Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIATION HAZARDS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

3D Virtual Simulation for Radiation Safety and Hazards Identification Training

This presentation will be presented at CAES codebreaker session on May 4th. The slides include two projects that demonstrate how virtual training can benefit from visualization technology. One is a collaboration project between the Applied Visualization Laboratory and College of Eastern Idaho for radiation safety and survey training. The other one is Idaho National Laboratory's hazards identification online training that utilized LiDAR technology.

99 GENERAL AND MISCELLANEOUS↗

Development of the Mobile Systems for Conditioning of Disused Sealed Radioactive Sources in Serbia - 20105

Sealed radioactive sources (SRS) are being used worldwide in the field of medicine, agriculture, industry and research. They can be found in mobile as well as stationary devices. SRS contains radioactive material that is (a) permanently sealed in a capsule or (b) closely bounded and in a solid form. The capsule or material of an SRS should be strong enough to maintain leak tightness under the conditions of use and purpose for which the source was designed, also in case of accidents. In this case only emitted radiation is utilized. Firstly, the hazard from external radiation has to be considered, but the possibility of contamination due to fracture of the capsule should not be disregarded. The radioactive sources are composed of the radiating isotope contained in the filling medium, the single or double isotope holder that partially or totally surrounds the filling medium, the outer cover that contains the parts mentioned above and the capsule closed airtightly by welding or using some other method. The capsule must be tested for leakage periodically. If the SRS is no longer needed (e.g. replaced by a different technique) or it becomes useless for the intended application (e.g. the activity becomes too weak, the equipment containing the source works poorly or becomes obsolete, the source is damaged or leaking) it is considered disused. Disused sealed radioactive sources (DSRS) are typically conditioned and disposed if a facility is available. If the disposal option is not available, conditioned DSRS should be stored under proper conditions. In some cases, the radionuclide(s) in DSRS can be recovered/recycled or the DSRS can be repurposed for other applications. Conditioning of DSRS ensures containment of the radioactive material, provides confinement for leaking sources, provides sufficient radiation shielding, reduces storage/disposal volume by allowing consolidation of multiple sources into a single storage/disposal container, facilitates transport operations and contributes to safety and security as well. Typically, conditioning technologies are deployed either as permanently installed stationary systems in centralized or mobile on-site waste processing facilities, or in a mobile configuration. Centralized stationary facilities provide a single processing location for multiple users that requires transport of the waste to the facility. On the other hand, mobile systems may be provided for the selection and application of the optimum technology for a specific waste stream (such as DSRS) by bringing the process to the point where the waste is generated. In addition, mobile systems could offer additional flexibility by sharing equipment among multiple waste generating sites for processing campaigns that vary in duration, from very short periods to several years. The term 'mobile processing system' refers to any radioactive waste processing system or component which is designed to be transportable and which is not considered permanently installed. Two mobile system for conditioning of disused sealed radioactive sources are developed in the Public Company Nuclear Facilities of Serbia. Development of these mobile systems was supported by SRB9005 national project via Technical Cooperation of the IAEA. The first mobile system, built inside the 20 feet ISO container, will be used for conditioning of DSRS category 3 to 5. The second mobile system, built inside the 7 m long vehicle (Iveco Daily Van), will be used for dismantling of ionizing smoke detectors mostly with Am-241 sources. Designs of the mobile systems were defined in cooperation with two companies from Belgium (Belgoprocess and Leniko) and a Croatian company Ekoteh as well as with the support of the IAEA experts. The generic safety assessment and operational procedures for the mobile systems are developed. Based on safety assessment the acceptance criteria and operational limits and conditions are established. Operational procedures include: (a) equipment and material requirements, (b) assembling procedure of the mobile unit, (c) procedure for acceptance of devices for dismantling and conditioning, (d) dismantling procedure for devices to recover the DSRS, (e) characterization of DSRS, (f) encapsulation procedure of DSRS, (g) disassembling procedure of the mobile unit, and (h) keeping records, identification and traceability. In addition, radiation safety, health safety, security and emergency preparedness plans are prepared. The generic safety assessment and operational procedures could be updated with site specific requirements, DSRS inventory, and different needs for future customers. Developed mobile systems could be used in all situations when it is feasible to perform conditioning of DSRS on the spot in the county and worldwide. Development of these mobile units was just the first step to create the Reference Center for Radioactive Waste Treatment and Disused Radioactive Sources Conditioning for Small Facilities which can become a regional training center in the future, and/or as a tool for comprehensive national search and secure programmes. In the next phases development of e-learning platforms and blended learning packages as well as application for the IAEA Qualified Technical Centre (QTC) for the management of DSRS is foreseen. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of a Robotic Exoskeleton Device for use in Glove Boxes - 20374

