Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE PROCESSING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Westinghouse Cementation Facility of Solid Waste Treatment System - 13503

During NPP operation, several waste streams are generated, caused by different technical and physical processes. Besides others, liquid waste represents one of the major types of waste. Depending on national regulation for storage and disposal of radioactive waste, solidification can be one specific requirement. To accommodate the global request for waste treatment systems Westinghouse developed several specific treatment processes for the different types of waste. In the period of 2006 to 2008 Westinghouse awarded several contracts for the design and delivery of waste treatment systems related to the latest CPR-1000 nuclear power plants. One of these contracts contains the delivery of four Cementation Facilities for waste treatment, s.c. 'Follow on Cementations' dedicated to three locations, HongYanHe, NingDe and YangJiang, of new CPR-1000 nuclear power stations in the People's Republic of China. Previously, Westinghouse delivered a similar cementation facility to the CPR-1000 plant LingAo II, in Daya Bay, PR China. This plant already passed the hot functioning tests successfully in June 2012 and is now ready and released for regular operation. The 'Follow on plants' are designed to package three 'typical' kind of radioactive waste: evaporator concentrates, spent resins and filter cartridges. The purpose of this paper is to provide an overview on the Westinghouse experience to design and execution of cementation facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Robotics in Liquid Waste System - {sup 3}H Evaporator, Tank Closure and Defense Waste Processing Facility - 18525

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Salt-stone Production Facility (SPF). At Savannah River Remediation (SRR), the liquid waste contractor, robotic technologies are needed to enter areas and spaces that are otherwise inaccessible or prohibit direct access by workers due to unsafe, unstable, or unknown physical or structural conditions; or configurations that are hard to reach or beyond reach without taking extraordinary mechanical measures. As discussed below, SRR uses robotic technologies at various LWS facilities to reduce dose to the workers as well as provide access to unreachable locations due to the presence of radiological or chemical hazards. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing the Legacy Waste Challenge - IAEA Activities in Support of Member States - 16304

The International Atomic Energy Agency (IAEA) promotes the safe and peaceful uses of nuclear energy including the safe management of radioactive waste. Although safe and effective radioactive waste processing technologies and practices are well established and widespread, the issue of legacy waste remains a challenge for many IAEA member states. The primary source of the world-wide legacy waste inventory has its origins in past nuclear weapons programs and associated research and development activities. Other sources include historical waste in old storage and disposal facilities that were either never intended to be a permanent end-state or are no longer considered adequate from a safety perspective. Additionally, many IAEA member states with less advanced nuclear energy programs, often have small inventories of legacy radioactive waste arising from medical, research and industrial activities but lack the processing capabilities to put these wastes into a safe form for storage and disposal. These wastes have the potential to create a safety and environmental hazard and pose a radioactive waste management challenge for many reasons including lack of characterization data and process knowledge, waste package degradation, or the presence of hazardous or mixed waste components. The Waste Technology Section (WTS) within the Department of Nuclear Energy at the IAEA has an extensive program of activities to support the safe retrieval, processing, storage and disposal of radioactive waste including legacy waste. These include publications, co-ordinated research projects, technical co-operation activities, and information exchange forums including workshops, technical meetings and virtual networks. This paper will present an overview of recent IAEA activities and accomplishments aimed as assisting member states with addressing their legacy waste inventories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress and Status of the Ignalina Nuclear Power Plant's New Solid Waste Management and Storage Facilities

A considerable amount of dry radioactive waste from former NPP operation has accumulated up to date and is presently stored at the Ignalina NPP site, Lithuania. Current storage capacities are nearly exhausted and more waste is to come from future decommissioning of the two RMBKtype reactors. Additionally, the existing storage facilities does not comply to the state-of-the-art technology for handling and storage of radioactive waste. In 2005, INPP faced this situation of a need for waste processing and subsequent interim storage of these wastes by contracting NUKEM with the design, construction, installation and commissioning of new waste management and storage facilities. The subject of this paper is to describe the scope and the status of the new solid waste management and storage facilities at the Ignalina Nuclear Power Plant. In summary: The turnkey contract for the design, supply and commission of the SWMSF was awarded in December 2005. The realisation of the project was initially planned within 48 month. The basic design was finished in August 2007 and the Technical Design Documentation and Preliminary Safety Analyses Report was provided to Authorities in October 2007. The construction license is expected in July 2008. The procurement phase was started in August 2007, start of onsite activities is expected in November 2007. The start of operation of the SWMSF is scheduled for end of 2009. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radio Active Waste Plants - Back to the Future

