Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “QUALIFICATION PLUS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Development of the Orion Crew-Service Module Umbilical Retention and Release Mechanism

The Orion CSM umbilical retention and release mechanism supports and protects all of the cross-module commodities between the spacecrafts crew and service modules. These commodities include explosive transfer lines, wiring for power and data, and flexible hoses for ground purge and life support systems. The mechanism employs a single separation interface which is retained with pyrotechnically actuated separation bolts and supports roughly two dozen electrical and fluid connectors. When module separation is commanded, either for nominal on-orbit CONOPS or in the event of an abort, the mechanism must release the separation interface and sever all commodity connections within milliseconds of command receipt. There are a number of unique and novel aspects of the design solution developed by the Orion mechanisms team. The design is highly modular and can easily be adapted to other vehiclesmodules and alternate commodity sets. It will be flight tested during Orions Exploration Flight Test 1 (EFT-1) in 2014, and the Orion team anticipates reuse of the design for all future missions. The design packages fluid, electrical, and ordnance disconnects in a single separation interface. It supports abort separations even in cases where aerodynamic loading prevents the deployment of the umbilical arm. Unlike the Apollo CSM umbilical which was a destructive separation device, the Orion design is resettable and flight units can be tested for separation performance prior to flight.Initial development testing of the mechanisms separation interface resulted in binding failures due to connector misalignments. The separation interface was redesigned with a robust linear guide system, and the connector separation and boom deployment were separated into two discretely sequenced events. These changes addressed the root cause of the binding failure by providing better control of connector alignment. The new design was tuned and validated analytically via Monte Carlo simulation. The analytical validation was followed by a repeat of the initial test suite plus test cases at thermal extremes and test cases with imposed mechanical failures demonstrating fault tolerance. The mechanism was then exposed to the qualification vibration environment. Finally, separation testing was performed at full speed with live ordnance.All tests of the redesigned mechanism resulted in successful separation of the umbilical interface with adequate force margins and timing. The test data showed good agreement with the predictions of the Monte Carlo simulation. The simulation proved invaluable due to the number of variables affecting the separation and the uncertainty associated with each. The simulation allowed for rapid assessment of numerous trades and contingency scenarios, and can be easily reconfigured for varying commodity sets and connector layouts.

Separation↗

STS-51 pad abort. OV103-engine 2033 (ME-2) fuel flowmeter sensor open circuit

The STS-51 initial launch attempt of Discovery (OV-103) was terminated on KSC launch pad 39B on 12 Aug. 1993 at 9:12 AM E.S.T. due to a sensor redundancy failure in the liquid hydrogen system of ME-2 (Engine 2033). The event description and time line are summarized. Propellant loading was initiated on 12 Aug. 1993 at 12:00 AM EST. All space shuttle main engine (SSME) chill parameters and Launch Commit Criteria (LCC) were nominal. At engine start plus 1.34 seconds a Failure Identification (FID) was posted against Engine 2033 for exceeding the 1800 spin intra-channel (A1-A2) Fuel Flowrate sensor channel qualification limit. The engine was shut down at 1.50 seconds followed by Engines 2032 and 2030. All shut down sequences were nominal and the mission was safely aborted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 111-101, Fuel Flowrate Intra-Channel Test Channel A disqualification. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to an open circuit in a Fuel Flowrate Sensor. This type of failure has occurred eight previous times in ground testing. The sensor had performed acceptably on three previous flights of the engine and SSME flight history shows 684 combined fuel flow rate sensor channel flights without failure. The disqualification of an Engine 2 (SSME No. 2033) Fuel Flowrate sensor channel was a result of an instrumentation failure and not engine performance. All other engine operations were nominal. This disqualification resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

