Interplanetary navigation and guidance study. Volume II - Technical report, October 30, 1965
Navigation and guidance requirement analyses during midcourse and orbital phases of 1975 round-trip Mars mission
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Navigation and guidance requirement analyses during midcourse and orbital phases of 1975 round-trip Mars mission
For one-way transfers between Earth and Venus, charts are obtained that show velocity, time, and angle parameters as functions of the eccentricity and semilatus rectum of the Sun-focused vehicle conic. From these curves, others are obtained that are useful in planning one-way and round-trip missions to Venus. The analysis is characterized by circular coplanar planetary orbits, successive two-body approximations, impulsive velocity changes, and circular parking orbits at 1.1 planet radii. For round trips the mission time considered ranges from 65 to 788 days, while wait time spent in the parking orbit at Venus ranges from 0 to 467 days. Individual velocity increments, one-way travel times, and departure dates are presented for round trips requiring the minimum total velocity increment. For both single-pass and orbiting Venusian probes, the time span available for launch becomes appreciable with only a small increase in velocity-increment capability above the minimum requirement. Velocity-increment increases are much more effective in reducing travel time for single-pass probes than they are for orbiting probes. Round trips composed of a direct route along an ellipse tangent to Earth's orbit and an aphelion route result in the minimum total velocity increment for wait times less than 100 days and mission times ranging from 145 to 612 days. Minimum-total-velocity-increment trips may be taken along perihelion-perihelion routes for wait times ranging from 300 to 467 days. These wait times occur during missions lasting from 640 to 759 days.
The initial intent of this design project was to evaluate the existence and feasibility of a single elliptical heliocentric Earth/Mars trajectory. This trajectory was constrained to encounter Mars twice in its orbit, within a time interval of 15 to 180 Earth days between encounters. The single ellipse restriction was soon found to be prohibitive for reasons shown later. Therefore, the approach taken in the design of the round-trip mission to Mars was to construct single-leg trajectories which connected two planets on two prescribed dates. Three methods of trajectory design were developed. Method 1 is an eclectic approach and employs Gaussian Orbit Determination (Method 1A) and Lambert-Euler Preliminary Orbit Determination (Method 1B) in conjunction with each other. Method 2 is an additional version of Lambert's Solution to orbit determination, and both a coplanar and a noncoplanar solution were developed within Method 2. In each of these methods, the fundamental variables are two position vectors and the time between the position vectors. In all methods, the motion was considered Keplerian motion and the reference frame origin was located at the sun. Perturbative effects were not considered in Method 1. The feasibility study of round-trip Earth/Mars trajectories maintains generality by considering only heliocentric trajectory parameters and planetary approach conditions. The coordinates and velocity components of the planets, for the standard epoch J2000, were computed from an approximate set of osculating elements by the procedure outlined in an ephemeris of coordinates.
The recent discovery of the Amor-class 1989 ML, the most accessible known asteroid for minimum-energy rendezvous missions, has expedited the search for frequent, low-cost Near-Earth Asteroid rendezvous and round-trip missions. This paper identifies trajectory characteristics and assesses mass performance for low Delta V ballistic rendezvous opportunities to 1989 ML during the period 1996-2010. This asteroid also offers occasional unique extended mission opportunities, such as the lowest known Delta V requirement for any asteroid sample return mission as well as pre-rendezvous asteroid flyby and post-rendezvous comet flyby opportunities requiring less than 5.25 km/sec total Delta V. This paper also briefly comments concerning mission opportunities for asteroid 1991 JW, which recently replaced other known asteroids as the most accessible Near-Earth Asteroid for fast rendezvous and round-trip missions.
A simple family of indirect-transfer trajectories between circular orbits is used to evaluate the mass ratio required to complete round-trip interplanetary missions using low-thrust propulsion systems. These trajectories, although not optimum, yielded very substantial reductions in total round-trip time for Mars missions with moderate increases in initial weight. For a powerplant specific weight a of 10 pounds per kilowatt of jet power, trip times were reduced from 1200 to 600 days, for a typical manned mission, with an initial weight increase of a factor of two. Comparison with a nuclear rocket with 1000-second specific impulse indicated that the electric-propulsion system required less initial weight for trip times as low as 550 days with alpha equal to 10 and as low as 400 days with alpha equal to 5 pounds per kilowatt. Further weight reductions would be expected with more nearly optimum trajectories.
A simple family of indirect transfer trajectories between circular orbits is used to evaluate the mass ratio required to complete round-trip interplanetary missions using low-thrust propulsion systems. The results indicate that indirect interplanetary trajectories yield substantial reductions in total round-trip time for low-thrust as well as high-thrust vehicles, and that space vehicles propelled with electric rockets may produce greater reductions in trip time, for a given initial weight, than those propelled by high-thrust nuclear rockets.
Conventional mission planning for piloted flights to Mars has been confined to comparing the round-trip energy and flight time requirements of several trajectory classes. This paper addresses these trades in the context of acceptable operational flight characteristics including abort considerations and crew exposure to the interplanetary environment. Quantitative estimates of crew radiation exposure, both during transit and on the surface of Mars, are made and compared to established NASA standards. Time periods spent in zero-gravity during mission transit legs for the various mission options are compared, along with the recovery times in the Mars gravity field. Finally, an integrated mission/abort strategy is proposed, consistent with the expected performance of first-generation nuclear propulsion systems.
Mars Mission profile options and mission requirements data are presented for earth-Mars opposition and conjunction class round-trip flyby and stopover mission opportunities. The opposition-class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition-class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition-class mission. The conjunction-class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low earth orbit to one mission profile option and mission opportunity to another.
