Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Reliability Integrity Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Automating Traffic Microsimulation from SYNCHRO UTDF to SUMO

Modern transportation research relies on seamlessly integrating traffic signal data with robust network representation and simulation tools. This study presents utdf2gmns, an open-source Python tool that automates conversion of the Universal Traffic Data Format, including network representation, signalized intersections, and turning volumes into the General Modeling Network Specification (GMNS) Standard. The resulting GMNS-compliant network can be converted for microsimulation in SUMO. By automatically extracting intersection control parameters and aligning them with GMNS conventions, utdf2gmns minimizes manual preprocessing and data loss. utdf2gmns also integrates with the Sigma-X engine to extract and visualize key traffic control metrics, such as phasing diagrams, turning volumes, volume-tocapacity ratios, and control delays. This streamlined workflow enables efficient scenario testing, accurate model building, and consistent data management. Validated through case studies, utdf2gmns reliably models complex urban corridors, promoting reproducibility and standardization. Documentation is available on GitHub and PyPI, supporting easy integration and community engagement.

Luo, Roy [ORNL] (ORCID:0009000312909983)

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION

Market participation strategy of hybrid energy resources: A New York ISO case study

Drawing on existing market designs with independent resource participation in electricity markets, this study analyzes participation models for hybrid resources combining renewable generation and storage. Two models are considered: in the first, the components operate independently, with the Independent System Operator (ISO) managing the storage state of charge (SoC); in the second, the hybrid resource acts as an integrated unit, submitting offers as a “black box” and managing its SoC internally. Using a production cost model for the zonal New York Bulk Power System, we evaluate trade-offs in system reliability, market efficiency, and asset profitability. Our results provide several key insights for policymakers, showing that the ISO-managed granular model enhances social welfare through explicit SoC management, while the simpler integrated model is more computationally efficient, but may cause more real-time violations and lower overall profits.

Bansal, Rajni Kant

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION

Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

Source record

Future challenges in V/STOL flight propulsion control integration

A survey of propulsion control requirements forming part of an advanced V/STOL control requirements study has to date determined, among other findings: (1) that the dependence of V/STOL flying qualities on propulsive lift makes it necessary to identify propulsion control requirements early in a development program; (2) that V/STOL controls of the future should relieve the pilot of control functions and elevate him to the position of a flight operations manager, with substantial gains in capability and/or safety; and (3) that research is required to define the V/STOL control system reliability requirements and specific component reliability allocations. An interactive, integrated design process for the realization of these objectives is also described.

Roth, S. P.

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING

SIGHT: Stacked Integration of Geospatial Hierarchical Typologies for Inferring Building Characteristics

Building characteristics are often absent in building stock datasets, particularly in regions most vulnerable to climate change and requiring effective disaster management strategies. Traditional machine learning approaches, while widely used to predict building attributes, typically neglect the spatial context of the data, leading to less accurate and reliable outcomes. To address these challenges, this paper introduces a novel algorithm, the Stacked Integration of Geospatial Hierarchical Typologies. This algorithm adapts a meta-learning framework to incorporate geospatial context into the predictive modeling process. We demonstrate the utility of the algorithm through two primary use cases: building use type classification and building height prediction. The algorithm consistently achieved or exceeded a 0.94 macro average F1 score across five geographically distinct countries for building use type classification. For building height prediction, it accurately predicted heights with a root mean square error of 3.01 in a comprehensive study using roughly 3.6 million buildings in Japan. These results underscore the benefits of integrating spatial hierarchies into machine learning models, enhancing both predictive accuracy and reliability in geospatial modeling. This work introduces a new algorithm to address the pervasive data sparsity issue in existing building stock datasets.

