Reliability assessment of microcircuits and microelectronic systems.
Microcircuit components and microelectronic systems reliability assessment including short term testing, noting digital systems, packaging, production controls, etc
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Microcircuit components and microelectronic systems reliability assessment including short term testing, noting digital systems, packaging, production controls, etc
Reliability of Ball Grid Array(BGAs) was evaluated with special emphasis on space applications. This work was performed as part of a consortium led by the Jet Propulsion Laboratory (JPL) to help build the infrastructure necessary for implementation of this technology. Nearly 200 test vehicles, each with four packages, were assembled and tested using an experimental design.
Decision theory application to GEOS A spacecraft operational reliability assessment
This paper presents a reliability assessment of Reconfigurable Flight Control Systems using Semi-Markov Unreliability Range Evaluator (SURE) and Abstract Semi-Markov Specification Interface to the SURE Tool (ASSIST).
As part of the laser development process, NASA’s Goddard Space Flight Center (GSFC) requested support from the NASA Engineering and Safety Center (NESC) to independently assess the Technology Readiness Level (TRL) of the LISA Laser System (LS). The independent assessment included the following tasks: (a) assess the design for weaknesses and suggest improvements to mitigate risks, (b) assess the laser reliability plan for weaknesses and suggest improvements to mitigate risks and improve effectiveness, and (c) assess the current redundancy plan on laser subsystems for weaknesses and suggest improvements to mitigate risks and improve effectiveness. The presentation will focus on the assessment findings and the current development progress of the LISA laser to meet the mission requirements with a delivery of a form, fit, and functional TRL6 laser to the LISA mission by late 2023.
The principal capabilities of NESSUS (Numerical Evaluation of Stochastic Structures Under Stress), an advanced computer code developed for probabilistic structural response analysis, are reviewed, and its structural reliability assessed. The code combines flexible structural modeling tools with advanced probabilistic algorithms in order to compute probabilistic structural response and resistance, component reliability and risk, and system reliability and risk. An illustrative numerical example is presented.
Stirling power conversion is being considered for use in a Radioisotope Power System for deep-space science missions because it offers a multifold increase in the conversion efficiency of heat to electric power. Quantifying the reliability of a Radioisotope Power System that utilizes Stirling power conversion technology is important in developing and demonstrating the capability for long-term success. A description of the Stirling power convertor is provided, along with a discussion about some of the key components. Ongoing efforts to understand component life, design variables at the component and system levels, related sources, and the nature of uncertainties is discussed. The requirement for reliability also is discussed, and some of the critical areas of concern are identified. A section on the objectives of the performance model development and a computation of reliability is included to highlight the goals of this effort. Also, a viable physics-based reliability plan to model the design-level variable uncertainties at the component and system levels is outlined, and potential benefits are elucidated. The plan involves the interaction of different disciplines, maintaining the physical and probabilistic correlations at all the levels, and a verification process based on rational short-term tests. In addition, both top-down and bottom-up coherency were maintained to follow the physics-based design process and mission requirements. The outlined reliability assessment approach provides guidelines to improve the design and identifies governing variables to achieve high reliability in the Stirling Radioisotope Generator design.
Reliability is the ability of a product to perform the function for which it was intended for a specified period of time (or cycles) for a given set of life cycle conditions. In today's compressed mission development cycles where designing, building and testing the physical models has to occur in a matter of months not years, Projects don't have the luxury of iteratively building and testing those models. Physics of failure (PoF) is an engineering-based approach to reliability that begins with an understanding of materials, processes, physical interactions, degradation and failure mechanisms, as well as identifying failure models. The PoF approach uses modeling and simulation to qualify a design and manufacturing process, with the ultimate intent of eliminating failures early in the design process by addressing the root cause. The physics-of-failure analysis proactively incorporates reliability into the design process by establishing a scientific basis for evaluating new materials, structures and technologies. Virtual physics-of-failure modeling allows engineers to determine if new technological node can be added to an existing system. This presentation will illustrate an application of a PoF based tool during the initial phases of a printed circuit board assembly development and how the NASA GSFC team was able to dynamically study the effects of electronics parts and printed circuit board material configuration changes under simulated thermal and vibrational stresses
Reliability is the ability of a product to perform the function for which it was intended for a specified period of time (or cycles) for a given set of life cycle conditions. In today's compressed mission development cycles where designing, building and testing the physical models has to occur in a matter of months not years, Projects don't have the luxury of iteratively building and testing those models. Physics of failure (PoF) is an engineering-based approach to reliability that begins with an understanding of materials, processes, physical interactions, degradation and failure mechanisms, as well as identifying failure models. The PoF approach uses modeling and simulation to qualify a design and manufacturing process, with the ultimate intent of eliminating failures early in the design process by addressing the root cause. The physics-of-failure analysis proactively incorporates reliability into the design process by establishing a scientific basis for evaluating new materials, structures and technologies. Virtual physics-of-failure modeling allows engineers to determine if new technological node can be added to an existing system. This presentation will illustrate an application of a PoF based tool during the initial phases of a printed circuit board assembly development and how the NASA GSFC team was able to dynamically study the effects of electronics parts and printed circuit board material configuration changes under simulated thermal and vibrational stresses.
