Environmental Air Monitoring at LANL
Presentation evaluating radiological impacts of LANL operations on members of the public
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Presentation evaluating radiological impacts of LANL operations on members of the public
A monitored exhaust system has been designed for use in venting the Flanged Tritium Waste Containers (FTWCs) at LANL. This system will provide controlled exhaust and emissions monitoring for the FTWCs, and also provide general area exhaust around the venting operations to measure any emissions which may bypass the primary vent system. A full description of the process and need for the system is described in the Pre-Construction Application for this project. This document describes the commissioning testing performed on the FTWC vent system to prepare it for use. The system has been tested and shown to meet ANSI standard requirements and is fully suitable for use.
This paper is intended to document the theory and methods to determine the actual flow rate in the exhaust system used to ventilate the Flanged Tritium Waste Containers based on realtime instrument readings. Section 1 provides introductory and background material; Section 2 details the various correction factors used to adjust flow readings for ambient air pressure and temperature and other operational parameters. Section 3 provides guidance on implementing this process during venting operations, and Section 4 provides supporting documentation and also a field checklist that can be used by personnel during venting. For Revision 1, a summary of editorial changes made to the paper was added as Section 4.4, as well as a section documenting peer review (Section 4.5).
This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.
In June 2020, Los Alamos National Laboratory (LANL) submitted letter ESHQSS: 20-025 to Region 6 of the Unites States Environmental Protection Agency (EPA). This letter transmitted the 2019 LANL Radionuclide Air Emissions Report to the EPA. This report summarizes LANL operations, air emissions of radionuclides, and subsequent off-site dose consequence from these emissions for calendar year 2019. This report is issued to meet requirements of 40 CFR 61 Subpart H, National Emission Standards for Emissions of Radionuclides other than Radon from Department of Energy Facilities. This regulation, called the Radionuclide NESHAP, establishes a limit of 10 millirem per year to the maximally exposed member of the public and requires an annual report to be submitted to the appropriate EPA Region by June 30th of each year. LANL’s off-site dose from airborne emissions of radionuclides in 2019 was 0.43 millirem. The normal practice is to issue this report directly to EPA Region 6 in June of each year, and then after the report is accepted by the EPA, re-issue the report for inclusion in the LANL Electronic Public Reading Room (EPRR). This second part is usually done in July of each year, but this step was overlooked in July 2020 due to other commitments. We regret this error. This omission was noted in late 2020; we are submitting the 2019 LANL Radionuclide Air Emissions Report to the EPRR now in December 2020. Aside from the addition of this cover sheet explaining the delay, the report is unchanged from the version submitted to EPA Region 6 in June.
Los Alamos National Laboratory’s (LANL’s) compliance with Radionuclide NESHAP 1 regulations is managed by the Radionuclide Air Emissions Management (RAEM) team, part of LANL’s Compliance Programs group (EPC-CP). One area of the Radionuclide NESHAP addresses requirements for siting a stack sample system. This memo documents the most recent performance tests of the sulfur hexafluoride detectors for use in stack gas mixing tests, as well as the functional trending test on a pair of optical particle counters, comparing results from a non-calibrated instrument to a calibrated instrument.
Enclosed is the Calendar Year 2020 Radionuclide Air Emissions Report for the Los Alamos National Laboratory (LANL). The submittal is in compliance with 40 CFR 61 Subpart H. The highest effective dose equivalent to any member of the public from LANL operations in 2020 is 0.29 millirem. This maximally exposed individual location is a business at 132 DP Road, Los Alamos, NM. The annual dose is well below the EPA standard of 10 millirem per year as established in Subpart H.
Provided is a revision to the Calendar Year 2021 Radionuclide Air Emissions Report for the Los Alamos National Laboratory (LANL). This report is a regulatory compliance deliverable for LANL under the Radionuclide NESHAP, 40 CFR 61 Subpart H. The revised report is needed to correct an error identified regarding generation of wind data files. These wind data files are used for plume modeling as part of calculating off-sites doses from monitored radionuclide air emissions sources. The error resulted from a software update by LANL’s meteorology team after new towers were added to the tower network. As a result of this error, incorrect wind frequencies were assigned to the different stability classes. This slightly affected the plume model calculations and subsequent off-site dose determinations for analyses using these wind files.
This Environmental Protection and Compliance (EPC), Compliance Programs (CP) Quality Procedure (QP) describes the process for review and evaluation of new and modified sources of radioactive air emissions to determine the requirements for pre-construction approval, stack monitoring, stack sampling system upgrade, ambient air monitoring, and the implementation of As Low As Reasonably Achievable (ALARA) principles. These requirements are specified in 40 CFR 61 Subpart H and by DOE Order 458.1, Radiation Protection of the Public and the Environment.
The purpose of this study was to compare the projected dose using different plume models, evaluating a short duration release of tritium to the 16 compliance sectors and 4 additional points of interest using local meteorology. This report is written as guidance to the decision makers when reviewing this specific Gaussian plume model intended for radiological dose assessment and regulatory compliance, called CAP88 1 , as compared to a more-complex model designed for emergency response. The emergency response model, NARAC 2 , can be used to supplement the CAP88 compliance model evaluations, since NARAC is intended for use in situations where releases are shorter in duration and have increased complexity in terrain and meteorology.
In September 2025, pressure mitigation operations began on the four Flanged Tritium Waste Containers (FTWCs) that had been in storage at Los Alamos National Laboratory (LANL), Technical Area (TA-) 54, Area G, Building 1028. Each FTWC was opened at TA-54 and put into a stable configuration, then containers were moved to LANL’s Weapons Engineering Tritium Facility (WETF) for further processing in preparation for shipment off-site. Over the course of 13 operational days, the project had air emissions of 123 curies of tritium (hydrogen-3). The radiological dose to the hypothetical maximally exposed individual (MEI) member of the public from these emissions was 0.012 millirem. This is well within the limits established by the Environmental Protection Agency (EPA), which allows 10 millirem per year to any member of the public. Naturally occurring background radiation in Northern New Mexico averages about 300-400 millirem per year to residents. This report is intended to briefly summarize operations that took place in September and October 2025, provide documentation of the radionuclide air emissions from these operations, and summarize the off-site dose consequence to the public that resulted from these air emissions. Informal notifications addressing these areas were made via email to the EPA and NMED throughout the project, and summaries of these data were also posted on the LANL external web site 1 for FTWC operations.
Explore the source record for details and available documents.