Adams, Daniel [ORNL] (ORCID:0000000196950577)

A Review of Quantum Computing Technologies in Power System Optimization

As modern power grids increasingly integrate variable renewable generation, distributed energy resources, and energy storage systems, classical optimization techniques are facing unprecedented challenges. This review examines the emerging application of quantum computing to overcome these challenges in power system optimization, including optimal power flow (OPF), unit commitment (UC), economic dispatch (ED), and intelligent switching and topology optimization (IS-TO). Recent research has introduced various quantum methodologies—such as gate-based, annealing-based, variational algorithms, and quantum-inspired algorithms—to address the combinatorial complexity inherent in grid reconfiguration and energy management. The review summaries the quantum algorithms, quantum devices and the power system test cases, highlighting hybrid quantum–classical strategies that leverage the complementary strengths of both paradigms. Some quantum advantages have been observed, including theoretical speedup, accurate simulation results, scalable qubit usage, efficient QUBO mapping. In particular, the review emphasizes the importance of integrating quantum optimization techniques with classical control frameworks, these hybrid approaches demonstrate the potential to improve real-time grid management and operational reliability. A significant portion of the analysis is devoted to the practical limitations of current quantum devices. Present-day quantum hardware, operating in the noisy intermediate-scale quantum (NISQ) era, remains highly sensitive to noise and limited in qubit connectivity, which constrains the scale and accuracy of implemented algorithms. The review delves into specific challenges such as the need for qubit-efficient encoding techniques and error mitigation strategies that are critical for handling real-world grid optimization problems. In addition, the work draws attention to the performance discrepancies between theoretical quantum speedups and experimental validations, underscoring the importance of rigorous benchmark studies using representative power grid test cases. In summary, this review highlights both the promise and limitations of quantum computing for power system optimization. It provides a comprehensive overview of the state-of-the-art technologies, categorizes recent advancements in algorithm design, and discusses practical considerations for implementation, and serves as an informative resource on current research. Future research directions include developing robust hybrid frameworks, advancing qubit-efficient formulations, and scaling up experimental demonstrations to confirm the theoretical advantages of quantum methods in large-scale power system operations.

24 POWER TRANSMISSION AND DISTRIBUTION

Automated Inventory Solutions in End-User IT Support

Managing IT equipment by hand is prone to errors and delays, severely impacting operational continuity and productivity. Manual inventory systems often result in time delays, inconsistent record-keeping, equipment shortages, and increased workloads for IT staff. At Savannah River National Laboratory (SRNL), my internship focused on creating an automated inventory management solution using Microsoft Power Automate and SharePoint Lists. This solution seamlessly integrates with the existing Microsoft 365 infrastructure, thus eliminating the need for additional software purchases or dedicated server space. By providing real-time updates and reducing manual data entry, the new system ensures a more reliable and maintainable approach to IT asset management.

Information Technology

HydroForecast Long-term: Improving hydropower’s resilience to climate change through accurate climate-scale

With hydrologic patterns and water availability across the globe shifting due to climate change, advancements in hydrologic prediction systems can help significantly reduce the uncertainties that utilities and water supply entities have in their decision making. Understanding and estimating hydrology at the climate scale is critical for managing water resources under changing climate scenarios. This project focuses on integrating state-of-the-art neural network modeling with downscaled climate projections to deliver the reliable water supply projections decades into the future to meet an urgent need from hydropower operators and water utilities. In this Phase 1 DOE SBIR proposal, we developed and validated a theory-guided neural network model, HydroForecast Long-term, for climate-scale hydrology and implemented the model within existing HydroForecast infrastructure. HydroForecast Long-term combines the most accurate streamflow modeling system with a flexible and scalable data architecture to generate water supply projections out to the year 2100. This report illustrates that we have achieved our four objectives: 1) create a prototype of HydroForecast Long-term, building the neural network prediction model, 2) build an automated data input pipeline that processes large amounts of data from the latest global temperature and precipitation climate models; 3) benchmark the accuracy of the hydrologic model over the recent two decades over a large set of diverse basins, and 4) create a set of output visuals and summary metrics informed by customer feedback that connect the data to critical decision points. This work empowers water users to make data-informed decisions supporting a resilient, renewable-powered grid and water system. The results advance the Department of Energy’s mission by addressing critical gaps in water supply planning under climate change.

