Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Advanced Long-Term Environmental Monitoring Systems (ALTEMIS) Artificial Intelligence Data Management Plan

Across the Department of Energy’s Environmental and Legacy Management sites, complex groundwater plumes exist that will require long-term monitoring to ensure remedial actions that have been put in place remain effective decades into the future. The current monitoring paradigm predominantly consists of groundwater well sampling, whereby samples are collected, concentrations analyzed, and plume anomalies are detected after they have occurred. The Advanced Long Term Environmental Monitoring Systems (ALTEMIS) program is a multi-lab, multi-institution team of researchers that is deploying spatially integrative technologies (i.e., real-time in situ sensor networks), coupled with artificial intelligence and machine learning, to establish a more proactive monitoring paradigm. Within this approach, plume anomalies can be predicted, and corrective actions can be established prior to the occurrence, offering a more cost-effective and robust approach to long-term monitoring. The team has deployed a variety of different in situ sensing technologies at the Savannah River Site’s F-Area Hazardous Waste Management Facility around the F-Area Seepage Basins, which are unlined basins that received 7 billion liters of acidic low-level radioactive waste from the 1950s until the late 1980s. The technologies and techniques that the team is deploying are intended to ensure that the remedial actions that have been taken by the site remain effective decades into the future. Foundational to this approach is a robust, integrated data management and analysis plan to ensure accurate and timely reporting from the variety of sensor systems that are in place. This report will outline the data management plan that has been implemented by the ALTEMIS team at the Savannah River Site and will serve as a blueprint as the technology is translated to new sites across the DOE Complex.

54 ENVIRONMENTAL SCIENCES↗

Asynchronous vibration problem of centrifugal compressor

An unstable asynchronous vibration problem in a high pressure centrifugal compressor and the remedial actions against it are described. Asynchronous vibration of the compressor took place when the discharge pressure (Pd) was increased, after the rotor was already at full speed. The typical spectral data of the shaft vibration indicate that as the pressure Pd increases, pre-unstable vibration appears and becomes larger, and large unstable asynchronous vibration occurs suddenly (Pd = 5.49MPa). A computer program was used which calculated the logarithmic decrement and the damped natural frequency of the rotor bearing systems. The analysis of the log-decrement is concluded to be effective in preventing unstable vibration in both the design stage and remedial actions.

Fujikawa, T.↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scalable Asset Discovery, Vulnerability Scanning, and Penetration Testing for Remote Sites and Wireless Spectrums Utilizing an Embedded Linux Plug - PwniPlug and the Raspberry Pi B+ as a Sample Pen Test

All devices attached to the NASA KSC network are subject to security vulnerability scanning and/or penetration testing. In today's changing environment, vulnerable and/or unprotected systems can easily be overlooked. Systems that are not properly managed can become a potential threat to the operational integrity of our systems and networks. This includes all NASA (internal and external) information systems within NASA KSC Internet Protocol (IP) address space, and NASA KSC facilities. The Office of the Chief Information Officer (OCIO) recommends that all NASA Centers and information systems be subject to penetration testing on a regular interval in accordance with the guidelines identified by the National Institute of Standards and Technology (NIST). (ITS-HBK-2810.04-02A) Protecting information and equipment at NASA is an area of increasing concern. In addition to the CPU's on the network; Supervisory, Control and Data Acquisition (SCADA) systems are especially vulnerable because these systems have lacked standards, use embedded controllers with little computational power and informal software, are connected to physical processes, have few operators, and are increasingly also being connected to corporate networks. The scope of work is comprised of several individual components which together build upon previous work by Drew Branch, NASA KSC Intern. The Pwn Plug is the selected COTS (Commercial-Off-The-Shelf) device chosen to test simplification of mandatory IT Security tasks. The device will be utilized to provide services to NASA KSC and enable an assessment of infrastructure soundness and regulatory compliance in an efficient, economical, and business responsive manner. The Pwn Plug is designed as a pen testing appliance which provides a hardware platform that can support commercial penetration testing efforts at significantly reduced costs. The expected outcomes are: 1) External Penetration Testing, 2) Social Engineering, 3) Procedural Documentation, 4) Recommended Remediation Action Plan, 5) System Retest & Remediation Attestation and 6) Final Reports, out briefing and Presentation. Due to physical and material constraints beyond intern and mentor control, the project was redefined as a working pen-test scenario. Limitations of lab availability and tools dictated an academic exercise. This report was developed within the scenario guidelines suggested by the project mentor. The guidelines were to be creative in developing a Pen Test program for a client.