This paper outlines the potential to provide smaller, potentially modular radwaste plants, suitable for new reactor proposals, within increasingly strict environmental control regimes, and with reduced discharge authorisations. Aker Kvaerner have been involved in the design, build and commissioning of radwaste plants over many years and provided the plant for Sizewell B, one of the last major PWRs to be built anywhere in the world. Unit operations and design characteristics of radioactive waste processing plant are discussed. It is concluded that these have changed little in the past 30 years. The traditional build characteristics and metrics of large radioactive waste processing facilities are described in both the reprocessing and the power generation industries. New reactor and fuel characteristics are described and used to highlight areas of potential design improvement, reducing the size, complexity, construction programme and cost of future power reactor radwaste facilities. In summary - implications for Design: Taking these factors into account, we can now expect that compared to Sizewell B radwaste plant, it is possible to match the AP1000 metrics given in Figure 4 above. In principle, this could deliver a building and plant volume of the order of one third to one half of that for Sizewell. It may be possible to make larger reductions in building volume although this is primarily due to the removal of evaporation and relocation of gaseous waste processing. The expected improvements are: - Reduced complexity and interactions significantly improve operational safety - Process intensification and close alignment of processes against reactor waste streams deliver reduced plant size. - Accelerated construction; this becomes possible because of reduced building size, and improved, fit-for-purpose building design. - Programme: The use of skid mounted package plant, modular 'pack' systems for filters and ion exchangers, can shorten construction time. - Allowance for sub contractor support service, by provision of Docking Bays and subcontractor Laydown areas, allows the future use of specialist waste services. - Environmental; Reduced operational source terms gives potential for significantly reduced liquid and gaseous effluent levels. - Solid Waste; improved ion exchange processes deliver equivalent performance with reduced waste volumes. - Increased use of modular design and skid mounted systems. - As a whole, these allow optimal design for the whole life cycle. - Although more intensive, the processes have still not changed from those of the past. Hence, Back to the Future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Production of an impermeable composite of irradiated graphite and glass by hot isostatic pressing as a long term leach resistant waste form

Around 250,000 tons of irradiated graphite (i-graphite) exists worldwide and can be considered as a current waste or future waste stream. The largest national i-graphite inventory is located in UK (∼ 100,000 tons) with significant quantities also in Russia and France [5]. Most of the i-graphite remains in the cores of shutdown nuclear reactors including the MAGNOX type in UK and the UNGG in France. Whilst there are still operational power reactors with graphite cores, such as the Russian RBMKs and the AGRs in UK, all of them will reach their end of life during the next two decades. The most common reference waste management option of i-graphite is a wet or dry retrieval of the graphite blocks from the reactor core and the grouting of these blocks in a container without further conditioning. This produces large waste package volumes because the encapsulation capacity of the grout is limited and large cavities in the graphite blocks could reduce the packing densities. Packing densities from 0.5 to 1 tons per cubic meter have been assumed for grouting solutions. Furthermore the grout is permeable. This could over time allow the penetration of aqueous phases into the waste block and a potential dissolution and release of radionuclides. As a result particularly highly soluble radionuclides may not be retained by the grout. Vitrification could present an alternative, however a similar waste package volume increase may be expected since the encapsulation capacity of glass is potentially similar to or worse than that of grout. FNAG has developed a process for the production of a graphite-glass composite material called Impermeable Graphite Matrix (IGM) [3]. This process is also applicable to irradiated graphite which allows the manufacturing of an impermeable material without volume increase. Crushed i-graphite is mixed with 20 vol.% of glass and then pressed under vacuum at an elevated temperature in an axial hot vacuum press (HVP). The obtained product has zero or negligible porosity and a water impermeable structure. Structural analysis shows that the glass in the composite has replaced the pores in the graphite structure. The typical pore volume of a graphite material is in the range of 20 vol.%. Therefore no volume increase will occur in comparison with the former graphite material. This IGM material will allow the encapsulation of graphite with package densities larger than 1.5 ton per cubic meter. Therefore a huge volume saving can be achieved by such an alternative encapsulation method. Disposal performance is also enhanced since little or no leaching of radionuclides is observed due to the impermeability of the material NNL and FNAG have proved that IGM can be produced by hot isostatic pressing (HIP) which has several advantages for radioactive materials over the HVP process. - The sealed HIP container avoids the release of any radionuclides. - The outside of the waste package is not contaminated. - The HIP process time is shorter than the HVP process time. The isostatic press avoids anisotropic density distributions. - Simple filling of the HIP container has advantages over the filling of an axial die. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Analysis of Coupled Flow Through Packed Beds as a Diagnostic Tool for Packed Bed Reactor Health - 17172