13 HYDRO ENERGY

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION

Operational Evolution of FTS3: A DevOps Driven Approach to Elastic Operations

The File Transfer Service (FTS3) is a distributed data movement service developed at CERN and widely used to transfer data across the Worldwide LHC Computing Grid (WLCG). At Fermilab, FTS3 supports data transfers for multiple experiments, including Intensity Frontier experiments such as DUNE, enabling reliable data movement between WebDAV endpoints in Europe and the Americas.​ At CHEP 2021, we reported on the initial containerized deployment of FTS3 on OKD, the community Kubernetes distribution of Red Hat OpenShift. In this work, we present the subsequent evolution of this deployment, focusing on new operational capabilities introduced to improve scalability, robustness, and long-term maintainability.​ We describe the adoption of more secure and reproducible container build workflows, the integration of DevOps-driven operational practices, and enhancements in monitoring and automation. A key new result is the introduction of horizontal scaling and elastic resource management, allowing FTS3 components to dynamically adapt to workload variations while maintaining service reliability. We also discuss improvements in fault tolerance and operational procedures derived from production experience.​ Finally, we summarize lessons learned from operating FTS3 as a Kubernetes-native service and outline how these developments have improved the resilience and efficiency of data movement operations at Fermilab.

Munoz Flores, Victor Leopoldo [Fermilab]

Cost-Effective Thermally Activated Building Systems to Support a Power Grid System With High Penetrations Of As-Available Renewable Energy Resources

With a goal to reduce the energy cost for building operation as well as to support renewable energy sources (RES) for the power grid reliability, quality, resilience, and dispatchability, this project developed and demonstrated a novel thermally activated building envelope system that integrates Phase Change Material (PCM)-based Thermal Energy Storage (TES) and the hydronic activation into the building envelope. The main objectives of this study are: 1) to design and laboraorty-test a novel thermally activated building envelope system that integrate PCM-based TES and the hydronic activation into building envelope, and 2) to exploit this new system to significantly reduce the energy cost of operating buildings and manage and support renewable energy sources (RES), e.g., solar and wind for the power grid reliability, quality, resilience, and dispatchability. To achieve the project objectives, a new low-cost, fire-retardant PCM packaging technology (CenoPCM) was developed specifically for high-volume building applications.

25 ENERGY STORAGE

Architectural Approaches for Integrating ADMS and DERMS: Challenges, Comparisons, and Real-World Use Cases

The electrical distribution landscape is rapidly transforming due to the proliferation of distributed energy resources (DERs) such as solar panels, wind turbines, battery storage systems, combined heat and power units, and electric vehicles, introducing variability and uncontrollability that traditional grid operators are ill-equipped to manage. This transformation is further accelerated by advancements in Information and Communication Technology infrastructure that connects control centers with end devices, demanding automation and a deeper understanding of new technologies by utility personnel. Advanced grid control techniques using system-level optimization, Artificial Intelligence, and Machine Learning at the enterprise level and distributed level are evolving to address these issues. There is also an opportunity to utilize the enormous data created by these new DER technologies in the grid. Advanced Distribution Management Systems (ADMS) and Distributed Energy Resource Management Systems (DERMS) are critical in addressing these challenges by automating grid operations and enhancing reliability. Given the relatively recent development of ADMS and DERMS, and the still relatively low level of ADMS and DERMS deployment in the industry, there is a notable deficiency in the comprehensive understanding of the challenges and benefits associated with these new technologies, especially with their complementary natures and integration architectures. This paper aims to bridge the knowledge gap in ADMS and DERMS integration, presenting three distinct integration architectures currently available, and discussing the challenges and benefits of each architecture to guide utilities, industry professionals, and researchers in optimizing grid management and decision-making processes for a resilient and efficient energy future.

