Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Right Of Way”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Reinvention/reengineering of business and technical processes

The changing marketplace as evidenced by global competition is requiring American organizations to rethink, regroup, and redesign their processes. The umbrella of total quality management (TQM) includes many quality methods, techniques, tools, and approaches. There is no right way for every situation or circumstance. Adaptability and experimentation of several tools is necessary. Process management when properly applied can lead to continuous quality improvements. But some processes simply need to be discarded and new ones developed. This reengineering often results in vertical compression and job redesign and restructuring. Work activities must be designed around processes, not processes around work activities. Reengineering and process management do not stand alone--they support each other. Senior executive leadership and empowerment of workers at all organizational levels is vital for both short-term and long-term success.

Olsen, Eugene A.↗

Exploring the Impact of Compliance With Maneuvering Guidelines for Space Traffic Management

If the current estimate of proposed large constellations is realized, the near-Earth space environment will see more than 50,000 new satellites added to the catalog of resident space objects (RSOs) in the coming decade. This is an order of magnitude increase from the current population and poses new policy challenges as global operators seek to leverage the benefits these new satellite systems provide while also ensuring a sustainable approach to collision avoidance. Various guidelines have been proposed to date to support this effort, including the development of right of way rules to guide how a collision avoidance maneuver should be performed, and how the maneuver burden should be shared between the two satellites involved. However, it is very difficult to evaluate and compare proposed guidelines due to the complex nature of space traffic and the rapidly changing space environment. This study seeks to address this issue by utilizing the Virtual Environment for Space Traffic Analysis (VESTA), a high-fidelity simulation tool that has been developed at Georgia Tech over the past few years with the explicit purpose of evaluating the future of space traffic environment. Using this tool, a sensitivity study is performed that incorporates a likely set of future large constellations and provides metrics on the impact that a select set of proposed maneuvering guidelines would have on operators given realistic variations in spacecraft capabilities (e.g. maneuverability and propulsion capabilities), and other factors (owner-country, public vs. private, etc.). Specifically, this study compares three potential right of way rules: 1) a rule based on maneuverability proposed by the Space Safety Coalition, 2) a rule based on the geometry of the spacecraft rendezvous, and 3) a rule that equally distributes the maneuver burden between two operators, The results highlight general observations on the effectiveness and limitations of each of the proposed maneuvering guidelines. In addition to the choice of right of way rule, success of space traffic management will be significantly impacted by compliance – which operators, or how many operators, comply with the space traffic rules. The findings of this analysis have important implications for future methods that could be pursued to put in place right of way rules. For example, non-binding right of way rules may have variable levels of compliance that differ across actors. The impact of compliance by just one nation, or non-compliance by just one nation, help to demonstrate the impact of ensuring all major space actors coordinate on this effort. Overall, this analysis provides insight into the relative gains in safety (decrease in collision risk) that would likely result from more politically intense efforts to increase the number of countries implementing space traffic management rules.

conjunction assessment↗

Quantifying impact reduction due to avoidance, minimization and restoration for a natural gas pipeline in the Peruvian Andes

We present monitoring methods and quantitative biodiversity data to document components of the mitigation hierarchy. We estimated avoidance, minimization, restoration and impact reduction in quality hectares for the 25 m wide right of way of a 408 km natural gas buried pipeline that crosses 14 Ecological Landscape Units (ELUs) in the tropical Andes of Peru. We found that applying the mitigation hierarchy as part of a comprehensive biodiversity action plan substantially reduced impacts on biodiversity in all habitats studied. Avoidance and right of way minimization contributed to significant impact reduction. We quantified impact reduction during construction and operation on the right of way of the pipeline over a five-year period and found that restoration was the greatest contributor to reducing impacts. We documented that most ELUs have a positive restoration trajectory. We also documented how monitoring over large scale spatial scales, in combination with site-specific monitoring, generated data for management to determine restoration priorities and impact mitigation. A biodiversity action plan that incorporated the mitigation hierarchy and a science-based biodiversity monitoring and assessment program contributed to biodiversity management of the project and played an important role in minimizing and managing impacts. - Highlights: •Quantitative data for mitigation hierarchy components are presented. •Application of the mitigation hierarchy reduced impacts on biodiversity. •A biodiversity monitoring program provided data to reduce impacts.