Auxiliary propulsion system flight package

Hughes Aircraft Company developed qualified and integrated flight, a flight test Ion Auxiliary Propulsion System (IAPS), on an Air Force technology satellite. The IAPS Flight Package consists of two identical Thruster Subsystems and a Diagnostic Subsystem. Each thruster subsystem (TSS) is comprised of an 8-cm ion Thruster-Gimbal-Beam Shield Unit (TGBSU); Power Electronics Unit; Digital Controller and Interface Unit (DCIU); and Propellant Tank, Valve and Feed Unit (PTVFU) plus the requisite cables. The Diagnostic Subsystem (DSS) includes four types of sensors for measuring the effect of the ion thrusters on the spacecraft and the surrounding plasma. Flight qualifications of IAPS, prior to installation on the spacecraft, consisted of performance, vibration and thermal-vacuum testing at the unit level, and thermal-vacuum testing at the subsystem level. Mutual compatibility between IAPS and the host spacecraft was demonstrated during a series of performance and environmental tests after the IAPS Flight Package was installed on the spacecraft. After a spacecraft acoustic test, performance of the ion thrusters was reverified by removing the TGBSUs for a thorough performance test at Hughes Research Laboratories (HRL). The TGBSUs were then reinstalled on the spacecraft. The IAPS Flight Package is ready for flight testing when Shuttle flights are resumed.

Collett, C. R.↗

Motor Qualification for Long-Duration Mars Missions

Qualification of motors for deep space under extreme thermal environments to be encountered during the Mars Science Laboratory (MSL) mission is required to verify the reliability and validate mission assurance requirements. The motor assembly must survive all ground operations, plus the nominal 670 Martian-day (or sol) mission that includes summer and winter seasons of the Mars environment. The motor assembly was tested and characterized under extreme temperature conditions with reference to hardware requirements. The motor assembly has been proved to be remarkably robust and displayed no sign of degradation due to the 3 X (three times per JPL design principles) thermal environmental exposure to the punishing Mars surface operations cycles. The motor characteristics obtained before, during, and post-test comparisons for the surface operations cycles are within measurement error of one another. The motors withstood/survived 2,010 extreme temperature cycles with a Delta T of 190 C deep temperature cycles, representing three times the expected thermal cycling exposure during the MSL surface operations. The qualification test hardware elements (A200 motor assembly, encoders, and resolver) have not shown any signs of degradation due to the PQV (Package Qualification and Verification) testing. The test hardware has demonstrated sufficient life to survive the deep thermal cycles associated with MSL mission surface operations for three lives.

Ramesham, Rajeshuni↗

Consolidated Development Objectives Document (CDOD) For MB-60

This document defines the objectives related to liquid rocket engine system development to be undertaken by JAXA in support of the Space Launch System (SLS) Program managed out of the NASA Marshall Space Flight Center (MSFC). These objectives include furnishing the necessary management, labor, facilities, tools, equipment, and materials required to execute the specified activities. 1.1 Project Scope: The scope of this effort is to develop a rocket engine and associated products per the objectives and technical requirements established in this document. This engine, minus the engine controller, designated here as MB ]60, is to be developed through to a prequalification point of maturity. It is assumed that should JCNE ]1 development proceed beyond this maturity point towards actual flight qualification, the engine controller will be supplied and integrated by NASA. 1.2 Document Structure: The structure of this Consolidated Development Objectives Document (CDOD) includes a traditional description of objectives in a SOO, plus the associated Data Products Document (DPD) in an attached appendix, and then Engine Requirements Document (ERD) as another attached appendix. It is the intent that this document, in conjunction with the cited applicable documents, should constitute a complete programmatic and technical description of the development effort to be pursued.

Greene, William D.↗

Environmental Test Screening Procedure

This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

Zeidler, Janet↗

Thermal Performance of LANDSAT-7 ETM+ Instruments During First Year in Flight

Landsat-7 was successfully launched into orbit on April 15, 1999. After devoting three months to the t bakeout and cool-down of the radiative cooler, and on- t orbit checkout, the Enhanced Thematic Mapper Plus (ETM+) began the normal imaging phase of the mission in mid-July 1999. This paper presents the thermal performance of the ETM+ from mid-July 1999 to mid-May 2000. The flight temperatures are compared to the yellow temperature limits, and worst cold case and worst hot case flight temperature predictions in the 15-orbit mission design profile. The flight temperature predictions were generated by a thermal model, which was correlated to the observatory thermal balance test data. The yellow temperature limits were derived from the flight temperature predictions, plus some margins. The yellow limits work well in flight, so that only several minor changes to them were needed. Overall, the flight temperatures and flight temperature predictions have good agreement. Based on the ETM+ thermal vacuum qualification test, new limits on the imaging time are proposed to increase the average duty cycle, and to resolve the problems experienced by the Mission Operation Team.

