shedding. We model distribution systems that include battery energy storage systems which may support loads when transmission lines are de-energized. This multi-period integrated transmission-distribution optimal switching problem jointly optimizes line switching decisions, the generators' setpoints, load shedding, and the batteries' states of charge, resulting in significant computational challenges. To improve scalability, we decompose the problem over both space and time and apply a distributed optimization algorithm. Using a large-scale synthetic California test case with realistic distribution models and real wildfire risk data, we show that distributed optimization can solve large-scale multi-period switching problems that are otherwise intractable for centralized solvers. We also discuss challenges and future directions for improving the distributed algorithm's convergence performance as the number of time periods increases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

Catena, John J.↗

Supply Chain Risk Mitigation for Scientific Facilities and Tools

In November 2021, the U.S. Department of Energy (DOE) Office of Science (SC) convened a roundtable on “Supply Chain Risk Mitigation for Scientific Facilities and Tools” to gather information about current supply chain challenges in key technology areas unique to SC or critical to its mission. The roundtable brought together technical, project management, and procurement experts from DOE national laboratories, industry, academia, and other government agencies. Panelists explored opportunities, possible partnerships, and mechanisms to strengthen the domestic supply chain for critical SC technologies.

99 GENERAL AND MISCELLANEOUS↗

Utilizing Open-Source Earth Observations to Inform the Toa Baja Municipality’s Flood Risk Mitigation Efforts and Educate the Public

Global climate changes contribute to more intense and frequent tropical storms, subjecting places like Toa Baja, Puerto Rico to critical damage. Known as “the underwater city” due to its propensity to flood, residents of Toa Baja face constant flood risk. During extreme tropical storm events, such as Hurricane Maria in 2017, residents experienced up to 20 feet of inundation. The NASA DEVELOP National Program collaborated with the Municipio Autónomo de Toa Baja, ResilientSEE-PR, and the MIT Urban Risk Lab to supplement 2018 FEMA HEC-RAS flood maps that designate 63% of Toa Baja as a flood plain. This analysis provides a high-resolution interpretation of flood risk through two lenses; susceptibility and vulnerability. For this analysis, susceptibility consists of nine weighted layers: NDVI, landcover, slope, elevation, topographic wetness index, height above nearest drainage, saturated hydraulic conductivity, distance to water, and storm surge. These factors are consistently used to evaluate susceptibility to flood, but their weights vary by analysis. Vulnerability consists of population, informal settlements, and building density, which were given equal weight. Susceptibility and vulnerability were combined to map flood risk. This analysis used a bivariate legend to understand the different levels of risk along a spectrum from low susceptibility and low vulnerability (low risk) to high susceptibility and high vulnerability (high risk). Data processed in Google Earth Engine, which identified historical inundation on various occasions, were used to validate the flood susceptibility layers. Results showed 89% of areas designated as high susceptibility are located within the floodway designated by the FEMA HEC-RAS maps. The eastern region of Toa Baja is most at risk for flooding due to high susceptibility to flooding along with a high density of population, buildings, and informal settlements. The resulting map also reveals the presence of smaller high-risk areas all around the municipality. This analysis provides scientific evidence for flood risk mitigation in Toa Baja by highlighting areas that might be impacted by strong floods in the future. Additionally, these results are communicated in an Esri ArcGIS StoryMap, an accessible platform that can easily inform the public about the flood risk in their neighborhood.

Adriana Le Compte↗

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.↗

Numerical Simulations of Geologic Storage Reservoir Management to Support Risk Mitigation Evaluation