03 NATURAL GAS↗

Exploring the Effectiveness of Maneuvering Guidelines for Space Traffic Management

The number of objects in space has been increasing rapidly, and the risk of collision has grown as well. Many spacecraft operators are now receiving multiple collision warnings a day. Despite this, systems to manage space traffic have been limited: there are no broadly agreed upon guidelines or rules governing the response to predicted potential collisions. Instead, spacecraft operators generally determine whether, when, and how to respond to these warnings on a manual and ad hoc basis. Coordination between operators, if it occurs, often requires repeated communication and negotiation. Some space actors have suggested that the space community should develop right of way rules, similar to those in the ground, sea, and air domains, to guide collision response decisions. However, it is unclear whether such rules would be effective, and it’s unknown whether such rules would have an equitable impact across various spacecraft operators. To address these issues, we developed the Virtual Environment for Space Traffic Analysis (VESTA), a software tool that was used to simulate the space environment with a recent catalog of objects obtained from the U.S. Space-Track.org system. We implemented multiple potential right of way rules within this model. The analysis confirmed that the choice of right of way rule makes a meaningful difference in terms of both efficiency and distributional effects in terms of collision avoidance maneuvers. For example, our analysis shows that rules in which the less massive satellite is required to maneuver results in a more equitable distribution of maneuver responsibility among space actors and also requires less fuel mass, compared to a rule in which the more massive satellite maneuvers.

space traffic management↗

Free Flight and Self-Separation from the Flight Deck Perspective

The concept of "free flight", while still being developed, is intended to emphasize more, flexibility for operators in the National Airspace System (NAS) by providing more separation responsibility to pilots, New technologies, procedures, and concepts have been suggested by the aviation community to enable this task; however, much work needs to be accomplished to help define and evaluate the concept feasibility. The purpose of this simulation was to begin examining some of the communication and procedural issues associated with self-separation in the enroute environment. A simulation demonstration was conducted in the Boeing 747-400 simulator at NASA Ames Research Center. Commercial pilots (from a U.S. domestic carrier) current on the B747-400 aircraft were the participants. Ten flight crews (10 captains, 10 first officers) flew in the Denver enroute airspace environment. A new alerting logic designed to allow for airborne self-separation was created for this demonstration. This logic assumes automatic dependent surveillance broadcast (ADS-B) capability and represented aircraft up to 120 nautical miles on the display. The new flight deck display features were designed and incorporated on the existing navigational display in the simulator to allow for increased traffic and maneuvering information to the flight crew. New tools were also provided to allow the crews to assess conflicts and potential maneuvers before implementing them. Each of the flight crews flew eight different scenarios in the Denver enroute airspace. The scenarios included eight to ten other aircraft, and each scenario was created with the intent of having one of the other aircraft become an operational conflict for our simulator aircraft. Different types of conflict geometries were represented across the eight scenarios. Also, some scenarios allowed for more time to detect a potential clearance, while others allowed for less time for'detection. Additionally, the crews were asked to a ply the Visual Flight Rules (VFR) right of way rules when determining who should maneuver in a conflict situation; therefore, the scenarios were designed to test different applications of those recommendations, Data analyses include an evaluation of crew procedures and communication. The application of the VFR right-of-way rules are being explored. Timing variables are being examined to determine potential efficiency differences between scenarios and conflict types. Proximity of aircraft will be assessed as one indication of the operational safety. The intent of these evaluations is to help provide definitions and guidelines of negotiation procedures in a self-separation environment assuming automated data link technology (ADS-B). Also, definitions of likely flight crew maneuvers and application to current VFR right-of-way rules may be obtained, along with guidelines for negotiation procedures between flight crews.

