Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Projections of H-mode access and edge pedestal in the SPARC tokamak

In order to inform core performance projections and divertor design, the baseline SPARC tokamak plasma discharge is evaluated for its expected H-mode access, pedestal pressure and edge-localized mode (ELM) characteristics. A clear window for H-mode access is predicted for full field DT plasmas, with the available 25 MW of design auxiliary power. Additional alpha heating is likely needed for H-mode sustainment. Pressure pedestal predictions in the developed H-mode are surveyed using the EPED model. The projected SPARC pedestal would be limited dominantly by peeling modes and may achieve pressures in excess of 0.3 MPa at a density of approximately 3 × 10 20 m -3 . High pedestal pressure is partially enabled by strong equilibrium shaping, which has been increased as part of recent design iterations. Edge-localized modes (ELMs) with >1 MJ of energy are projected, and approaches for reducing the ELM size, and thus the peak energy fluence to divertor surfaces, are under consideration. The high pedestal predicted for SPARC provides ample margin to satisfy its high fusion gain (Q) mission, so that even if ELM mitigation techniques result in a 2x reduction of the pedestal pressure, Q > 2 is still predicted.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Terrestrial laser scanning data (Levels 0 and 1) from Urban Biogeochemistry Pilot Project sites, Knoxville, Tennessee, Jul 2024 - Jul 2025

This data package contains data from terrestrial laser scanning (TLS) at five urban park sites in Knoxville, Tennessee, USA. All parks include open-grown and/or closed-canopy trees and mixed nearby land use. These study sites were established as part of the Urban Biogeochemistry Pilot Project, which has an overall goal of better understanding how hydrobiogeochemical cycling is altered within the human environment. These five sites represent a gradient of urbanization, and were instrumented to understand hydrological and biogeochemical cycling (e.g., soil moisture, soil physical properties and biogeochemistry, tree transpiration, species type). The TLS data archived here were collected to provide detailed, three-dimensional information about forest structure. Specifically, data were collected to allow tree- and stand-level characterization of woody structure and leaf area. TLS scans were placed to capture the area around trees with sap flow sensors, and as much of a 50 m radius area around the meteorological station as possible given site property limits. Derived products will allow upscaling of water content and transpiration data. This data package contains the following data: - High-level files document further details of the campaign and data package: 1_CampaignSummary.csv provides details about the campaign and study site, 2_ScanAreasDetail.csv provides details about each separate scan area (groups of scans post-processed into a single point cloud), 3_TerrestrialLidarSensor.csv provides further technical details about the Riegl VZ-400i TLS sensor, TLS_CSV_dd.csv is a CSV Data Dictionary providing information about the fields in CSV files following the ESS-DIVE CSV File Formatting Guidelines Reporting Format, TLS_flmd.csv is a File Level Metadata file providing information about each file in the data package following the ESS-DIVE File Level Metadata Reporting Format, and README.txt is a text file describing the overall project and file structure. - Level 0 data are the raw data (.PROJ folders) as recorded by the Riegl VZ-400i TLS instrument before scan co-registration and post-processing with the Riegl's proprietary RiSCAN PRO software, which requires a license. - Level 1 data contain post-processed, co-registered data from each scan area. The "PointClouds" folder for each scan area contains a .las file with 1 cm resolution point cloud data exported from RiSCAN PRO. These are the main files likely to be of interest to most users and can be further processed with any software capable of manipulating .las files (e.g. Python, R CloudCompare). The "Project Information" folder contains log files from post-processing in RiSCAN PRO that may be of interest to users who want to see detailed records of post-processing, including all PDF reports generated by RiSCAN PRO. The "ScanPositions" folder contains information about the final position of all TLS scans, after post-processing, in multiple formats. The file ScanPositions_*.csv provides final geo-referenced scan positions, and the file SOP_backup_*.csv can be used in RiSCAN PRO to restore the co-registered scan positions if users wish to re-process raw data (Level 0 .PROJ folders) with RiSCAN PRO software (e.g., subsample to a different resolution, exclude a certain scan position, or apply different filters on reflectance or deviation values) without redoing time-consuming co-registration steps.

54 ENVIRONMENTAL SCIENCES↗

CMIP6-based Multi-model Hydropower Projection over the Conterminous US, Version 1.1

This dataset presents a suite of hydropower projections for the conterminous United States (CONUS), derived from multiple downscaled and bias-corrected Global Climate Models (GCMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). The CMIP6 GCMs are downscaled using either statistical (DBCCA) or dynamical (RegCM) approaches, based on two meteorological reference datasets (Daymet and Livneh). The resulting downscaled precipitation, temperature, and wind speed data are then used to drive two calibrated hydrologic models (VIC and PRMS), enabling simulations of projected future hydrologic responses across the CONUS. Simulated total runoff is subsequently employed to drive two hydropower models (WMP, now implemented as mosartwmpy-power, and WRES) to evaluate how climate change may affect future hydropower production for both federal and non-federal hydropower fleets. This dataset was developed to support the SECURE Water Act Section 9505 Assessment for the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, see Broman et al. (2024), Thurber et al. (2024), Kao et al. (2022), and Zhou et al. (2023).

Voisin, Nathalie [Pacific Northwest National Labor↗

The Astropy Project: Sustaining and Growing a Community-oriented Open-source Project and the Latest Major Release (v5.0) of the Core Package

The Astropy Project supports and fosters the development of open-source and openly developed Python packages that provide commonly needed functionality to the astronomical community. A key element of the Astropy Project is the core package astropy, which serves as the foundation for more specialized projects and packages. In this article, we summarize key features in the core package as of the recent major release, version 5.0, and provide major updates on the Project. We then discuss supporting a broader ecosystem of interoperable packages, including connections with several astronomical observatories and missions. We also revisit the future outlook of the Astropy Project and the current status of Learn Astropy. We conclude by raising and discussing the current and future challenges facing the Project.