This report provides a detailed description of a set of numerical simulations that represent reservoir behavior over time in response to different operational decision scenarios for detection of potential leakage and reduction or avoidance of leakage impact at a hypothetical geological carbon storage (GCS) site. These simulations serve as the basis for a series of GCS leakage risk forecasts that are to be developed using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), and a demonstration of a simple decision support workflow for evaluation of mitigation strategies based on results of those system model forecasts. This risk assessment and decision support study is forthcoming. Four injection scenarios were considered: a constant rate carbon dioxide (CO 2 ) injection case (base case), a case with CO 2 injection rate adjustment, a case with early termination of injection operations, and a case with brine extraction. CO 2 injection operations were controlled to ensure that the pressure transient remains below the defined manageable reservoir fracture pressure, with consideration shown to hypothetical locations within the modeled spatial domain where the overburden was weaker and lower transient pressure increases were allowable. Additionally, a brine extraction alternative was considered as a reservoir management and risk mitigation option to reduce reservoir pressure, steer the plume away from any hypothetical geohazard such as fault as needed, and enhance storage capacity. Such operational actions contribute to risk management overtime. This study explores the potential utility of reservoir management for risk reduction at GCS sites. This study shows that the injection design may modify the time to CO 2 breakthrough at a legacy well; in particular, these results show that brine extraction can add value for mitigating risk both by delaying leakage and reducing pressure build-up. For the scenario considered, both pressure plots and pressure distributions demonstrate that pressure build-up was decreased by 3% with brine extraction. Additionally, extraction of brine afforded enhancement of CO 2 storage capacity by 5% compared to the base case. These findings suggest that brine extraction has substantial potential to steer the risk-related reservoir effects away from known geohazards (e.g., faults and legacy wells) by conducting pressure transient effects and CO 2 plume movement toward the production well. Injection rate adjustment scenarios considered in this study show potential value for managing both reservoir pressure transients and CO 2 plume behavior. Operational actions for reducing injection and/or early termination of injection (as compared to the base case), however, require careful design; tailoring both the extent and timing of injection rate adjustment over the injection and post-injection operational period must be thoroughly planned to balance maximizing storage and minimizing subsurface environmental risk. The study also gives preliminary consideration to the effectiveness that monitoring strategy may play in providing useful information to inform reservoir management decisions for risk reduction. Two types of monitoring were considered: 1) pressure build-up or pressure transient; and 2) potential leakage detection from a CO 2 mass or plume. Four hypothetical legacy wells, two plugged and two abandoned, were placed in the model domain. Monitoring along these wells was measured over time in individual stacked reservoir formations and shale formations to support risk mitigation decisions, especially operational decisions that assisted in risk reduction. These simulations will serve as the basis for a series of GCS leakage risk forecasts that are to be developed using NRAP’s Open-IAM, and demonstration of a simple decision support workflow for comparative assessment of mitigation alternatives based on results of those system model forecasts. This risk assessment and decision support study is forthcoming.

54 ENVIRONMENTAL SCIENCES↗

InVEST Urban Development: Incorporating Earth Observation Data into the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model Python API

Urban flooding poses as one of the biggest issues for cities today, as its impacts are amplified by both climate change and urbanization. The Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation (UFRM) model, which benefits from its simplicity and robustness, is commonly used in NASA DEVELOP projects for disaster mitigation, urban planning, and environmental justice issues. While InVEST UFRM model was able to produce the surface water runoff and retention map sufficient for the scopes of past projects, the model accuracy and spatial variability need improvement. Since the current InVEST UFRM model employs constant rainfall depth for all pixels in the area of interest (AOI), the model suffers from inaccurately estimating rainfall depth, runoff volume, and flood depth. Therefore, we adapted the model so that satellite-based precipitation raster datasets (i.e., Integrated Multi-satellitE Retrievals for Global Precipitation Measurement [GPM IMERG]) can be used instead of a single constant value. We simulated the flood events on August 21st and August 22nd, 2017 in Wyandotte County, Kansas using both our modified and the original InVEST UFRM model and then compared the results after incorporating the rainfall raster into the model. Areas with developed land on the land use map predicted moderate to high flood volume in the original volume regardless of the actual amount of precipitation. The modified model considered the rainfall depth’s spatial variation achieving less overestimation of flood runoff and volume at low-to-moderate rainfall area.

