Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Bulk Electric System Protection Model Demonstration with 2011 Southwest Blackout in DCAT

Protection equipment modeling is critical to power systems planning and operational studies, it enables more accurate system response when control actions including protection relays and remedial action schemes (RAS) are adequately modeled and assessed. This paper incorporates a generic protection philosophy to the Dynamic Contingency Analysis Tools (DCAT), and demonstrates its effectiveness by modeling 2011 Pacific Southwest Blackout event autonomously.

Bulk Electric System, Protection, Blackout, DCAT↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustaining On-going Risk Communication at the Riverton, Wyoming, Processing Site - 20310

An environmental risk assessment report has been completed to provide an updated assessment regarding current site conditions for the Riverton, Wyoming, Processing site. Argonne National Laboratory conducted the assessment in collaboration with the U.S Department of Energy (DOE) Office of Legacy Management (LM) and the Northern Arapaho Natural Resources Office (NANRO). The data quality objectives process conducted confirmed that data from plants growing on the Riverton site would be useful and would address an outstanding concern. Data available from site soil, groundwater, and surface water were also used in the assessment in conjunction with the new plant data. A plant survey was then conducted in 2018 to identify the plants at the Riverton site with known traditional Native American cultural uses for sampling and analysis. Laboratory analysis was conducted on the plant samples for the contaminants of concern. Samples were collected from plants growing on the groundwater plume area of the site, and the same was done for eight other areas not affected by the groundwater plume but still within the institutional control boundary. These eight areas served as reference areas for this study. This human health and ecological assessment update provide the quantitative risk information that was qualitatively addressed in a 1995 Risk Assessment Report on plants, livestock, and surface water exposures at the Riverton site [1]. The conditions at the Riverton site are protective of human health and the environment given the results of the update, in combination with past completed remedial action and ongoing monitoring activities and IC implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Test Bed for Vadose-Zone Monitoring Approaches - 20404

In the Central Plateau at the U.S. Department of Energy Hanford Site, a large inventory of contaminants resides in unsaturated sediments within the approximately 100-meter-thick vadose zone, posing a potential continuing risk to groundwater. Vadose zone remedies used to address these contaminants will require performance monitoring to provide feedback during implementation and for long-term verification that remedial action objectives have been met. Passive approaches may also need long-term monitoring to demonstrate that the flux of contaminants from the vadose zone to the groundwater are below thresholds established to meet groundwater protection goals. Collection of physical (e.g., groundwater or sediment) samples is a common method for identifying contaminant concentration distributions, but this approach is limited by the number of locations and the frequency with which data can be collected. In situ vadose zone measurements have evolved over the past few years to include key measurements of water content, soil water pressure, temperature, and chemical concentration. However, the current generation of sensors is designed for relatively short-term use in near-surface soils or sediments. Geophysical methods have been evolving but are also limited in that they have not been designed for the specific long-term vadose zone monitoring needs at the Hanford Site. Overall, monitoring under unsaturated conditions can be difficult due to the need to install and maintain instrumentation over a large area and depth and the need to identify preferential flow pathways due to geologic and chemical heterogeneities over long periods. Thus, a vadose zone monitoring test bed was initiated to address these challenges and identify cost-effective approaches for implementation and postclosure monitoring of the deep vadose zone. The monitoring test bed is expected to provide valuable field-scale information for the design of vadose zone monitoring systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

End State: Vision for Future Land Use at Hanford

An end state vision is influenced by practical constraints associated with technology limitations, resource availability, costs, timing, and unintended consequences of remedial actions, and a site’s next intended use. Therefore, subsurface environmental remediation goals often need to be balanced against the risks and costs of contaminant removal versus leaving contamination in place. For example, in regions where contaminant concentrations are high but immobile, the intended site use should be evaluated in conjunction with the risk of re-mobilization with an aggressive remedy. By contrast, the technological challenges, cost, and time to reach remedial objectives of cleaning up low levels of contamination distributed over large areas in the subsurface may require different considerations for a site’s next intended use.

environmental remediation, environmental managemen↗

Applications of Hyporheic Zone Sampling for Assessing VOC Plume Engineered Remediation and Natural Attenuation Effectiveness - 20414