Choi, Michael K.↗

Coaxial Cables for Martian Extreme Temperature Environments

Work was conducted to validate the use of the rover external flexible coaxial cabling for space under the extreme environments to be encountered during the Mars Science Laboratory (MSL) mission. The antennas must survive all ground operations plus the nominal 670-Martian-day mission that includes summer and winter seasons of the Mars environment. Successful development of processes established coaxial cable hardware fatigue limits, which were well beyond the expected in-flight exposures. In keeping with traditional qualification philosophy, this was accomplished by subjecting flight-representative coaxial cables to temperature cycling of the same depth as expected in-flight, but for three times the expected number of in-flight thermal cycles. Insertion loss and return loss tests were performed on the coaxial cables during the thermal chamber breaks. A vector network analyzer was calibrated and operated over the operational frequency range 7.145 to 8.450 GHz. Even though some of the exposed cables function only at UHF frequencies (approximately 400 MHz), the testing was more sensitive, and extending the test range down to 400 MHz would have cost frequency resolution. The Gore flexible coaxial cables, which were the subject of these tests, proved to be robust and displayed no sign of degradation due to the 3X exposure to the punishing Mars surface operations cycles.

Ramesham, Rajeshuni↗

A Robust Assessment of High-Precision Plutonium Isotopic Analysis by Thermal Ionization Mass Spectrometry [Slides]

TIMS at SRNL • SRNL consolidated analytical laboratories and services into one area – loss of TIMS capability during relocation. • SRNL installed a new Thermo Scientific TRITON Plus TIMS in our Category II Nuclear Facility to re-establish the lab’s TIMS capabilities in Feb. 2024. • Allows for handling, preparation, purification, and analysis of high-level radiological materials within a single location • Pu and U isotopic composition and assay measurement qualification have been priority since installation. • Once the instrument has been qualified, this capability will support internal and external customers.

07 ISOTOPE AND RADIATION SOURCES↗

Glass Property Models and Constraints for Estimating the Glass to be Produced at Hanford by Implementing Current Advanced Glass Formulation Efforts

Recent glass formulation and melter testing data have suggested that significant increases in waste loading in HLW and LAW glasses are possible over current system planning estimates. The data (although limited in some cases) were evaluated to determine a set of constraints and models that could be used to estimate the maximum loading of specific waste compositions in glass. It is recommended that these models and constraints be used to estimate the likely HLW and LAW glass volumes that would result if the current glass formulation studies are successfully completed. It is recognized that some of the models are preliminary in nature and will change in the coming years. Plus the models do not currently address the prediction uncertainties that would be needed before they could be used in plant operations. The models and constraints are only meant to give an indication of rough glass volumes and are not intended to be used in plant operation or waste form qualification activities. A current research program is in place to develop the data, models, and uncertainty descriptions for that purpose. A fundamental tenet underlying the research reported in this document is to try to be less conservative than previous studies when developing constraints for estimating the glass to be produced by implementing current advanced glass formulation efforts. The less conservative approach documented herein should allow for the estimate of glass masses that may be realized if the current efforts in advanced glass formulations are completed over the coming years and are as successful as early indications suggest they may be. Because of this approach there is an unquantifiable uncertainty in the ultimate glass volume projections due to model prediction uncertainties that has to be considered along with other system uncertainties such as waste compositions and amounts to be immobilized, split factors between LAW and HLW, etc.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos Canyon Bridge Upgrades Project

Reinvestment in the Los Alamos Canyon Bridge (LACB) deck, superstructure, and substructure, ensures continued access between Los Alamos National Laboratory (LANL) and the Los Alamos County (LAC) town site; as well as maintains emergency response qualifications to/from the Los Alamos Medical Center (LAMC). The operability of the LACB is critical to the institution and with the evolving oversight from the Federal Highway Administration (FHWA), Department of Energy (DOE) Headquarters, and National Nuclear Security Administration (NNSA); it is imperative safety of the infrastructure is sustained. The Los Alamos Canyon Bridge is 60 plus years old (typical bridge design life of 50 years), a fracture critical structure (no girder redundancies), has an average daily traffic in excess of 13,000 vehicles/day (primary route for LAC commuters), is deteriorating (decreasing code ratings, per inspection), was last rehabilitated in 1992, and maintains access for fire evacuations (Cerro Grande, Las Conchas). Reinvestment in the bridge is expected to extend the service life of the LACB, reduce average maintenance costs by $0.5 M to $2.8M, per year, and provide compliance with current code requirements. Pros, cons, and proposed funding schedule are provided.