Penetration Testing↗

Bulk Electric System Protection Model Demonstration with 2011 Southwest Blackout in DCAT

Protection equipment modeling is critical to power systems planning and operational studies, it enables more accurate system response when control actions including protection relays and remedial action schemes (RAS) are adequately modeled and assessed. This paper incorporates a generic protection philosophy to the Dynamic Contingency Analysis Tools (DCAT), and demonstrates its effectiveness by modeling 2011 Pacific Southwest Blackout event autonomously.

Bulk Electric System, Protection, Blackout, DCAT↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustaining On-going Risk Communication at the Riverton, Wyoming, Processing Site - 20310

An environmental risk assessment report has been completed to provide an updated assessment regarding current site conditions for the Riverton, Wyoming, Processing site. Argonne National Laboratory conducted the assessment in collaboration with the U.S Department of Energy (DOE) Office of Legacy Management (LM) and the Northern Arapaho Natural Resources Office (NANRO). The data quality objectives process conducted confirmed that data from plants growing on the Riverton site would be useful and would address an outstanding concern. Data available from site soil, groundwater, and surface water were also used in the assessment in conjunction with the new plant data. A plant survey was then conducted in 2018 to identify the plants at the Riverton site with known traditional Native American cultural uses for sampling and analysis. Laboratory analysis was conducted on the plant samples for the contaminants of concern. Samples were collected from plants growing on the groundwater plume area of the site, and the same was done for eight other areas not affected by the groundwater plume but still within the institutional control boundary. These eight areas served as reference areas for this study. This human health and ecological assessment update provide the quantitative risk information that was qualitatively addressed in a 1995 Risk Assessment Report on plants, livestock, and surface water exposures at the Riverton site [1]. The conditions at the Riverton site are protective of human health and the environment given the results of the update, in combination with past completed remedial action and ongoing monitoring activities and IC implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Test Bed for Vadose-Zone Monitoring Approaches - 20404

In the Central Plateau at the U.S. Department of Energy Hanford Site, a large inventory of contaminants resides in unsaturated sediments within the approximately 100-meter-thick vadose zone, posing a potential continuing risk to groundwater. Vadose zone remedies used to address these contaminants will require performance monitoring to provide feedback during implementation and for long-term verification that remedial action objectives have been met. Passive approaches may also need long-term monitoring to demonstrate that the flux of contaminants from the vadose zone to the groundwater are below thresholds established to meet groundwater protection goals. Collection of physical (e.g., groundwater or sediment) samples is a common method for identifying contaminant concentration distributions, but this approach is limited by the number of locations and the frequency with which data can be collected. In situ vadose zone measurements have evolved over the past few years to include key measurements of water content, soil water pressure, temperature, and chemical concentration. However, the current generation of sensors is designed for relatively short-term use in near-surface soils or sediments. Geophysical methods have been evolving but are also limited in that they have not been designed for the specific long-term vadose zone monitoring needs at the Hanford Site. Overall, monitoring under unsaturated conditions can be difficult due to the need to install and maintain instrumentation over a large area and depth and the need to identify preferential flow pathways due to geologic and chemical heterogeneities over long periods. Thus, a vadose zone monitoring test bed was initiated to address these challenges and identify cost-effective approaches for implementation and postclosure monitoring of the deep vadose zone. The monitoring test bed is expected to provide valuable field-scale information for the design of vadose zone monitoring systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

