The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Study of TRR Radial Thermal Shielding Dismantling Process - 20063

The decommissioning of nuclear facilities has become an important worldwide topic because many nuclear power facilities will permanently cease operation in the foreseeable future. Taiwan Research Reactor (TRR) has stepped into the decommissioning phase in 2004, and the dismantling processes will start in 2022. TRR is a heavy water reactor designed by Canatom Company with output thermal power 40 MW. On January 3, 1973, it reaches criticality. TRR had been operated for 15 years and was permanently shut down in early 1988. The decommissioning plan of TRR was approved in 2004. According to the Nuclear Reactor Facilities Regulation Act in Taiwan, a nuclear facility must be dismantled in 25 years after stepping into the decommissioning phase. Therefore, TRR decommissioning must be completed before 2029. One of the most important tasks of TRR decommissioning is to dismantle reactor body. In the task of TRR decommissioning, mechanical cutting with remote handling is used to dismantle radial thermal shielding, which are the internal components of the TRR. This study outlines the internal components of the TRR and explains the difficulties encountered during the dismantling processes. Considering the structure and radiation dose rate of TRR and its internal components, the dismantling method and packaging method are properly arranged to complete the TRR dismantling task. This study describes the process of dismantling the radial thermal shielding during the dismantling processes and considers the impact of the radiation dose on the staff during the operation. The calculation of the radiation dose rate for the personnel during the segmentation process is based on the evaluation result by using VRdose. If the calculation of personnel working dose rate is too high, we will increase the shielding or use remote handling to reduce the operator's exposure dose in the dismantling processes to comply with the As Low As Reasonably Achievable (ALARA) principle. In this study, the latest developments in the TRR decommissioning program are described. It also provides usable experience and information regarding the future decommissioning of other nuclear facilities or nuclear power plants in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Second Target Station Target Segment Removal Dose Rates

This report documents the analysis of the dose rate fields in two configurations of the target system of the Second Target Station (STS) at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) in support of the remote handling target segment removal operation. The two configurations detailed in this report are both assuming 8 hours since beam was incident on the target. The first configuration assumes all shielding is in place just as it was during operation and allows for confirmation of hands-on maintenance capability of the target drive components. The second configuration assumes that a hatch in the target drive room ceiling has been opened to the high bay, the target segment removable core vessel shield block has been removed, and there is a direct line-of-sight to the target segment some 5 m below the target drive room elevation. Dose rate fields in both configurations are documented in this report along with details of the methods of computation. The dose rate fields included in this report are intended to support the engineering of remote handling special equipment and the planning of remote handing operations. The models and analysis detailed in this report are in support of the preliminary design of the STS and future analysis is needed to support the final design of the STS.

61 RADIATION PROTECTION AND DOSIMETRY↗

Modeling and Analysis of the Transport and Disposal of Beryllium Moderator Blocks and Greater than Class C (GTCC) Waste