Determining the efficacy of engineered remedial actions and/or natural attenuation as an acceptable EPA Record of Decision (ROD) must address long-term temporal and spatial variability. Since final plume downslope destinations are aquifers and related surface streams and rivers, hyporheic zone sampling is essential. Comprehensive hyporheic sampling documents plume groundwater remediation prior to upwelling into stream benthic strata and natural attenuation within this dynamic zone itself. Our intensive sampling of the Savannah River Site (SRS) Chemical, Metals, and Pesticides (CMP) Pits VOC plume-fringe from 2005 to 2018 documented PCE natural attenuation and effectiveness of In Situ Thermal Treatment (ISTT). Most plume hyporheic upwelling was delimited to a 20 m inflow reach along Pen Branch. Our study utilized corroborative sampling methodologies: ambient hole-water grab samples: passive diffusion bags (PDB); and hole-core sediment samples to confirm station to station spatial and temporal trends. VOC hot spot detections were confirmed from both groundwater and soil core samples. VOC pathways through the Pen Branch hyporheic zone were assessed at hole-installation using sequential soil samples from augered cores and grab-samples of hole-bottom water. Longer term, composite water samples were collected from PDBs deployed for a minimum two-week equilibration period. Soil samples were collected from the 15 and 65 cm core levels in December 2017 and June 2018 at six stations. Additional core depths of 40 and 85 cm were sampled in June 2018 at the highest VOC station (5DB80). All samples were analyzed in an EPA certified lab by purge and trap GC-MS. Effectiveness of previous ISTT and soil vapor extraction (SVE) for this CMP Pits PCE plume, was clearly documented by significant downward trends in VOC at hyporheic zone stations prior to December 2015. Achieving final stage conversions of PCE daughter products to ethene and CO{sub 2} may be limited depending upon suitable interactions between hyporheic zone sediment morphology, hydrology, and redox conditions. Because declines in VOC daughter products at our hyporheic stations may also be caused by physical actions of dilution and dispersion rather than true biochemical dechlorination, full quantification of natural attenuation requires the use of compound-specific isotope ratio analysis (CSIA) and microbial 16S rRNA with qPCR. To assist these next-phase efforts, a natural attenuation index (NAI) was used to help produce quicker, more cost-effective decision making for locating CSIA and microbial sampling efforts. The NAI used natural logarithm transformed GC-MS results for station VOC degradation compounds versus VOC parent compounds. Wide differences were observed between stations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Automated Corrective Actions for Special Protection Schemes

The constantly evolving nature of the grid is compelling the design process of Remedial Action Schemes (RAS) to keep up with the changes. This document proposes a flexible and computationally efficient approach to automatically determine RAS corrective actions that alleviate line overloading violations. Statistical and functional characteristics summarized from RAS implemented in real power systems are used to guide the design parameters. This report also leverages sensitivity-based techniques to determine corrective actions for specific contingencies quickly without repeated numerical simulations. Finally, future directions for implementing this approach for a fully automated, online RAS are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

54 ENVIRONMENTAL SCIENCES↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Dose- and Risk-Based Groundwater Cleanup Levels for Low Energy Beta Radioisotopes

Low-energy beta-emitting radionuclides that were released historically during reactor operations and plutonium separations activities at some U.S. Department of Energy sites have migrated into the groundwater, forming contaminant plumes that are subject to federally regulated remediation actions. At the Hanford Site, the low-energy beta-emitting radionuclides include iodine-129, technetium-99, chlorine-36, carbon-14, and tritium (H-3). All are highly mobile in the subsurface, and except for tritium, and have very long half-lives—thousands to millions of years. The geochemistry and transport behavior of these contaminants in the subsurface present significant challenges for remediation of groundwater to federal drinking water standards (DWS)—the appropriate or relevant and applicable requirements (ARARs) for cleanup. For some of the low-energy beta-emitter contaminants, particularly iodine-129, cleanup and restoration of groundwater to DWS may not be attainable within a reasonable timeframe using currently available treatment technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multidecadal Biological Monitoring and Abatement Program assessing human impacts on aquatic ecosystems within the Oak Ridge Reservation in eastern Tennessee, USA

Human activities can be powerful drivers of ecosystem change within catchments. While most long-term catchment studies have been conducted at pristine sites, such studies are less common from sites more impacted by human activity. The Oak Ridge National Laboratory's Biological Monitoring and Abatement Program (BMAP) was developed in the mid-1980s to (1) assess compliance with environmental regulations, (2) identify causes of adverse ecological impacts, (3) provide data for human and ecological risk assessments, and (4) evaluate the effectiveness of remedial actions taken to mitigate the impacts of contaminants in soils, groundwater, and surface water by documenting ecological recovery on the Oak Ridge Reservation (ORR), a federally owned 33,476-acre site in eastern Tennessee, USA, managed by the U.S. Department of Energy. The ORR is composed of multiple watersheds containing many small to mid-size streams. BMAP uses an integrated approach for determining stream health; its databases include long-term seasonal records of contaminant concentrations in water and biota, data from aquatic toxicity testing, and surveys of macroinvertebrate and fish assemblages from impacted and reference streams. These long-term data provide valuable records of degradation and recovery in catchment ecosystems. Our objective in this work is to describe our study system and data series in order to increase awareness of the availability of these long-term data to the catchment science community.

54 ENVIRONMENTAL SCIENCES↗