24 POWER TRANSMISSION AND DISTRIBUTION

An end-to-end workflow for executing a classically bootstrapped variational quantum algorithm on an academic quantum computer

Academic quantum computing platforms often face unique challenges in executing quantum workloads due to fragmented software environments and limited engineering support. Unlike commercial ecosystems, academic devices typically evolve without full-stack integration in mind, making it difficult to run complex applications—such as variational quantum algorithms (VQA)—reliably and efficiently. Issues such as incompatible software layers and lack of automated job management significantly increase the overhead of theory-experiment collaboration. To address these challenges, we develop a modular, end-to-end workflow that decouples application-layer code from low-level hardware control, automates circuit submission and result collection, and supports fine-grained circuit-level job scheduling and recovery. The architecture employs a dual-end application programming interface (API) design, enabling robust operation across unstable or resource-constrained hardware backends. For practical use, the framework is lightweight and user-friendly, allowing rapid prototyping of full-stack workflows using basic Python tools. We validate this workflow on a high-fidelity trapped-ion quantum computer by demonstrating a variational quantum eigensolver (VQE) experiment with a classically bootstrapped ansatz initialization technique. The system successfully executed over 60,000 circuits across multiple molecular test cases with minimal human intervention, highlighting the framework’s effectiveness in enabling reproducible, resilient quantum experimentation in academic settings.

Clifford

Application of artificial intelligence methods in the international roughness index prediction of rigid and composite pavements: a systematic review

The International Roughness Index (IRI) is a widely adopted metric for quantifying pavement roughness, directly influencing vehicle safety, ride comfort, and overall roadway performance. In recent years, the use of Machine Learning (ML) models for IRI prediction has gained momentum, with the goal of improving the allocation of maintenance and rehabilitation resources by enabling accurate assessments of pavement conditions. Most prior reviews, however, have concentrated on flexible pavements, leaving a notable gap regarding rigid and composite pavements. To address this gap, the present study conducts a systematic review of Artificial Intelligence (AI) methods applied to IRI prediction for rigid and composite pavements. Literature published between 2004 and 2025 is synthesized to highlight prevailing trends, methodological contributions, and directions for future research. Particular attention is given to the types of models employed, the datasets used for training and validation, and the role of input variables and data-processing strategies. Across the included studies, ensemble learning methods (especially gradient boosting variants such as XGBoost), artificial neural networks, and hybrid architectures frequently achieved high predictive skill, with several models reporting test-set coefficients of determination approaching 0.9–0.96, indicating strong potential for capturing the influence of traffic, pavement structure, and climatic factors. Since these results are obtained from heterogeneous datasets and evaluation protocols, they are interpreted qualitatively rather than as strict cross-study rankings. Analysis of input variables revealed that pavement age and initial IRI were included in 91% (21 of 23) and 78% (18 of 23) of studies, respectively. Climatic variables such as the freezing index appeared in 57% (13 of 23), while traffic-related factors were considered in 65% (15 of 23). The findings underscore the importance of standardized, high-quality datasets, such as those from the Long-Term Pavement Performance (LTPP) program, along with data consistency, model interpretability, computational efficiency, and replicability in enhancing IRI prediction. Future research should focus on incorporating input variable selection techniques to identify the most influential predictors, thereby improving accuracy and robustness. Integrating these approaches with advanced non-linear data-driven models, coupled with robust hyperparameter optimization, holds considerable promise for strengthening the reliability of IRI prediction and supporting resilient pavement management strategies.

42 ENGINEERING

Toward integrating high-fidelity CFD approaches in the thermal-hydraulic analysis of turbulent dry cask systems

Nuclear power plants have been supplying resilient and reliable electricity for decades, contributing to energy independence of the U.S.. However, nuclear waste management remains one of the most significant challenges in the industry. The safety of dry cask storage systems relies heavily on their thermal-hydraulic performance. Computational Fluid Dynamics (CFD) simulations are often used to demonstrate this performance and ensure that the system design meets safety standards. This study presents reduced numerical models for various types of dry cask systems. These numerical models can produce efficient and fast results based on the employed modeling strategies. Additionally, the study uses a novel approach to high-fidelity simulations to evaluate modeling assumptions in dry cask modeling. Large Eddy Simulations (LES) are used for this purpose, particularly in regions where fluid velocity is relatively high and the turbulence characteristics become important. Furthermore, the results of these high-fidelity simulations will enhance the interpretation of outcomes produced from a lower-fidelity CFD model.

CFD