Radioactive waste in the United states is categorized based on its source, radioactivity, and security risk. The categorization method employed by the Nuclear Regulatory Committee (NRC) for low-level radioactive waste is not currently applied to any waste generated by the Department of Energy (DOE) or disposed of in DOE facilities. As a result, there is a large volume of DOE-generated waste with characteristics similar to the NRC’s “Greater than Class C” (GTCC) waste category which presently do not have a path for long-term disposal. Much of this waste cannot undergo the standard commercial disposition process due to it being categorized as Transuranic (TRU) waste under DOE guidelines, due to elevated concentrations of key fission products. Possible solutions to this dilemma are explored in the Environmental Impact Statement for the “Disposal of Greater-Than-Class-C Low Level Radioactive Wave” (EIS-0375). This paper analyzes several EIS possible paths for disposal for this “orphaned” waste. One example that highlights this categorization issue is the spent beryllium cladding that has been extracted from the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) throughout its operational lifetime. These beryllium blocks surround the reactor’s main chambers and components and serve as neutron moderators. This paper will use this particular waste form to analyze the economic and technological viability of transporting and storing this material under the storage and transportation criteria of the Waste isolation Pilot Plant (WIPP), which was deemed the most feasible disposition path according to the EIS. The example of this waste form used in this paper that highlights this categorization issue is the spent beryllium cladding extracted from Idaho National Laboratory’s (INL) Advanced Test Reactor (ATR). These beryllium blocks surround the reactor’s components and serve as neutron moderators, and thus have accumulated high concentration of high-activity transuranic isotopes. This paper analyzed the viability of transporting and storing this material under the storage and transportation criteria of the five primary disposition paths covered in EIS-0375. An array of calculations was carried out to assess the viability of the various disposition paths for the beryllium shipments as well as other waste shipments that fall within the GTCC category. Modeling with MCNP 6.2 was conducted to determine whether the beryllium blocks could be safely stored and transported within a 72-B cask; the standard shipping container for remote-handled, transuranic waste, while also meeting regulatory limits at various disposition paths. A cost analysis of the transportation and long-term disposal paths mentioned in the EIS was also carried out using available data and information from similar waste shipments. Lastly, a geochemical analysis of the various geological repository discussed in the EIS was also carried out using the Geochemists Workbench Release 14. Long-term disposal of the beryllium blocks at the Waste Isolation Pilot Plant (WIPP) proved to be the most cost-effective long-term disposition option of the ones considered in the EIS. A dose rate calculation at both contact and remote-handling distances indicate that the analyzed beryllium shipments should not exceed the exposure limits at any of the considered locations. Greater-than-class-C waste has been left in a regulatory state of limbo for years, resulting in backlogs of inventory across several research sites in the United States. Due to its high activity and presence of transuranic isotopes, it is imperative to ensure that it remains inaccessible and sequestered both in its short-term interim as well as a long-term geologic time scale. The information and assessments done in the paper could potentially serve as a reference for any future shipments of this waste form at the WIPP facility as well as other disposition paths that may be considered in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decay Dose Shielding Analysis with Hybrid Unstructured Mesh/Constructive Solid Geometry Monte Carlo Calculation and ADVANTG Acceleration

Here, the target segments of the Oak Ridge National Laboratory Second Target Station (STS) neutron production facility become highly activated due to spallation reactions or nuclei transmutation by primary protons and emitted neutrons. Once the target segments are removed from their location within the core vessel, decay dose rates must be accurately quantified to determine the shielding configurations of remote-handling tools and transport casks and to aid in planning maintenance activities. For this analysis, we utilized a hybrid unstructured mesh (UM)/constructive solid geometry approach for calculating spallation products and neutron fluxes, activation calculations using the AARE package that includes the CINDER2008 activation code to calculate the decay photon source at different cooling times, and the ADVANTG code to accelerate the final decay photon transport calculation. Both Type 316 stainless steel (SS-316) and lead were investigated as candidates for shielding materials. The decay photon transport calculation through the thick SS-316 or lead shields exhibited between 25 and 30 orders-of-magnitude attenuations in the radial direction, depending on the shield. Such a difficult shielding calculation required advanced variance reduction. ADVANTG has some missing features, which limits its usability in spallation neutron source applications. It does not support volumetric sources created for MCNP6.2 UM capability. An approximate source was created for this problem. Not only was this approximate source needed for running the ADVANTG calculation to generate the weight windows, but also it was essential to develop source biasing (SB) parameters that were crucial for dramatically accelerating the decay photon transport in this problem. With this approximate source, the analysis was completed in a very reasonable computational time, and the design of the STS remote-handling equipment was finalized. This paper compares the efficiency of Monte Carlo simulations with different weight window and SB parameters calculated using different approximate ADVANTG calculations.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Diagnostics for Burning Plasmas

Here, recent progress in the design and manufacturing development of in-vessel diagnostic components by the U.S. ITER team is reported. Design and manufacturing choices are driven by engineering challenges stemming from ITER’s burning plasma mission, which entails levels of plasma neutron emission, pulse lengths, and size scales well beyond the existing database. Challenges include port access limitations, neutron irradiation and activation risks, nuclear heating of components, complex interfaces, remote handling compatibility, and constraints on component and processing materials. Responses to these challenges are presented using examples from the low field side reflectometer, toroidal interferometer polarimeter, and electron cyclotron emission diagnostics. Relevance of the experience from ITER diagnostics engineering to the design of future integrated fusion facilities based on burning plasmas is addressed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design of a Loss of Coolant Blowdown Capsule for Remote Assembly with High Burnup Fuel

