Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Development of Plant Reload Optimization Framework Capabilities for Core Design and Fuel Performance Analysis

The United States (U.S.) nuclear industry faces a challenge in maintaining required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects of light water reactor (LWR) nuclear power plant (NPP) operations. Safety can become more economical by using a risk-informed ecosystem, such as the one being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program promotes a wide range of research and development activities with the goal of maximizing both the safety and economic efficiency of NPPs through improved scientific understanding, especially given many plants are now considering second license renewals. The RISA Pathway has two main goals: (1) deploy methodologies and technologies that better represent safety margins and cost and safety factors and (2) develop advanced applications that enable cost-effective plant operation. The Plant Reload Optimization Platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses, and also uses artificial intelligence to support optimization of core design solutions. This report summarizes Fiscal Year 2022 (FY-22) activity in platform capability developments in RAVEN. This platform performs simulations using industry codes for core design (i.e., PARCS) and fuel performance (i.e., TRANSURANUS) which will allow expansion of the capabilities to include advanced fuel designs such as accident-tolerant fuel (ATF)s with high burnup.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration of the Plant Fuel Reload Process Optimization for an Operating PWR

The United States (U.S.) nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor (LWR) nuclear power plants (NPPs) and can be achieved more economically by using a risk-informed ecosystem such as that being developed by the Risk-Informed Systems Analysis (RISA) Pathway under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program. The LWRS Program is promoting a wide range of research and development (R&D) activities with the goal to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering second license renewal. The RISA Pathway has two main goals: (1) the deployment of methodologies and technologies that enable better representation of safety margins and the factors that contribute to cost and safety; and (2) the development of advanced applications that enable cost-effective plant operation. This report summarizes the research outcomes in FY-2021, which the project progressed from the planning and methodology development phase to the early demonstration phase. The highlights of these activities are: (1) the development of a multi-objective optimization process using Genetic Algorithms (GAs); (2) the development and test of an approach for optimization process acceleration using artificial intelligence (AI) that significantly reduces the computational burden; (3) the demonstration of the fuel reload optimization framework for a generic pressurized water reactor (PWR); and (4) the demonstration of limiting design basis accident (DBA) scenarios for evaluation of the transition from deterministic to risk-informed approach for fuel reload optimization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Advancement and Application

This report documents activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2024 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, Digital Instrumentation and Control (DI&C) Risk Assessment project. The goal of the RISA Pathway is to optimize safety margins and minimize uncertainties to achieve economic efficiencies while maintaining high levels of safety. This is accomplished by providing scientific basis to better represent safety margins and factors that contribute to cost and safety, and by developing new technologies that reduce operating costs. The research efforts for FY 2024 encompass methodology refinement and exploration. The efforts include: (1) The implementation of a natural language processing tool to expedite key aspects of the reliability analysis methods developed by INL; (2) advances to support intersystem CCF analysis by providing guidance for and identification of coupling mechanisms that may contribute to CCF; (3) the investigation of how generative artificial intelligence tools can aid in hazard analysis and diversity and defense in depth (i.e., D3) assessments; (4) Industry collaboration, allowing the demonstration of and INL's risk assessment tools to support risk assessment of DI&C systems at early and late stages of development; (4) a roadmap for the development of a software for each of INL's risk assessment tools; (5) The development of a theory and methodology manual for a risk quantification methodology; (6) the development of a reliability analysis for machine learning (ML)-integrated control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

Inventory and Probabilistic Function of Natural Hazards in the United States: July 19, 2018 - September 18, 2018

The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a standardized risk assessment process that considers the location-specific vulnerabilities and threats (climate-related as well as human-caused) at a site to generate a ranked list of organizational risks and associated mitigation options for reducing those risks. To support this effort, the Southern Climate Impacts Planning Program (SCIPP), a National Oceanic and Atmospheric (NOAA) Regional Integrated Sciences and Assessments (RISA) team, was selected to provide climate science expertise to develop a comprehensive inventory and probabilistic function of natural hazards (e.g., hurricanes, tornadoes, flooding, and sea level rise) for the entire United States by region. The inventory of climate-related hazards and the associated likelihood scores are incorporated into a companion risk assessment tool enabling standardized comparisons of risk at sites across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk-Informed Safety Analysis for Accident Tolerant Fuels

Accident Tolerant Fuels (ATF) are being tested by different nuclear vendors and research organization and their introduction in light water reactors fleet is planned for the second half of the 2020`s. In the framework of the US-DOE Light-Water Reactor Sustainability program, Risk-Informed Safety Analysis pathway (LWRS-RISA), research activities are being conducted at the Idaho National Laboratory (INL) for developing tools and methods that can help the industry in quantifying the ATF introduction benefits. In this paper we describe the developed risk-informed methodology, the codes improvements and we present some results for selected accidental conditions. The developed methodology combines INL state-of-the-art deterministic Best Estimate tools like RELAP5-3D code, and Probabilistic Risk Analysis tools like RAVEN and SAPHIRE codes. The analyses are performed on a three-loops pressurized water reactor (PWR) simulating accidental conditions like Station Blackout and LB-LOCA and considering near-term ATF (FeCrAl and Chromium-coated clads). Finally, we show, through our methodologies, how the delta-Core Damage Frequency can be assessed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of the Benefits of ATF, FLEX, and Passive Cooling System for an Enhanced Resilient PWR Model