42 ENGINEERING↗

Towards a framework of nuclear competencies

For the countries considering the introduction of a nuclear energy program, the management of human resources should be a part of the wider integrated management system in order to ensure long term safe and reliable operation. Nuclear energy strategy and approaches to human resources development should take into consideration such fundamental aspects as: development and implementation of a workforce plan, required competencies and qualifications, prerequisites for staffing a nuclear energy program, needed training programs and training facilities, qualification and training requirements. Development of common instruments that respond to the above needs and vision has lead to a new concept of European Credit System for Vocational Education and Training. The European Credit System for Vocational Education and Training (ECVET) is based on definition of 'learning outcomes ' in terms of knowledge, skills and competence, and on identification of portfolios of learning outcomes that allow an individual to prove competencies in a coherent manner. ECVET proposes a common understanding of basic definitions of education and training as well as of the new proposed concepts and it should be recognized by all employers in the EU. In this context, a number of 'Euratom Fission Training Schemes' (EFTS) have been launched in specific areas where a shortage of skilled professionals has been identified. In these schemes the competence building is the result of traditional education plus life-long learning, non-traditional learning, and other forms of educational experiences, relying, in particular, on border-less mobility to get acquainted with various sectors. Each particular Training Scheme should follow a similar path for the achievement of the designed learning outcomes (knowledge, skills, and attitudes). This path to the Training Scheme consists of different activities regarding: definition of training scheme learning outcomes and modules, assessment of prerequisites and student selection, student interview for development of individual training plan, start of the training activities under a specific training scheme. The introduction and recognition of ECVET will lead to a common taxonomy of competencies, and will provide also information about qualifications and units in numerical form, enabling mutual recognition of a training scheme. The description of the learning outcomes to be achieved for qualifying to a specific job profile may follow the analysis phase of the systematic approach to training (SAT). This would ensure a common tool, already used by all trainers. All these steps contribute to establishing of a framework of nuclear competencies recognized and accepted throughout member states. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Block 4 solar cell module design and test specification for residential applications

Near-term design, qualification and acceptance requirements are provided for terrestrial solar cell modules suitable for incorporation in photovoltaic power sources (2 kW to 10 kW) applied to single family residential installations. Requirement levels and recommended design limits for selected performance criteria are specified for modules intended principally for rooftop installations. Modules satisfying the requirements of this specification fall into one of two categories, residential panel or residential shingle, both meeting general performance requirements plus additional category peculiar constraints.

Source record↗

International Ultraviolet Explorer (IUE) Battery History and Performance

The "International Ultraviolet Explorer (IUE) Battery History and Performance" report provides the information on the cell/battery design, battery performance during the thirty eight (38) solar eclipse seasons and the end-of-life test data. It is noteworthy that IUE spacecraft was an in-house project and that the batteries were designed, fabricated and tested (Qualification and Acceptance) at the Goddard Space Flight Center. A detailed information is given on the cell and battery design criteria and the designs, on the Qualification and the Acceptance tests, and on the cell life cycling tests. The environmental, thermal, and vibration tests were performed on the batteries at the battery level as well as with the interface on the spacecraft. The telemetry data were acquired, analyzed, and trended for various parameters over the mission life. Rigorous and diligent battery management programs were developed and implemented from time to time to extend the mission life over eighteen plus years. Prior to the termination of spacecraft operation, special tests were conducted to check the battery switching operation, battery residual capacity, third electrode performance and battery impedance.