Lozito, Sandra↗

Strategy for the Identification of an INL Comprehensive Utility Corridor

This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot be used or are not economically viable. Specific detailed studies will need to be conducted on a case-by-case basis to clearly identify which sections along the perimeter can and cannot be used. Option 2, in this document, identifies areas along existing highways that could be a viable option. However, discussions would have to take place with the State of Idaho to use their easement as part of the corridor and mission impact would need to be evaluated if a specific request was made to the Department of Energy, Idaho Operations Office. Option 3, in this document, is a combination of Options 1 and 2. This option provides the most flexibility to minimize impacts to INL missions. As with the other two options, discussions and agreements with the State of Idaho would be needed and any specific route would need to be thoroughly evaluated for impact, implementation, and operability beyond just a strategy.

99 GENERAL AND MISCELLANEOUS↗

Earth Observation

For pipeline companies, mapping, facilities inventory, pipe inspections, environmental reporting, etc. is a monumental task. An Automated Mapping/Facilities Management/Geographic Information Systems (AM/FM/GIS) is the solution. However, this is costly and time consuming. James W. Sewall Company, an AM/FM/GIS consulting firm proposed an EOCAP project to Stennis Space Center (SSC) to develop a computerized system for storage and retrieval of digital aerial photography. This would provide its customer, Algonquin Gas Transmission Company, with an accurate inventory of rights-of-way locations and pipeline surroundings. The project took four years to complete and an important byproduct was SSC's Digital Aerial Rights-of-Way Monitoring System (DARMS). DARMS saves substantial time and money. EOCAP enabled Sewall to develop new products and expand its customer base. Algonquin now manages regulatory requirements more efficiently and accurately. EOCAP provides government co-funding to encourage private investment in and broader use of NASA remote sensing technology. Because changes on Earth's surface are accelerating, planners and resource managers must assess the consequences of change as quickly and accurately as possible. Pacific Meridian Resources and NASA's Stennis Space Center (SSC) developed a system for monitoring changes in land cover and use, which incorporated the latest change detection technologies. The goal of this EOCAP project was to tailor existing technologies to a system that could be commercialized. Landsat imagery enabled Pacific Meridian to identify areas that had sustained substantial vegetation loss. The project was successful and Pacific Meridian's annual revenues have substantially increased. EOCAP provides government co-funding to encourage private investment in and broader use of NASA remote sensing technology.

Source record↗

Multi-Gigawatt Electric Highway

Ultra-Compact Electrical Transmission Lines are a new transmission line technology that uses large, hollow, aluminum beams to carry current instead of thin wires. Capacity is 4.5 times higher, power losses are 3 times lower, and cost per mile is a little lower than conventional lines. Resilience and reliability are higher. The beams are enclosed within concrete walls and out of the weather, protected from high winds, ice storms, fires, and lightning. The 230 kV version is 9 feet high x 11 feet wide and can use existing rights of way next to existing transmission lines or highways. With a little landscaping, these transmission lines are not an eyesore and will be much easier to permit on existing rights of way.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Implementation and evaluation of a radiological field investigation for real property interests associated with the FUSRAP Maywood Site - 15611

Public streets, easements, and rights-of-way, collectively referred to as Real Property Interests (RPI), pose challenging and complex problems for the FUSRAP Maywood Project Team. RPIs are components of a multi-faceted objective to evaluate all remaining sources of contamination for which the Government is responsible under the Maywood Record of Decision. USACE designed and implemented a MARSSIM-based radiological investigation within sixteen potentially impacted RPIs. These RPIs were not completely addressed on their own or in conjunction with nearby property investigations or remediations. However, these RPIs were investigated based on the potential for or known impact of FMSS contamination as determined through both a historic data review of the transport mechanism (downstream waste deposition) and process knowledge obtained during Final Status Survey of proximal properties. The primary objectives of this investigation were to confirm the presence or absence of FUSRAP contamination within a given RPI, provide sufficient data to release an RPI if contamination was not encountered, and provide sufficient data for either design of an appropriate remedial solution or implementation of Land Use Controls when contamination was encountered. Of additional value, knowledge gained during the RPI investigations will allow the team to share useful radiological data with local officials and utility service providers. This information will support better, more informed decisions by all parties involved in situations such as emergency subsurface utility repairs, roadway improvement planning, or even natural disaster response. Finally, certain unexpected outcomes learned during the final data analysis may lead to refinement of the conceptual site model. Logistical lessons learned and challenges encountered during the Maywood investigation may also be helpful to stakeholders, planners, and managers of similar projects wishing to identify their own potential liability within public streets, easements, rights-of-way, and other types of RPIs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conducting Gamma Radiation Surveys on Municipal Roadways in Support of the Port Hope Area Initiative - 16602