Glovebox operators in nuclear facilities often operate under radioactive environment and typically perform monotonous, dull and repetitive work. This can result in muscle fatigue leading to increased levels of accidents. Current research work aims in assisting the glovebox operators by designing a novel upper limb exoskeleton device to reduce injuries and increase worker efficiency. Almost none of the commercially available hand and upper body exoskeletons are directly suitable for use in gloveboxes. This explains the novelty of the present work in developing a wearable powered robotic exoskeleton device. The device consists of electronics, motors and spring systems mounted on adjustable plates and is supported by a stationary frame behind the worker. The device is intended to be portable and adjustable according to the operator height. The elbow has a flexion movement assisted with motor control by way of a Bowden cable system. The system is floated on a spring and pulley combination that allows for extra safety and smoothness of operation. The end points are fixed near the pivot points to help minimize unwanted movement/torque. The extension movement of the upper and lower arm are assisted by gravity and a counter spring. The shoulder and upper arm movement are held in a neutral position with a spring system for counter balance allowing small movements within the glovebox. This initial concept considers only the vertical movement of the arm. The abduction and adduction movement will not be assisted or impeded by the over shoulder plate or at the forearm plate allowing for full range of motion. Several glovebox aspects such as the level of task assistance, ergonomic design, minimum hindrance in dexterity/operator movements and tear resistance for hazardous safety reasons will be considered in the design of the exoskeleton. Computer models will be simulated to test the load levels and stress conditions on the exoskeleton to enhance the designs. The exoskeleton focusses on major muscular involvement reduction through weight offset and active assistance with minimal parts and hence the device is derived with several joint links and contains both passive and active joints. The paper details the various stages in the design development and prototype testing of the exoskeleton device. Upon successful prototype device development, human testing will be conducted in a replica of the SRS-235F hot cell facility constructed at FIU-ARC. The final stage of the project will be potential testing/deployment of the exoskeleton device in one of the glovebox facilities in Savannah River Nuclear Waste site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020

On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Literature Review of Documented Persistent Secondary Uranium Sources at DOE LM Sites

The U.S. Department of Energy Office of Legacy Management (LM) has the responsibility to protect human health and the environment at 101 legacy uranium sites across the nation by implementing long-term surveillance and maintenance requirements. Included in these responsibilities is to provide for the safe and environmentally sound disposal, long-term stabilization, and control of uranium mill tailings in a manner that minimizes or eliminates radiation health hazards to the public at 21 Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I sites; 6 UMTRCA Title II sites; and 9 Comprehensive Environmental Response, Compensation, and Liability Act/Resource Conservation and Recovery Act sites. These sites are former uranium mills (processing sites), or sites with wastes from processing sites encapsulated in engineered disposal cells (disposal sites), or sites where components of atomic weapons were manufactured. During site characterization, groundwater contamination was often discovered and evaluated or modeled for future movement with the inclusion of uranium sorption in the groundwater plume. Much of this original work did identify uranium processing wastes as the original contaminant source. However, more recent work has identified the existence and influence of persistent secondary uranium sources that may prevent uranium in groundwater from attenuating as quickly as initial evaluations or modeling indicated. By understanding these processes, better decisions can be made to choose the appropriate remediation and closure strategies, identify long-term surveillance and maintenance activities, and more accurately estimate life-cycle costs. The purpose of this report is to summarize the literature available on documented persistence secondary uranium sources at LM sites as part of the Applied Studies and Technology Persistent Secondary Contaminant Sources Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permanent Foam Fixatives for Radioactive Contamination Control: Environmental Chamber Testing