The US Department of Energy, Office of River Protection, is building the Waste Treatment and Immobilization Plant (WTP) in Richland, Washington, to immobilize the hundreds of millions of liters of radioactive waste stored at the Hanford Site in Washington state. The offgas generated during vitrification of these wastes requires treatment to remove and/or destroy chemical and radioactive hazardous components before release to the atmosphere. In particular, volatile and semi-volatile hydrocarbon components are to be catalytically oxidized to carbon dioxide and water, whereas nitrogen oxides (NOx) are to be catalytically reduced to nitrogen and water. These tasks are accomplished in a series of packed bed reactors. Achieving the requisite Destruction/Removal Efficiency (DRE) for each of the tracked components is highly dependent on the flow characteristics of the offgas through the packed beds. The flow kinetics may be monitored and characterized during the initial warm-up of the system. The gases, initially at 76 deg. C (169 deg. F), (a) flow through one side of a countercurrent heat exchanger to recover heat from the exiting gases (which have already passed through the catalytic beds), (b) are then further heated electrically to approximately 400 deg. C (750 deg. F; the preferred operating temperature of the Thermo Catalytic Oxidizer (TCO)), (c) pass through the TCO where the reduced components of the offgas are oxidized over a supported Pt catalyst bed, (d) are partially cooled to approximately 315 deg. C (600 deg. F) by addition of approximately 25% (by weight) diluted ammonia/air mixture, (e) pass through the Selective Catalytic Reducer (SCR) where the NOx components are converted to N{sub 2} and H{sub 2}O over a supported V2O{sub 5}/TiO{sub 2} catalyst bed, and (f) exit through the hot side of the countercurrent heat exchanger. The electrical heater is not powerful enough to raise the temperature of the offgas to the desired 400 deg. C without the contribution of the heat recovered in the heat exchanger. Moreover, the thermal mass of the beds and housings of the TCO and SCR require a significant input of thermal energy to reach the desired operating temperatures; the better part of a day is required to bring the unit from ambient temperatures to operating temperatures. Therefore, the temperature of the stream during the initial warm-up of the system at each point in the system is dependent upon the thermal mass, flow dispersion, and permeability of the components, quantified as characteristic/representative volumes and residence times. By monitoring the temperature of the offgas as it enters and exits each portion of the system during this warm-up period one may model the system as a series of small Continuously Stirred Tank Reactors (CSTR)s (referred to as 'CSTRlets') to explain the flow kinetics through the catalyst beds. These component CSTRlets are adjustable in size and number, that one may model the flow profile of the gases through the catalyst beds. For example, a single large CSTR will present an effluent temperature profile with a simple exponential decay shape. Concatenating more CSTRlets generate more complex sigmoidal responses. Concatenating one CSTRlet significantly larger than the others in the train also alters the shape of the effluent temperature profile, in a fashion not replicable by a train of equal-sized CSTRlets. The ultimate goal is to accurately emulate the entire system as a representative CSTRlet train. Once accomplished, this characterization may be used in subsequent warm-ups (following shutdown for catalyst maintenance, for example) or by an intentional step change in inlet offgas temperature to detect/diagnose anomalies in flow through the beds (e.g., channeling or partial blockage.) This work presents development of this model through analytical, calculational, and empirical means. - The analytic model is accomplished by Laplace transform analysis of each component to recover component process transfer functions. - The calculational portion is performed via brute force finite element calculation. - Fitting empirical data from the warm-up of the TCO skid allows one to select the hypothetical CSTRlet trains which best fit the TCO and SCR beds for the analytical and finite element calculations. The first portion of this paper presents the development of the analytical (Laplace space) model of the coupled system. Estimated values for the initial temperature, mass, specific heat, electrical heat, and relative quantities of the offgas, catalyst beds, stainless steel housings, and ammonia dilution stream are used to generate expected temperature profiles at several selected junctures of the system. The number and size of the component hypothetical CSTRlets are calculated from the analytical model and are used to predict temperature profiles at the exit of the system and at intermediate junctions between system components (where thermocouples are present in the actual unit.) The finite element calculations employ a series of CSTRlet volumes to produce a similar suite of temperature profiles, for comparison with the analytical model results. Finally, empirical data from the Factory Acceptance Test system warm-up are used to select and compare the results from each modeling strategy to select the CSTRlet train(s) which best model the behavior of the actual system. This work presents a novel method of system component characterization, of value to the WTP plant and similar vitrification facilities as well as chemical process industries unrelated to waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Update - Installation and Operation of GeoMelt{sup R} ICV{sup TM} Process in the NNL's Central Laboratory on the Sellafield Site - 16410