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The project aims to remediate approximately 1.7 million cubic metres LLRW through the consolidation of waste within two Long-term Waste Management facilities to be constructed within the municipalities of Port Hope and Clarington. Within the Town of Port Hope, surveys are being conducted at approximately 5000 individual properties to confirm the presence of LLRW, delineate its extent and develop cost estimates for remediation. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and sampling for four signature contaminants. Of the 5000 properties, a number are municipal rights of way, largely municipal roads, that may have been impacted through spillage of LLRW when it was historically transported through the community for disposal and/or through its use as construction backfill. This paper describes the completion of gamma radiation surveys on these municipal rights of way and the challenges that needed to be addressed working on travelled roadways in an active community. To maximize efficiency and minimize inconvenience to motorists the gamma surveys are conducted using a mobile platform that provides high resolution spectral gamma logging coupled to GPS for geo-spatial referencing. The system employs large volume, spectroscopy grade, sodium iodide detectors that permit the collection radiological spectra allowing for effective discrimination of gamma radiation signals emitted from naturally occurring background sources (e.g. potassium 40) from the gamma emissions associated with the specific contaminants of concern (e.g. Ra-226). The system can be deployed on any platform including a backpack. For the majority of the roadways surveyed a small, self-contained, road-legal trailer attached to a motorized tow vehicle (e.g. side-by-side UTV or small pick-up truck) is used as the survey platform. This accommodates the mounting of multiple detectors and allows the surveys to be conducted without the need for closing traffic lanes thus improving productivity and safety while minimizing inconvenience to motorists. Data quality objectives are readily achieved through the use of multiple passes over the same target area providing a geo-spatially rich dataset for post-processing and imaging. Topics covered in the paper include: the logistics of completing high quality gamma surveys on travelled roadways; health, safety and traffic considerations; community outreach and response; and a comparison of isotopically-speciated data vs total gamma readings evaluating the influence of background sources. The lessons learned will be applicable to anyone planning on conducting similar surveys in urban settings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The development of natural gas and hydrogen pipeline capital cost estimating equations

Natural gas pipeline cost data collected by the Oil and Gas Journal (O&GJ) for interstate pipelines constructed from 1980 through 2017 were used to develop capital cost estimating equations that are a function of pipeline diameter, length, and U.S. region. Equations were developed for material, labor, miscellaneous, and right-of-way costs, the four cost components in the O&GJ data, for six different regions of the United States (U.S.). Each equation is a function of pipeline diameter and length. Adjustment mechanisms were then developed for converting the natural gas pipeline equations into equations for estimating the costs of hydrogen pipelines. These adjustments were based in part on an analysis completed by the National Institute for Standards and Technology (NIST). Here the results of this work were used to update cost models in the Hydrogen Delivery Scenario Analysis Model (HDSAM), developed by Argonne National Laboratory for the U.S. Department of Energy’s Hydrogen Program. Our analysis shows a wide range of pipeline cost across different U.S. regions, especially with respect to labor and right-of-way costs. The developed cost formulas for hydrogen pipelines are both important and timely as hydrogen is being considered as a zero-carbon energy carrier with the potential to decarbonize all energy sectors, and the cost of hydrogen transportation is essential for techno-economic analysis of its potential use in these sectors.

03 NATURAL GAS↗

Oregon Solar Highway Program Development Manual

Manual describing how organizations might structure and develop programs to facilitate financing, construction, operation and maintenance of solar facilities on transportation system rights of way.