The Department of Energy (DOE) Office of Environmental Management (EM) is tasked with closing cleanup sites throughout the DOE-EM complex. A major component of successfully closing the sites is the deactivation and decommissioning (D&D) of radioactively contaminated buildings in nuclear facilities. Deactivation consists of the process of placing a contaminated facility in stable condition in order to minimize any risks that could affect workers, the public, and the environment. Successful deactivation and decommissioning consists of leaving the buildings in an agreed upon end state to provide future protection against hazards. Hazards include radiation but can also include asbestos, polychlorinated biphenyls, and other environmental and physical hazards.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Volume Airborne Contamination Monitoring To Support Nuclear Processes' Deactivation and Decommissioning

Current D and D operations at Hanford have demonstrated a flaw in the current state of the art capability of defining airborne contamination boundaries - Airborne particulate emissions of Pu-239 from CM2H operations on the Hanford Pu Finishing Plant were detected well beyond areas controlled for airborne Pu, putting numerous workers at risk for radiological assimilations - Current air samplers and CAM systems were surveying insufficient volumes of air to accurately predict where respiratory protection was required - Hanford is located in a high radon environment, making air monitoring for alpha emitting actinides challenging in high alpha radon induced backgrounds. - Inexpensive HEPA based home and industrial air purifiers filter significantly higher volumes of air than commercially available continuous-air monitoring (CAM) systems. - Inexpensive models capable of filtered air volumes exceeding 1000 times that of a CAM. - Detector system can be built to detect x-rays generated from actinide decay. - Branching ratios of x-rays are 4 orders of magnitude more intense from Plutonium decay than its gamma emissions. - Detector system can be a low resolution systems, as x-ray region of interest is not terribly congested. - Detection systems evaluated will be designed based on slabs of NaI or pixelated NaI or CsI panels. - Simple graphical user interface software will be developed to operate the detection system. - Concept is to deploy some of these air-purifying systems in nonradiological areas around SRNL to confirm radon can be rejected with confidence. - Generate some filters contaminated with plutonium via electroplated Pu or lab generated simulated particles. - then deploy units in known airborne radiological environments to establish systems ability to accurately measure actinide based hot particles Lab analyses will follow up the system analyses to ensure hot particles were correctly identified. Analysis by Scintillation: - Application of scintillation media to the surface of the filters is being explored. - Evaluating slabs of ZnS(Ag), application of powdered ZnS(Cu) and spray on Perkin Elmer Enhance. - Scintillation events would then be digitized with a digital camera and quantified. - Comparing against sensitivity of a PMT or SiPD readout. - Currently evaluating a Thorlabs 8 Megapixel Monochrome Scientific CCD Camera, hermetically sealed cooled package with a wide angle lens. - Wide angle lens allows complete view of HEPA filter from 7 inches away. - Images taken of glow in the dark paint, as well as plutonium-induced fluorescence. - Plutonium was flamed mounted on a 1 inch diameter stainless steel planchet, covered with a layer of mylar and a section of scintillating ZnS obtained from Eljon. - Currently working on reducing signal-to-noise levels to boost sensitivity. - Dark box to hold contaminated or electroplated source covered filters under fabrication. Analysis by x-ray Spectroscopy: - Branching ratios for x-ray emissions from Plutonium isotopes are orders of magnitude more intense than gamma-ray emissions. - The nuclear databases are incomplete on the branching ratios of some of the isotopes. - Evaluating some custom built SrI2 x-ray spectrometers vs a conventional windowed NaI detector. - SrI2 detectors are carbon-composite-windowed 51 mm x 51 mm. - MCNP calculations to establish self absorbance of filter media on 17 keV x-ray. Radon Rejection: - Activated charcoal pre-filter acts as a Radon trap. - Adding a time lapse feature to camera to aid in radon rejection. SRS Plutonium Fuel Form D and D Operations: Currently deploying air sampler to D and D operation of Pu-238 facility at SRS to generate some field samples to analyze.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on TRANSCEND Theme 1: Integrated Waste Management - 20194