Thermal treatment of nuclear waste in the UK has seen much renewed interest recently, owing to the advantages that can be gained in terms of reduced waste volumes, compatibility with reactive metals and organics and its ability to treat mixed generic wastes. Vitrification is a treatment option which destroys organics and some hazardous inorganics such as asbestos, reduces wasteform volume, and produces a robust leach resistant wasteform. Kurion's GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} is a vitrification process where the treatment vessel can serve as an interim-storage, transport, and final long-term storage vessel - thus negating the need to pour glass into a separate container, effectively leading to a much simpler system than traditional waste melters. The UK's National Nuclear Laboratory (NNL) and Kurion have entered into a joint project to deploy an active waste ICV{sup TM} plant based on Kurion's GeoMelt{sup R} technology, at NNL's flagship Central Laboratory on the Sellafield site. NNL is the UK's national laboratory for civil nuclear science and technology, providing advice to government, protecting key skills, supporting industry and delivering national nuclear programs. NNL is bringing the Kurion GeoMelt{sup R} process alongside its existing capabilities in thermal waste treatment. Kurion provides technology solutions to minimize and stabilize nuclear and hazardous waste through its families of technologies: access, separation and stabilization processes. The GeoMelt{sup R} plant being installed at the NNL's Central Laboratory creates a platform to evaluate the vitrification technology for the variety of wastes from the NDA estate and creates a treatment path for problematic waste streams that currently have no disposition pathway. With the diverse facilities under NNL management coupled with the NNL's ability to import wastes from within the UK and Europe, this arrangement with Kurion provides waste owners with treatment disposition pathways for problematic wastes. The Kurion / NNL team completed non-radioactive commissioning of a GeoMelt{sup R} ICV{sup TM} treatment system in 2015. Commissioning consisted of performing two tests at NNL's Workington Laboratory. Commissioning Test 1 involved vitrification of 367 kg of glass frit over the course of approximately 18 hours. Commissioning Test 2 consisted of processing 470 kg of soil and additives in approximately 27 hours. The soil processed in the second test was non-radioactive soil from Sellafield and was used as an analog for radioactive soil to be processed during radioactive commissioning at the Central Laboratory at Sellafield. All commissioning test goals were easily achieved and all subsystems operated as designed. Radioactive commissioning will be carried out in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficient and compact mobile equipment based on the new RADEON-NWM technology to process liquid radioactive wastes resulted from the accidents of the nuclear installations

During the operation of nuclear reactors important volume of liquid and solid radioactive wastes are generated, which, in normal conditions, becomes processed by stationary equipment by different methods to minimize their volume and then sent to specially constructed storages. The cases of accidents of Chernobyl and Fukushima showed that the localization of rejected big quantity of radioactive wastes is a prior problem for their further processing by stationary equipment. In this regard it is very important the processing of radioactive wastes on the contaminated areas to localize them by mobile equipment based on the efficient technologies. RADEONNWM new technology allows resolving this problem. This technology is compact, completely automated, which makes possible to assemble it on a standard 40-ft by 7-ft trailer driven by heavy-duty truck. The new technology is fully elaborated, the necessary tests are conducted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Comparison of Filter Performance at PEP and CUF Scale

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed-preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. The work described in this report presents filter flux results obtained at two different scales based on tests performed with a Hanford tank waste simulant. The tests were made at the lab-bench scale on a cold (i.e., designated for non-radioactive simulant test materials) Cells Unit Filter [CUF]) and in the Pretreatment Engineering Platform (PEP), which is a 1/4.5-scale mock-up of key PTF process equipment. One set of tests was conducted with the simulant feed (low solids), and one test was conducted at a relatively high solids concentration. The results of these tests are compared to support a scale factor for use in the WTP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repurposing Hanford Waste Tank AP-106 for Interim Storage of Treated Low-Activity Waste - 20044