Son Do↗

InVEST Urban Development: Incorporating Earth Observation Data into the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model Python API

Urban flooding poses as one of the biggest issues for cities today as its impacts are amplified by both climate change and urbanization. The Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation (UFRM) model, which benefits from its simplicity and robustness, is commonly used in NASA DEVELOP projects for disaster mitigation, urban planning, and environmental justice issues. While the InVEST UFRM model was able to produce the surface water runoff and retention map sufficient for the scopes of past projects, the model’s accuracy and spatial variability need improvement. Since the current InVEST UFRM model employs constant rainfall depth for all pixels in the area of interest (AOI), the model suffers from inaccurately estimating rainfall depth, runoff volume, and flood depth. Therefore, we adapted the model so that satellite-based precipitation raster datasets (i.e., Integrated Multi-satellitE Retrievals for Global Precipitation Measurement [GPM IMERG]) can be used instead of a single constant value. We simulated the flood events on August 21st and August 22nd, 2017, in Wyandotte County, Kansas using both our modified and the original InVEST UFRM model and then compared the results after incorporating rainfall raster into the model. Areas with developed land on the land use map predicted moderate to high flood volume in the original volume regardless of the actual amount of precipitation. The modified model considered the rainfall depth’s spatial variation achieving less overestimation of flood runoff and volume at low-to-moderate rainfall area.

Urban flooding↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Supporting Technology at GRC to Mitigate Risk as Stirling Power Conversion Transitions to Flight

Stirling power conversion technology has been reaching more advanced levels of maturity during its development for space power applications. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower Inc., and the NASA Glenn Research Center (GRC). This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. Of paramount importance is the reliability of the power system and as a part of this, the Stirling power convertors. GRC has established a supporting technology effort with tasks in the areas of reliability, convertor testing, high-temperature materials, structures, advanced analysis, organics, and permanent magnets. The project utilizes the matrix system at GRC to make use of resident experts in each of the aforementioned fields. Each task is intended to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. This paper will provide an overview of each task, outline the recent efforts and accomplishments, and show how they mitigate risk and impact the reliability of the ASC s and ultimately, the ASRG.

Schreiber, Jeffrey G.↗

Milwaukee Urban Development: Assessing the Drivers of Urban Flood Vulnerability in Milwaukee using the Integrated Valuation of Ecosystem Services and Tradeoffs Urban Flood Risk Mitigation Model (InVEST)

Milwaukee County has experienced an increase in flooding due to climate change and urbanization. The frequency and severity of flooding vary spatially due to differences in land cover, surface permeability, and infrastructure. Marginalized communities tend to experience disproportionately high flooding and damage due to infrastructural inequalities and limited access to resources. To quantify these differences, we used the Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model to calculate and create maps of runoff retention, nominal flood depth, and economic damage to buildings in Milwaukee. Our model inputs included land cover, surface permeability, and rainfall. To inform our precipitation inputs, we used NASA’s Integrated Multi-satellite Retrievals for Global Precipitation Measurement (GPM IMERG) and National Weather Service (NWS) data. We assessed the relationship between flood risk and social and environmental spatial data including redlining, racial demographics, greenspace, and community resilience. The data demonstrate that flood risk is higher in historically redlined neighborhoods, majority Hispanic and Black census block groups, areas that lack parks and trees, and areas of low community resilience as measured by the Census Bureau’s Community Resilience Estimates (CRE). These findings will support our partners, Groundwork Milwaukee and Groundwork USA, in their efforts to promote the equitable distribution of resources and support environmental health in urban spaces. The end products of this project provide our partners with tools to assess urban flooding vulnerability, guide future intervention projects, quantify the effects of environmental injustice, and improve stakeholder access to data.

Madeleine Tango↗

Trajectory Design to Mitigate Risk on the Transiting Exoplanet Survey Satellite (TESS) Mission

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several orbit constraints. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and to optimize nominal trajectories, check constraint satisfaction, and finally model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

design↗

Trajectory Design Enhancements to Mitigate Risk for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, which will be reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several constraints on the science orbit and on the phasing loops. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V (DV) and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and optimal nominal trajectories; to check constraint satisfaction; and finally to model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

satellite↗

Satellite Breakup Risk Mitigation

Many satellite breakups occur as a result of an explosion of stored energy on-board spacecraft or rocket-bodies. These breakups generate a cloud of tens or possibly hundreds of thousands of debris fragments which may pose a transient elevated threat to spaceflight crews and vehicles. Satellite breakups pose a unique threat because the majority of the debris fragments are too small to be tracked from the ground. The United States Human Spaceflight Program is currently implementing a risk mitigation strategy that includes modeling breakup events, establishing action thresholds, and prescribing corresponding mitigation actions in response to satellite breakups.