A single drift gallium arsenide (GaAs) Schottky barrier IMPATT diode and related components were developed. The IMPATT diode reliability was assessed. A proof of concept solid state transmitter design and a technology assessment study were performed. The transmitter design utilizes technology which, upon implementation, will demonstrate readiness for development of a POC model within the 1982 time frame and will provide an information base for flight hardware capable of deployment in a 1985 to 1990 demonstrational 30/20 GHz satellite communication system. Life test data for Schottky barrier GaAs diodes and grown junction GaAs diodes are described. The results demonstrate the viability of GaAs IMPATTs as high performance, reliable RF power sources which, based on the recommendation made herein, will surpass device reliability requirements consistent with a ten year spaceborne solid state power amplifier mission.
NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.
NASA (National Aeronautics and Space Administration) Johnson Space Center (JSC) Safety and Mission Assurance (S&MA) uses two human reliability analysis (HRA) methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate or screening value is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a Probabilistic Risk Assessment (PRA) that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more challenging. To determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators, and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules, and operational requirements are developed and then finalized.
No abstract available
Liquid rocket engine reliability evaluated, using static firing test data
The reliability of doped-barrier AlGaAs/GsAs multi-quantum well avalanche photodiodes fabricated by molecular beam epitaxy is investigated via accelerated life tests. Dark current and breakdown voltage were the parameters monitored. The activation energy of the degradation mechanism and median device lifetime were determined. Device failure probability as a function of time was computed using the lognormal model. Analysis using the electron beam induced current method revealed the degradation to be caused by ionic impurities or contamination in the passivation layer.
NASA Goddard Space Flight Center (GSFC) has been actively developing the laser transmitter for the Laser Interferometer Space Antenna (LISA) program since the late 2017. In 2021 we delivered a prototype laser transmitter to the LISA program for performance evaluation as well as performed an independent technology assessment on the laser design supported by the NASA Engineering and Safety Center (NESC). We continued to further develop the LISA laser with a goal of advancing the technology readiness level (TRL) of the laser to 6 by the end of 2023. In this paper, we report on the progress we made on the laser development for the LISA program as well as the technology assessment findings by the NESC.
Systems built for space flight applications usually demand very high degree of performance and a very high level of accuracy. Hence, the design engineers are often prone to selecting state-of-art technologies for inclusion in their system design. The shrinking budgets also necessitate use of COTS (Commercial Off-The-Shelf) components, which are construed as being less expensive. The performance and accuracy requirements for space flight applications are much more stringent than those for the commercial applications. The quantity of systems designed and developed for space applications are much lower in number than those produced for the commercial applications. With a given set of requirements, are these COTS components reliable? This paper presents a model for assessing the reliability of COTS components in space applications and the associated affect on the system reliability. We illustrate the method with a real application.
NASA uses two HRA assessment methodologies. The first is a simplified method which is based on how much time is available to complete the action, with consideration included for environmental and personal factors that could influence the human's reliability. This method is expected to provide a conservative value or placeholder as a preliminary estimate. This preliminary estimate is used to determine which placeholder needs a more detailed assessment. The second methodology is used to develop a more detailed human reliability assessment on the performance of critical human actions. This assessment needs to consider more than the time available, this would include factors such as: the importance of the action, the context, environmental factors, potential human stresses, previous experience, training, physical design interfaces, available procedures/checklists and internal human stresses. The more detailed assessment is still expected to be more realistic than that based primarily on time available. When performing an HRA on a system or process that has an operational history, we have information specific to the task based on this history and experience. In the case of a PRA model that is based on a new design and has no operational history, providing a "reasonable" assessment of potential crew actions becomes more problematic. In order to determine what is expected of future operational parameters, the experience from individuals who had relevant experience and were familiar with the system and process previously implemented by NASA was used to provide the "best" available data. Personnel from Flight Operations, Flight Directors, Launch Test Directors, Control Room Console Operators and Astronauts were all interviewed to provide a comprehensive picture of previous NASA operations. Verification of the assumptions and expectations expressed in the assessments will be needed when the procedures, flight rules and operational requirements are developed and then finalized.