This report, along with report INL/EXT-19-53556, documents the activities performed by Idaho National Laboratory (INL) during the fiscal year (FY) 2019 for the DOE Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. This report includes additional accident scenarios for risk-informed ATF analysis, and examines the risk impacts of FLEX and passive cooling system on nuclear power plants (NPPs) from additional perspectives. The same analysis process, risk analysis approaches, and analysis tools as in FY 2018 were used for near-term ATF cladding (i.e., Iron-Chromium-Aluminum [FeCrAl] cladding and Chromium [Cr]-coated cladding) designs under the small break loss-of-coolant accident (SBLOCA) scenarios, two types of general transient scenarios (locked rotor and turbine trip), and main steam line break (MSLB) scenarios. Benchmark calculations for ATF analysis using RELAP5-3D and MELCOR are also presented. In addition, based on the generic probabilistic risk assessment (PRA) model, the risk impacts of FLEX and the dynamic natural convection (DNC) system on NPPs are evaluated through a risk-informed decision-making process, i.e., significance determination process (SDP).

99 GENERAL AND MISCELLANEOUS↗

Tools And Methods to Analyze Plant Outage Schedule and Assist Schedulers in Improving Outage Resilience

Refueling outages of nuclear power plants (NPPs) are considered one of the most critical phases throughout the plant lifetime. In such instances, tens of thousands of activities (e.g., maintenance, surveillance) are performed in a short amount of time (typically 2-3 weeks unless major backfitting or modernization projects are carried out) by a large number of crews (e.g., electricians, mechanics) that are hired as contractors. As a consequence, a plant outage can be expensive not only in terms of costs (e.g., contractor labor, material), but also in terms of loss generation since the plant is taken off the grid during the full outage duration (an indicative metric is about 1.2M$/day of loss of revenue). Thus, there is a continuous need to decrease the economic impact of outages on plant finances. This can be done by: decreasing the frequency of plant outages (e.g., from 18 to 24 months), reducing the time to complete the outage, and reducing the risk of outage delays. The Optimization of Outage Activities project under the Risk Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program focuses on developing tools and methods to support NPPs with outage schedule optimization. The developed tools and methods are designed to analyze plant outage schedule with the goal of identify critical elements in the schedule that might pose a high risk of delays. These methods and tools can be considered resource-centric in the sense that they address outage challenges as a resource optimization problem. In this context, resources are either time and crews; outage delays occurs when either (or both) resources are insufficient to complete the set of tasks assigned at a specific time instant of the outage. This report provides details on how plant resources (time and crews) can be allocated in such a way that delays are minimized. In this respect, two classes of methods have been developed: the first one focuses on the time resource and how variability of the time to complete outage tasks may impact outage delays. The second one integrates available resources to assess when dailies activities should be performed such that the risk of outage delays are minimized.

97 MATHEMATICS AND COMPUTING↗

Participatory Climate Research in a Dynamic Urban Context: Activities of the Consortium for Climate Risk in the Urban Northeast (CCRUN)

The Consortium for Climate Risk in the Urban Northeast (CCRUN), one of ten NOAA-RISAs, supports resilience efforts in the urban corridor stretching from Philadelphia to Boston. Challenges and opportunities include the diverse set of needs in broad urban contexts, as well as the integration of interdisciplinary perspectives. CCRUN is addressing these challenges through strategies including: 1) the development of an integrated project framework, 2) stakeholder surveys, 3) leveraging extreme weather events as focusing opportunities, and 4) a seminar series that enables scientists and stakeholders to partner. While recognizing that the most extreme weather events will always lead to surprises (even with sound planning), CCRUN endeavors to remain flexible by facilitating place-based research in an interdisciplinary context.

extreme events↗

Multicriterion Benefit Evaluation of Deploying New Battery Technology with Increased Capacity at a Generic Nuclear Power Plant

This presentation is prepared for the DOE LWRS RISA Pathway Stakeholder Engagement Meeting on October 13-14, 2021. Nuclear power plant (NPP) safety improvements are routinely made by plant licensees and regulators. Examples of plant improvements include accident-tolerant fuel, diverse and flexible coping strategies, passive cooling systems, and increased battery capacity. A combined use of these plant improvements could lead to plant designs with enhanced resilience, allowing NPPs to better cope with both internal and external hazards and keep the plant operating safely, efficiently, and economically. This presentation focuses on increased battery capacity and evaluates the potential costs and benefits of deploying batteries with increased capacities at a generic boiling water reactor (BWR) NPP. A multicriterion benefit evaluation methodology is used for the cost-benefit analysis. Ten alternatives for extending battery capacity are developed, including eight alternatives to provide additional direct-current power and one alternative to provide additional alternating-current power. Potential benefits of reducing plant risk are quantified through incorporating the alternatives into loss-of-offsite-power scenarios of the generic BWR probabilistic risk assessment model. Potential costs of implementing the alternatives are qualitatively discussed and ranked. The alternatives are then compared based on their impacts on plant risk and economics.

99 GENERAL AND MISCELLANEOUS↗

Pressurized-Water Reactor Core Design using Multi-Objective Plant Fuel Reload Optimization Platform

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program Risk-Informed Systems Analysis (RISA) Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimization of core design. The optimization of the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible options of core configuration, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization (PRLO) platform which supports artificial-intelligence-based reactor core designing is now fully capable of handling realistic problems. The PRLO Platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm-II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual Environment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multi-objective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

42 ENGINEERING↗