14 SOLAR ENERGY↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridors and then schedule prompt action to identify, designate, and incorporate the corridors into applicable land use plans. To comply with the congressional direction provided in Section 368(b), the Agencies investigated corridor identification issues in the Section 368(b) states; this report to Congress provides information that could be relevant to possible future designation of energy corridors. Future designations, if appropriate and necessary, would occur when the Agencies undertake revisions and/or updates to land use plans that guide management decisions on lands located within individual administrative units, such as specific National Forests, National Parks, or Wildlife Refuges. At this time, the Agencies are not proposing any actions or decisions related directly or indirectly to designating energy corridors on federal land under Section 368(b) of EPAct.

08 HYDROGEN↗

Traffic signal design and simulation for vulnerable road users safety and bus preemption

Mostly, pedestrian car accidents occurred at a signalized interaction is because pedestrians cannot across the intersection safely within the green light. From the viewpoint of pedestrian, there might have two reasons. The first one is pedestrians cannot speed up to across the intersection, such as the elders. The other reason is pedestrians do not sense that the signal phase is going to change and their right-of-way is going to be lost. Developing signal logic to protect pedestrian, who is crossing an intersection is the first purpose of this study. In addition, to improve the reliability and reduce delay of public transportation service is the second purpose. Therefore, bus preemption is also considered in the designed signal logic. In this study, the traffic data of the intersection of Chong-Qing North Road and Min-Zu West Road, Taipei, Taiwan, is employed to calibrate and validate the signal logic by simulation. VISSIM 5.20, which is a microscopic traffic simulation software, is employed to simulate the signal logic. From the simulated results, the signal logic presented in this study can protect pedestrians crossing the intersection successfully. The design of bus preemption can reduce the average delay. However, the pedestrian safety and bus preemption signal will influence the average delay of cars largely. Thus, whether applying the pedestrian safety and bus preemption signal logic to an intersection or not should be evaluated carefully.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Illinois Storage Corridor - CarbonSAFE Phase III: Policy, Regulatory, Legal and Permitting Characteristics; Subtask 5.5

The Illinois Storage Corridor (ISC) project aims to advance the commercial development and implementation of carbon capture and storage (CCS) technologies within a region in Illinois of suitable geology for carbon dioxide (CO 2 ) storage in deep saline aquifers. The project partners have annual emissions greater than 6.5 million tonnes per year; storage hubs are being explored at two sites—one near the One Earth Energy facility in east-central Illinois, and one near the Prairie State Generating Company campus in southwest Illinois. To implement the technology, legal, policy, and economic considerations must be explored. The United States Environmental Protection Agency (US EPA) administers the Underground Injection Control (UIC) program and is responsible for issuing Class VI permits to construct and operate CO 2 injection wells, i.e., a UIC Class VI well permit is required to inject CO 2 into the subsurface for geologic sequestration. The largest consideration of the Class VI well requirements is to protect underground sources of drinking water (USDWs). Additionally discussed are considerations for Class VI permits relating to public engagement. Besides permitting, property rights to storage sites, subsurface pore spaces, and areas for pipeline transportation must be secured. Pore space rights is still a novel concept being explored and not yet addressed by the Illinois legislature. It is believed that surface property rights are required for the subsurface pore space below, so long as there is not a separated mineral estate in the subsurface. Illinois legislature has addressed securing rights-of-way for CO 2 transportation, allowing for easements and the exercise of eminent domain to secure such rights. Economically, the incentives for CCS are ever-expanding. Recently, the federal government broadened the availability and increased the dollar-amounts for the § 45Q tax credits for geological storage of carbon oxides. Congress has also authorized the Advanced Industrial Facilities Development Program which allocates billions of dollars in funds to installing technology at industrial facilities to reduce greenhouse gas emissions. On the state level, Illinois has had its own incentives for CCS projects since 2009 and expanded its emission-related goals again in 2021. The law enacted in 2021 specifically creates a commission to explore implementing CCS at Prairie State Generating Company, a partner on the Illinois Storage Corridor project.

54 ENVIRONMENTAL SCIENCES↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