The management of radioactive waste includes mobilisation, processing, packaging, storage, transport and final disposal. Research in the Integrated Waste Management theme of TRANSCEND focuses on underpinning science and engineering in areas of relevance to hazard reduction and decommissioning and the objectives are to: (1) develop new materials for effluent decontamination; (2) demonstrate predictive modelling of sludge/slurry removal, underpinned by experimental data; (3) transform understanding of radiation-driven processes in nuclear waste sludges; and (4) provide underpinning studies to develop innovative processes and wasteform materials. This paper gives overviews of the 16 research projects that will be done over the next 3 years in this theme. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of General Area Dose Rates During Closure Weld Operations on the DOE Standard Canister Pacific Basin Nuclear Conference 2024

The Department of Energy (DOE) Spent Nuclear Fuel (SNF) Road Ready Demonstration Project is an effort to package DOE-managed SNF for road-ready dry storage. A key operation in this demonstration is performing the closure weld on the DOE Standard Canister after it has been loaded with the SNF. Planning the closure weld operations is ongoing and must consider what parts of the operations (if any) can be done manually and what parts must be done remotely. A key parameter to inform the evolving planning of these operations is the dose rate in the vicinity of the canister and the dose hazard posed to the closure weld operators and collocated workers. This study developed a Monte Carlo N-Particle (MCNP) model of the closure weld operation, which was used to estimate general area dose rates as well as dose rates to the welding location, weld operators, and collocated workers. These estimates provide some insight into the potential radiation exposure hazard for workers during the operations and are a factor to be considered in the ongoing development of designs, technology, processes, and administrative controls for packaging DOE-managed SNF for road-ready dry storage.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Challenges of Air Monitoring at a Soil Remediation Project in a Suburban Setting - 20448

Air monitoring during soil excavation at a chemically and radiologically impacted site in a suburban setting presents unique challenges. Site activities were conducted in a manner that minimized the release of airborne particulates of concern, principally radionuclides of concern (ROC). Dust and air monitoring were performed to ensure the public was not being exposed to the soil contaminants. The project team collected representative air and dust data while being mindful to not impose on the lives of residents in the area. Due to the close proximity to the public, there was a high level of oversight from the client and regulatory agencies. The challenges involved with air sampling at this soil remediation site located in a suburban setting included the number of contaminants, the ranges of risks and hazards presented by the contaminants and the method of remediation, the concerns of the regulators and the public, and the perception of risk from the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning R and D at NNL - Characterisation, Decontamination and Deployment - 20091

Nuclear facilities frequently contain a wide range of different physical, chemical and radiological hazards post-operation which are regularly poorly characterised, difficult to access and in turn hard to decontaminate. NNL's Decontamination Science theme is striving to help facilitate faster, safer and cheaper decommissioning operations through the study contaminated materials and the development of innovative decommissioning technologies. Projects within the theme are developing a deeper understanding of the mechanisms in which materials (metal, concrete, plastics etc.) become contaminated. Methodologies of deploying novel characterisation and decontamination devices in-situ are also being produced and are being designed for deployment within existing plant infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Respirator Cartridge Performance on Mixed Vapors from Hanford Tank Headspaces and Exhausters - 20427