Hanford Double-Shell Tank AP-106 is being repurposed to serve as the lag storage tank holding feed for the Direct Feed Low-Activity Waste (DFLAW) process at the Waste Treatment and Immobilization Plant (WTP). The repurposing process is the sequence of tank additions and transfers that will remove the Cs 137 inventory from AP-106. The repurposing process steps are designed to remove Cs-137 more effectively and efficiently as compared to regular supernatant transfers. The process steps are estimated to take 2-months to complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of Hot-Isostatic Pressing for the Treatment of Radioactive Wastes - 18276

Hot-isostatic Pressing (HIPing) was first developed by Battelle in the 1950's for applications in the nuclear program. The use of HIPing as a means of treating radioactive wastes was first proposed and patented in Sweden in the 1970's and subsequently gained traction in the US, where throughout the 1980's and 90's work was undertaken at Rockwell, Lawrence Livermore National Laboratory (LLNL), and Idaho National Laboratory (INL) on waste-forms for US Defense wastes. This development was coupled with front-end processing options leading to conceptual plant designs which included hot-cell layouts and costings. Industrial maturation of hot-isostatic press (HIP) technology over the last 20+ years has seen it increasingly become a candidate for treating a variety of waste streams. In this paper, we discuss HIP concepts for treating radioactive wastes, present some recent work undertaken by the authors to demonstrate the feasibility of HIPing for sludge wastes and ion exchangers, and discuss the options and technology challenges for implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Westinghouse Waste Simulation and Optimization Software Tool - 13493

Radioactive waste is produced during NPP operation and NPP D and D. Different kinds of waste with different volumes and properties have to be treated. Finding a technically and commercially optimized waste treatment concept is a difficult and time consuming process. The Westinghouse waste simulation and optimization software tool is an approach to study the total life cycle cost of any waste management facility. The tool enables the user of the simulation and optimization software to plan processes and storage buildings and to identify bottlenecks in the overall waste management design before starting detailed planning activities. Furthermore, application of the software enables the user to optimize the number of treatment systems, to determine the minimum design capacity for onsite storage facilities, to identify bottlenecks in the overall design and to identify the most cost-effective treatment paths by maintaining optimal waste treatment technologies. In combination with proven waste treatment equipment and integrated waste management solutions, the waste simulation and optimization software provides reliable qualitative results that lead to an effective planning and minimization of the total project planning risk of any waste management activity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring the Composition of Low-Activity Nuclear Waste using In-Situ Measurements - 19356

This paper presents a methodology for on-line monitoring of anion concentrations in low-activity nuclear waste simulants. The study was designed to evaluate and compare the performance of in-situ infrared and Raman spectroscopy probes for use in Hanford tank waste mixtures. Our contribution also explores the performance of various regression models to extract species concentrations from in-situ spectroscopic measurements. This approach can help facilitate processing under the Hanford Direct Feed Low-Activity Waste (DFLAW) project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Licensing of Irradiated Uranyl Nitrate Liquid Containers and Applicable Loading and Packaging System - 18481

Irradiated highly enriched uranyl nitrate liquid (HEUNL) solutions are typically residual materials resulting from the processing of uranium target materials in the production of radioisotopes. Traditionally, these residual materials have been processed and stored at the site of origin, due to the lack of an option for packaging, transportation and disposition. Modern alternatives to process, stabilize, package and dispose of these materials have been developed, but until recently there has not been a viable Type B package solution that could be used to ship these materials in sufficient quantities to justify the cost of an off-site disposition strategy. For this reason, most facilities that generate irradiated HEUNL materials have implemented on-site storage tanks or containers, resulting in the significant accumulation of HEUNL inventories worldwide. This paper provides an overview of the design and licensing activities for the development of sealed irradiated HEUNL transport containers to permit safe transportation of this material in the NAC Legal Weight Truck (NAC-LWT) cask. A description of the robust HEUNL container, licensing and fabrication is also presented. In addition, NAC has developed a specialized loading system to optimize the process to load, package and un-package HEUNL materials to minimize worker exposure during loading, and execute the packaging process efficiently for safe transport and retrieval. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