Rao, Gopalskrishna M.↗

Amateur Radio on the International Space Station - Phase 2 Hardware System

The International Space Station (ISS) ham radio system has been on-orbit for over 3 years. Since its first use in November 2000, the first seven expedition crews and three Soyuz taxi crews have utilized the amateur radio station in the Functional Cargo Block (also referred to as the FGB or Zarya module) to talk to thousands of students in schools, to their families on Earth, and to amateur radio operators around the world. Early on, the Amateur Radio on the International Space Station (ARISS) international team devised a multi-phased hardware development approach for the ISS ham radio station. Three internal development Phases. Initial Phase 1, Mobile Radio Phase 2 and Permanently Mounted Phase 3 plus an externally mounted system, were proposed and agreed to by the ARISS team. The Phase 1 system hardware development which was started in 1996 has since been delivered to ISS. It is currently operational on 2 meters. The 70 cm system is expected to be installed and operated later this year. Since 2001, the ARISS international team have worked to bring the second generation ham system, called Phase 2, to flight qualification status. At this time, major portions of the Phase 2 hardware system have been delivered to ISS and will soon be installed and checked out. This paper intends to provide an overview of the Phase 1 system for background and then describe the capabilities of the Phase 2 radio system. It will also describe the current plans to finalize the Phase 1 and Phase 2 testing in Russia and outlines the plans to bring the Phase 2 hardware system to full operation.

Bauer, F.↗

The Plasma Interaction Experiment /PIX/ - Description and flight qualification test program

The Plasma Interaction Experiment (PIX) is a battery powered preprogrammed auxiliary payload on the Landsat-C launch. This experiment is part of a larger program to investigate space plasma interactions with spacecraft surfaces and components. The varying plasma densities encountered during available telemetry coverage periods are deemed sufficient to determine first order interactions between the space plasma environment and the biased experimental surfaces. The specific objectives of the PIX flight experiment are to measure the plasma coupling current and the negative voltage breakdown characteristics of a solar array segment and a gold plated steel disk. Measurements will be made over a range of surface voltages up to plus or minus 1 kilovolt. The orbital environment will provide a range of plasma densities. The experimental surfaces will be voltage-biased in a preprogrammed step sequence to optimize the data returned for each plasma region and for the available telemetry coverage.

Ignaczak, L. R.↗

Fabrication Status of ITER Central Solenoid Modules

The fabrication of the modules for the ITER Central Solenoid (CS) is in progress at General Atomics (GA) in Poway, California, USA. This purpose built facility has been established with the requisite tools and machines to fabricate the seven 110 tonne CS modules (six required plus one spare). GA’s project responsibility is completing the fabrication design, developing and qualifying the fabrication processes and tools, fabricating the seven modules, and testing the modules at 4.5 K with full current. The current schedule has the first module’s completing fabrication in 2018 followed by electrical and full current testing. Upon completion of testing, the modules will be shipped to the ITER site for assembly into the CS stack. GA has co mpleted the fabrication of a qualification coil, simulating all of the processes and exercising all of the tooling required to fabricate a production module. After completion, the qualification coil underwent a cool down cycle to 4.5K which served as the final commissioning step of the helium cooling system on the parallel flow paths of a module. In addition, other final test station systems and procedures were simulated to verify their functionality including simulated critical current sharing temperature (Tcs) measurements, DC switch operation to dump the energy from the coil, and a helium leak test on the coil at <10K. After warming the coil, Paschen tests were repeated prior to the coil being dissected to evaluate the quality of the vacuum pressure impregnation (VPI). Dissection is scheduled for early spring 2018 and the results showed full resin impregnation of all areas. In the production and testing of the qualification coil, many lessons were learned and the improvements incorporated into the module fabrication processes. GA currently has five production modules in fabrication, at different stages in the process. The first module is nearly ready for vacuum pressure impregnation. The second and third modules are currently in the insulation process and the 7 pancakes of the forth module are being joined together into a 110 tonne module. Module 5 is currently being wound. The qualification coil has been completed and dissected to evaluate the VPI. A description of the VPI process is provided. To verify the turn insulation of a module, unique impulse testing methods were developed to test the insulation between the 560 turns of a module. These methods are reported in this paper.

Smith, J.↗

Voyager spacecraft attitude control propulsion system post-launch performance requirements changes

A test program aimed at the re-qualification of the 0.2-lbf attitude control thruster of the Voyager 2 spacecraft was carried out while the spacecraft was in flight on an interplanetary trajectory to Uranus. The objective of the program was to determine if the 0.2-lbf thruster could be successfully and repeatedly fired at pulse widths of less than the standard minimum pulse width of 10 milliseconds with no degradation. It was demonstrated that the thruster was qualified for short pulse operation at pulse widths of 4 ms or greater. Pulse widths of 4.0 ms provide an impulse bit of approximately 45 percent of the impulse provided by a 10-ms pulse, and the pulse-to-pulse and unit-to-unit variation is approximately plus or minus 10 percent.

Groudle, T. A.↗