The Transient Water Irradiation System is an enhanced capability capsule type irradiation vehicle designed to support fuel safety research for light water reactor specimens in the Transient Reactor Test Facility and is designed to simulate loss of coolant and reactivity-initiated accidents. The capsule was designed, deployed, and commissioned with fresh fuel specimens to validate instrumentation and prepare for previously irradiated high burnup specimens. The irradiation system features an extensive in-situ instrumentation package to detect phenomena typical to light water reactor fuels. To accommodate the assembly with high burnup specimens inside the Hot Fuel Examination Facility, and to ensure instrumentation integrity is maintained throughout assembly, the design was updated to support remote handling. The updated design features a hinge mechanism which allows for remote pre-irradiated specimen loading and assembly while protecting sensitive instrumentation by relocating during loading. Fixtures and equipment have been developed to handle the experiment capsule and components in cell, and to support remote assembly. The experiment module also includes radiation shielding and contamination control to support operations after removal from the hot cell.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The importance of delayed neutron precursors in gamma dose calculations for activated primary heat exchanger components in the Molten Salt Breeder Reactor

The Molten Salt Reactor (MSR) Multiphysics Applications technical area in the Nuclear Energy Advanced Modeling and Simulation program has supported the development of 3D Monte Carlo models of the Molten Salt Breeder Reactor (MSBR) over the last couple of years. This MSBR model was previously run with the Shift Monte Carlo code to perform radiation shielding calculations in the reactor cell area. The MSBR is a 2250 MWth (1000 MWe) liquid-fueled molten salt reactor design developed at Oak Ridge National Laboratory in the 1970s. Determining the source terms from activated primary heat exchanger (HX) components is important because delayed and prompt neutron fluxes incident on these components affect the dose rate in the primary HX maintenance areas. This information can be used in the development of remote handling procedures required during shutdown for maintenance. A methodology has been developed and is proposed in this paper to quantify the activated source term from the primary HX components as a result of the movement of the delayed neutron precursors in flowing primary fuel salt through the primary HXs in the MSBR. The goal of this research is to evaluate the gamma dose rates in the maintenance hatches above the primary HX using the activated HX source terms. The study showed that the gamma dose rates are approximately two orders of magnitudes higher when accounting for the neutron activation from the movement of delayed neutron precursors through the HXs than when flowing fuel is not considered. Thus, the movement of delayed neutron precursors must be taken into account for accurately predicting the neutron activation of primary loop components.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Steady-State Mechanical Analysis for Target Assembly in the Material Plasma Exposure eXperiment Facility

The Material Plasma Exposure eXperiment (MPEX) steady-state linear plasma facility is currently under design at Oak Ridge National Laboratory to expose target specimens to fusion divertor regimes. The neutron-irradiated target is actively cooled and remote handled in the MPEX facility for conducting plasma-material–interaction (PMI) experiments. Here, the steady-state stresses in the target and target assembly system are investigated using two-dimensional (2-D) and three-dimensional (3-D) models to provide expected stresses/strains under the heat loads to which various system components would be exposed during MPEX operation. The calculated temperatures from the 2-D axisymmetric mechanical model were found to be in excellent agreement with those from the full 3-D thermohydraulic model, providing a strong model validation. Numerical simulation results for the steady-state mechanical model indicate nonuniform distributions for the temperature, stress, and deformation within the critical components. For the initial design, the deformation results indicate possible gap openings between contacting surfaces below the plasma-facing materials. To reduce the possibility of interfacial gap opening, the target assembly was slightly changed and evaluated using the 2-D stress model. Numerical simulation results indicate that the interfacial gap openings can be minimized without drastically changing the entire target assembly. The stress-strain conditions for the target will be further used to assess the appropriate operation during MPEX experiments and gain insight into materials science phenomena during PMI.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.