Leleux, Darrin P.↗

Establishing the Assurance Efficacy of Automated Risk Mitigation Strategies

Verification and validation of increasingly autonomous aviation systems is a major challenge. Traditional techniques for the assurance of high-confidence, safety-critical systems are not equipped to handle the complexity, uncertainty, and lack of predictability inherent in non-deterministic systems. Techniques such as run time monitoring, formal methods, and testing and simulation have been applied to some effect, but it is difficult to properly assess the success of such measures. The authors propose the concept of Assurance Efficacy to address this gap. Assurance Efficacy is seen as a parameter, criteria, or perspective by which to evaluate, identify and explore safety risk mitigation strategies and operational assurance architectures. Validation of the utility of this concept through flight testing is a first step in determining its potential role in assessing the overall safety of complex, increasingly autonomous systems that cannot be fully assured in the design phase.

system safety↗

Modeling the U.S. Western Electric Interconnection to Understand the Consequences of Hydrometeorological Extremes and Options for Risk Mitigation

Electricity grid operators around the world face a dual challenge; withstanding increasingly severe weather and the longer term impacts of climate change, while simultaneously decarbonizing. Extreme weather events such as heat waves and droughts are rising in both severity and frequency, which is threatening the reliability of electricity grids through increased demand, generation capacity losses, and equipment failures. Consequently, incorporating hydrometeorological stressors into computational power systems analysis is becoming an even more critical tool in long term planning and short term operations. However, there is a general lack of open-source customizable grid simulation software capable of exhaustively stress testing the grid under hydrometeorological uncertainty, and/or examining potential risk mitigation pathways. A related, persistent challenge for power system modelers is striking an appropriate balance between model fidelity (e.g. spatial scale and time resolution) and computational tractability (wall clock run-time). In this study, we are proposing a solution to this problem with open-source software that allows users to seamlessly customize the scale and track the accuracy of grid operations models. Our approach allows users to search over numerous model parameters (network topology, mathematical formulation, economic hurdle rates, and transmission line scaling) to identify model instantiations that accommodate experimental design. Further, we use this approach to demonstrate the importance of including extreme weather events in model validation and model selection. Focusing on the occurrence of heatwaves and droughts in the U.S. Western Interconnection, we examine role of extreme events in balancing tradeoffs between model fidelity and run-time at the model design stage.

Economics↗

Biotechnology System Facility: Risk Mitigation on Mir

NASA is working with its international partners to develop space vehicles and facilities that will give researchers the opportunity to conduct scientific investigations in space. As part of this activity, NASA's Biotechnology Cell Science Program (BCSP) at the Johnson Space Center (JSC) is developing a world-class biotechnology laboratory facility for the International Space Station (ISS). This report describes the BCSP, including the role of the BTS. We identify the purpose and objectives of the BTS and a detailed description of BTS facility design and operational concept, BTS facility and experiment-specific hardware, and scientific investigations conducted in the facility. We identify the objectives, methods, and results of risk mitigation investigations of the effects of microgravity and cosmic radiation on the BTS data acquisition and control system. These results may apply to many other space experiments that use commercial, terrestrial-based data acquisition technology. Another focal point is a description of the end-to-end process of integrating and operating biotechnology experiments on a variety of space vehicles. The identification of lessons learned that can be applied to future biotechnology experiments is an overall theme of the report. We include a brief summary of the science results, but this is not the focus of the report. The report provides some discussion on the successful 130-day tissue engineering experiment performed in BTS on Mir and describes a seminal gene array investigation that identified a set of unique genes that are activated in space.

Gonda, Steve R., III↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