Mars Mission profile options and mission requirements data are presented for Earth-Mars opposition and conjunction class round-trip flyby and stopover mission opportunities. The opposition class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition class mission. The conjunction class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low Earth orbit to one mission profile option and mission opportunity to another.
Mars Mission profile options and mission requirements data are presented for earth-Mars opposition and conjuction class round-trip flyby and stopover mission opportunities. The opposition class flyby and sprint mission uses direct transfer trajectories to and on return from Mars. The opposition-class stopover mission employs the gravitational field of Venus to accelerate the space vehicle on either the outbound or inbound leg in order to reduce the propulsion requirement associated with the opposition-class mission. The conjuction-class mission minimizes propulsion requirements by optimizing the stopover time at Mars. Representative interplanetary space vehicle systems are sized to compare and show sensitivity of the initial mass required in low earth orbit to one mission profile option and mission opportunity to another.
In the Gravity Well Revenue Study, we evaluate the potential revenue from energy storage using historical energy-only electricity prices, forward-looking projections of hourly electricity prices, and actual reported revenue. This analysis examines the impact of storage duration and round-trip efficiency, as well as the location of the storage, on storage revenue within the current and projected U.S. power system. We also investigated the impact of round-trip efficiency on storage revenue. We found that the relationship between storage revenue and round-trip efficiency is nonlinear. The value of improved round-trip efficiency declines as round-trip efficiency increases. In the Gravity Well Future Cost Study, we applied learning curves to predict the future cost trajectory of Gravity Wells (GrWs). Two types of analysis were implemented. The first was a bottom-up analysis that used historical learning rates for cost components, such as motors and gearboxes, and cost categories (e.g., engineering and design, etc.) to determine the learning-by-doing based single-factor learning curve. The single factor learning curve expresses the relationship between the cost of GrW and the number of units deployed (or the cumulative capacity). In the second analysis, we predicted future GrW costs via a top-down approach. This approach accounts for historical cost trends in other renewable energy and storage technologies, which have similarities with GrWs. Using a multifactor learning curve that accounts for both intrinsic (cumulative capacity) and extrinsic (the elasticity in the price of steel) factors, we estimated the future cost of GrWs.
The use of libration points as transfer nodes for an Earth-Mars transportation system is briefly described. It is assumed that a reusable Interplanetary Shuttle Vehicle (ISV) operates between the libration point and Mars orbit. Propellant for the round-trip journey to Mars and other supplies would be carried from low Earth orbit (LEO) to the ISV by additional shuttle vehicles. Different types of trajectories between LEO and libration points are presented, and approximate delta-V estimates for these transfers are given. The possible use of lunar gravity-assist maneuvers is also discussed.
This paper describes the basic characteristics of circulating (cyclical) orbit design as applied to round-trip transportation of crew and materials between earth and Mars in support of a sustained manned Mars Surface Base. The two main types of nonstopover circulating trajectories are the socalled VISIT orbits and the Up/Down Escalator orbits. Access to the large transportation facilities placed in these orbits is by way of taxi vehicles using hyperbolic rendezvous techniques during the successive encounters with earth and Mars. Specific examples of real trajectory data are presented in explanation of flight times, encounter frequency, hyperbolic velocities, closest approach distances, and Delta V maneuver requirements in both interplanetary and planetocentric space.
The study examines how the mission design variables departure energy, entry speed, and trip time vary for round-trip conjunction-class Mars missions. These three parameters must be balanced in order to produce a mission that is acceptable in terms of mass, cost, and risk. For the analysis, a simple, massless- planet trajectory program was employed. The premise of this work is that if the trans-Mars and trans-Earth injection stages are designed for the most stringent opportunity in the energy cycle, then there is extra energy capability in the "easier" opportunities which can be used to decrease the planetary entry speed, or shorten the trip time. Both of these effects are desirable for a human exploration program.
A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.
The paper investigates a continuous round-trip radio link at S band (2.2 GHz) that was maintained during the Pioneer Saturn encounter between stations of the Deep Space Network and the spacecraft. From an analysis of the Doppler shift in the radio carrier frequency, a number of gravitational effects on the trajectory were determined. Gravitational moments for Saturn were found from a preliminary analysis, as well as mass values for the Saturn satellites Rhea, Iapetus, and Titan. It was determined that the densities of all three satellites are low and consistent with the compositions of ices. Theoretical calculations for the Saturn interior are described which use the latest observational data, including Pioneer Saturn and state-of-the-art physics for the internal composition.
An aerobraking orbital transfer vehicle (AOTV) concept, which has an aerobrake structure that is integrated with the propulsion stage, is discussed. The concept vehicle is to be assembled in space and is space-based. The advantages of aeroassist over an all propulsive vehicle are discussed and it is shown that the vehicle considered is very competitive with inflatable and deployable concepts from mass and performance aspects. The aerobrake geometry is an ellipsoidally blunted, raked-off, elliptical wide-angle cone with a toroidal skirt. Propellant tanks, engines, and subsystems are integrated into a closed, isogrid aerobrake structure which provides rigidity. The vehicle has two side-firing, gimbaled RL-10 type engines and carries 38,000 kg of useable propellant. The trajectory during aerobraking is determined from an adaptive guidance logic, and the heating is determined from engineering correlations as well as 3-D Navier-Stokes solutions. The AOTV is capable of placing 13,500 kg payload into geosynchronous Earth orbit (GEO) or carrying a LEO-GEO-LEO round-trip payload of 7100 kg. A two-stage version considered for lunar missions results in a lunar surface delivery capability of 18,000 kg or a round-trip capability of 6800 kg with 3860 kg delivery-only capability.
The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.