Between 2016 and 2018, the Hanford Tank Operations Contractor - Washington River Protection Solutions (WRPS) - conducted a series of tests of air-purifying respirator (APR) chemical cartridges commonly used at Hanford tank farms to determine the period of time for which the cartridges would provide adequate performance when used in APRs and powered-air-purifying respirators (PAPRs) to protect workers when exposed to a mixture of vapors exiting tank headspaces. Although cartridge manufacturers provide service life estimating tools for individual chemical compounds, the projected performance of these cartridges on complex vapor mixtures is not available, and the adequacy of APRs for tank farm applications represents an important workforce concern. The Occupational Safety and Health Administration identifies cartridge testing as a valid approach for establishing cartridge service life. The primary function of the WRPS Cartridge Test Program was to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford tank farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis of and recommendations based on respirator cartridge performance. A total of 28 APR and 10 PAPR cartridge tests were conducted between 2016 and 2018 on 12 different tank headspaces and tank farm exhauster slipstreams. Two APR cartridges from SCOTT (now 3M) and two PAPR cartridges from MSA Safety, Inc. and 3M were evaluated using a cartridge testing system specifically designed to measure and monitor test conditions and sample cartridge inlet and outlet vapor streams for important chemical compounds. Testing focused on analysis of approximately 61 tank vapor chemicals of potential concern (COPCs) that have been previously detected in tank vapors at levels above 10% of their occupational exposure limits (OELs). Each test was conducted over 16 hours of run time. Evidence of chemical breakthrough was assessed by comparing inlet and outlet COPC concentrations over the duration of each test. The breakthrough threshold was normally defined as exceeding 10% of the compounds OEL at the cartridge outlet. Ammonia breakthrough was observed in a majority of the cartridge tests and occurred earlier than breakthrough of any other chemical compound. Several other COPCs did exhibit breakthrough behavior, including mercury, 1,3-butadiene, furan, 2,5 dihydrofuran, and N-nitrosodimethylamine (NDMA), but only in a very limited number of cartridge tests and only after ammonia breakthrough had occurred. In addition, tests results suggest that breakthrough of some of these COPCs may have been affected by competition with and breakthrough of other non-COPC organics, such as ethanol and acetone, with substantially lower toxicological hazard. Comparison of cartridge manufacturers' service life estimates with the experimentally derived breakthrough times indicates that manufacturers' estimates are generally conservative, even in the presence of the complex mixed vapor streams experienced in these tests. With consideration of appropriate safety margins, these results provide valuable insights on cartridge performance to inform industrial hygiene professionals in establishing appropriate cartridge change-out schedules for APR and PAPR use in the Hanford tank farms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proven Technologies for the Solidification of Complex Liquid Radioactive Waste (LRW): Global Case Studies of Applications and Disposal Options - 20424

Legacy radioactive waste streams from the Cold War still exist and newly generated waste streams from nuclear power plants and research institutes go untreated and expose environmental hazards at many nuclear sites. The nature of the waste is diverse, depending upon the source or the process from which it originated. The most problematic waste streams include complex liquids such as organic (tri-butyl-phosphate TBP) solutions contaminated with Pu and U isotopes, mixed sludge types, high acid radioactive waste, H-3 contaminated organic and aqueous streams, etc. Technological, environmental and economic challenges exist for the treatment and disposal of such waste streams. A proven technology that has been applied to LRW on a global basis provides one option as a low-cost solution to legacy streams and small volume, highly complex LRW frequently found during decommissioning at nuclear power plants and weapons sites. The engineered polymer technology from Nochar, USA, is capable of solidifying standard and highly complex LLW and ILW waste streams for interim or final storage, or for incineration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Side Cesium Removal System Project and Technology Maturation Program - 20101

Washington River Protection Solutions (WRPS) is the Tank Operating Contractor (TOC) for the U.S. Department of Energy-Office of River Protection (DOE-ORP) on the Hanford Site. The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. WRPS is in the process of designing the Tank Side Cesium Removal (TSCR) system to produce a Low Activity Waste (LAW) feed from existing mixed Hanford tank waste. The LAW will be transferred to the Waste Treatment and Immobilization Plant (WTP) LAW Vitrification Facility, where it will be immobilized in a durable glass waste form for disposal. The TSCR Project demonstrates a tank-side treatment system for providing feed to the WTP LAW Vitrification Facility. This system removes undissolved solids and cesium from tank waste supernatant using non-elutable ion exchange media to meet the applicable waste acceptance criteria for the WTP. In support of the project, technology testing has been performed to answer design questions and reduce risk. The project scope and technology testing approach are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