End State: Vision for Future Land Use at Hanford

An end state vision is influenced by practical constraints associated with technology limitations, resource availability, costs, timing, and unintended consequences of remedial actions, and a site’s next intended use. Therefore, subsurface environmental remediation goals often need to be balanced against the risks and costs of contaminant removal versus leaving contamination in place. For example, in regions where contaminant concentrations are high but immobile, the intended site use should be evaluated in conjunction with the risk of re-mobilization with an aggressive remedy. By contrast, the technological challenges, cost, and time to reach remedial objectives of cleaning up low levels of contamination distributed over large areas in the subsurface may require different considerations for a site’s next intended use.

environmental remediation, environmental managemen↗

Applications of Hyporheic Zone Sampling for Assessing VOC Plume Engineered Remediation and Natural Attenuation Effectiveness - 20414

Determining the efficacy of engineered remedial actions and/or natural attenuation as an acceptable EPA Record of Decision (ROD) must address long-term temporal and spatial variability. Since final plume downslope destinations are aquifers and related surface streams and rivers, hyporheic zone sampling is essential. Comprehensive hyporheic sampling documents plume groundwater remediation prior to upwelling into stream benthic strata and natural attenuation within this dynamic zone itself. Our intensive sampling of the Savannah River Site (SRS) Chemical, Metals, and Pesticides (CMP) Pits VOC plume-fringe from 2005 to 2018 documented PCE natural attenuation and effectiveness of In Situ Thermal Treatment (ISTT). Most plume hyporheic upwelling was delimited to a 20 m inflow reach along Pen Branch. Our study utilized corroborative sampling methodologies: ambient hole-water grab samples: passive diffusion bags (PDB); and hole-core sediment samples to confirm station to station spatial and temporal trends. VOC hot spot detections were confirmed from both groundwater and soil core samples. VOC pathways through the Pen Branch hyporheic zone were assessed at hole-installation using sequential soil samples from augered cores and grab-samples of hole-bottom water. Longer term, composite water samples were collected from PDBs deployed for a minimum two-week equilibration period. Soil samples were collected from the 15 and 65 cm core levels in December 2017 and June 2018 at six stations. Additional core depths of 40 and 85 cm were sampled in June 2018 at the highest VOC station (5DB80). All samples were analyzed in an EPA certified lab by purge and trap GC-MS. Effectiveness of previous ISTT and soil vapor extraction (SVE) for this CMP Pits PCE plume, was clearly documented by significant downward trends in VOC at hyporheic zone stations prior to December 2015. Achieving final stage conversions of PCE daughter products to ethene and CO{sub 2} may be limited depending upon suitable interactions between hyporheic zone sediment morphology, hydrology, and redox conditions. Because declines in VOC daughter products at our hyporheic stations may also be caused by physical actions of dilution and dispersion rather than true biochemical dechlorination, full quantification of natural attenuation requires the use of compound-specific isotope ratio analysis (CSIA) and microbial 16S rRNA with qPCR. To assist these next-phase efforts, a natural attenuation index (NAI) was used to help produce quicker, more cost-effective decision making for locating CSIA and microbial sampling efforts. The NAI used natural logarithm transformed GC-MS results for station VOC degradation compounds versus VOC parent compounds. Wide differences were observed between stations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Automated Corrective Actions for Special Protection Schemes

The constantly evolving nature of the grid is compelling the design process of Remedial Action Schemes (RAS) to keep up with the changes. This document proposes a flexible and computationally efficient approach to automatically determine RAS corrective actions that alleviate line overloading violations. Statistical and functional characteristics summarized from RAS implemented in real power systems are used to guide the design parameters. This report also leverages sensitivity-based techniques to determine corrective actions for specific contingencies quickly without repeated numerical simulations. Finally, future directions for implementing this approach for a fully automated, online RAS are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

54 ENVIRONMENTAL SCIENCES↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