79 ASTRONOMY AND ASTROPHYSICS↗

E2C Successful Project Implementation Cohort: Overview of Solar, Microgrid and Resilience Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing solar, microgrid and resilience projects with emphasis on understanding the project development process.

14 SOLAR ENERGY↗

Flat-plate solar array project. Volume 8: Project analysis and integration

Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

Mcguire, P.↗

Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

Depenbrock, Brett T.↗

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state-of-the-art knowledge in an internally self-consistent modelling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain-specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low-emissions SSP1-1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850-1900, using an observationally-based historical warming estimate of 0.8°C between 1850-1900 and 1995-2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above pre-industrial in the long-term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

Climate↗

Climate model projections from the Scenario Model Intercomparison Project (ScenarioMIP) of CMIP6

The Scenario Model Intercomparison Project (ScenarioMIP) defines and coordinates the main set of future climate projections, based on concentration-driven simulations, within the Coupled Model Intercomparison Project phase 6 (CMIP6). This paper presents a range of its outcomes by synthesizing results from the participating global coupled Earth system models. We limit our scope to the analysis of strictly geophysical outcomes: mainly global averages and spatial patterns of change for surface air temperature and precipitation. We also compare CMIP6 projections to CMIP5 results, especially for those scenarios that were designed to provide continuity across the CMIP phases, at the same time highlighting important differences in forcing composition, as well as in results. The range of future temperature and precipitation changes by the end of the century (2081–2100) encompassing the Tier 1 experiments based on the Shared Socioeconomic Pathway (SSP) scenarios (SSP1-2.6, SSP2-4.5, SSP3-7.0 and SSP5-8.5) and SSP1-1.9 spans a larger range of outcomes compared to CMIP5, due to higher warming (by close to 1.5 °C) reached at the upper end of the 5 %–95 % envelope of the highest scenario (SSP5-8.5). This is due to both the wider range of radiative forcing that the new scenarios cover and the higher climate sensitivities in some of the new models compared to their CMIP5 predecessors. Spatial patterns of change for temperature and precipitation averaged over models and scenarios have familiar features, and an analysis of their variations confirms model structural differences to be the dominant source of uncertainty. Models also differ with respect to the size and evolution of internal variability as measured by individual models' initial condition ensemble spreads, according to a set of initial condition ensemble simulations available under SSP3-7.0. These experiments suggest a tendency for internal variability to decrease along the course of the century in this scenario, a result that will benefit from further analysis over a larger set of models. Benefits of mitigation, all else being equal in terms of societal drivers, appear clearly when comparing scenarios developed under the same SSP but to which different degrees of mitigation have been applied. It is also found that a mild overshoot in temperature of a few decades around mid-century, as represented in SSP5-3.4OS, does not affect the end outcome of temperature and precipitation changes by 2100, which return to the same levels as those reached by the gradually increasing SSP4-3.4 (not erasing the possibility, however, that other aspects of the system may not be as easily reversible). Central estimates of the time at which the ensemble means of the different scenarios reach a given warming level might be biased by the inclusion of models that have shown faster warming in the historical period than the observed. Those estimates show all scenarios reaching 1.5 °C of warming compared to the 1850–1900 baseline in the second half of the current decade, with the time span between slow and fast warming covering between 20 and 27 years from present. The warming level of 2 °C of warming is reached as early as 2039 by the ensemble mean under SSP5-8.5 but as late as the mid-2060s under SSP1-2.6. The highest warming level considered (5 °C) is reached by the ensemble mean only under SSP5-8.5 and not until the mid-2090s.d-2090s.

Scenario Model Intercomparison Project (ScenarioMI↗

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Abstract Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state‐of‐the‐art knowledge in an internally self‐consistent modeling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain‐specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low‐emissions SSP1‐1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850–1900, using an observationally based historical warming estimate of 0.8°C between 1850–1900 and 1995–2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above preindustrial in the long‐term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

54 ENVIRONMENTAL SCIENCES↗

Visual Impact Assessment of the Energetic Materials Complex Construction Project on Manhattan Project–Era Historic Properties, the TA-06-0037 Concrete Bowl, and the TA-22-0001 Quonset Hut

Concern for potential visual effects to historic Manhattan Project–era properties emerged early in the planning and consultation phase for the upcoming Energetic Materials Complex (EMC) construction project. In initial discussions with project managers and design team members, resource managers became aware of the need to consider potential impacts to the viewsheds of two nearby properties that are eligible for inclusion in the Manhattan Project National Historical Park (MAPR). Resource managers recognized that viewshed characteristics important to the integrity of the Concrete Bowl (Technical Area [TA-]06-0037) and the Quonset Hut (TA-22-0001) conceivably faced the prospect of lasting and irreversible visual impacts. A strategy to gather necessary data soon emerged. The approach presented to the New Mexico State Historic Preservation Officer (SHPO) on April 7, 2021, combined gathering baseline information from field visits with a geographic information system (GIS)-supported viewshed analysis. Accordingly, results from the viewshed analysis would help resource managers determine if a more comprehensive visual impact assessment (VIA) would be needed. If necessitated by the outcome of the GIS viewshed analysis, initial consultation with the SHPO specified the production of a VIA that would explore any potential visual adverse impacts to the Concrete Bowl and the Quonset Hut. Cultural resources and GIS specialists with the Laboratory performed a viewshed analysis shortly after consultation with the SHPO. The analysis indicated a high likelihood that at least one of the two Manhattan Project–era properties would experience at least a minimal level of visual impact and that a VIA would be needed. The resulting analysis provides a description of the undertaking, an account of the properties affected along with an evaluation of historical significance, an examination of potential visual impacts, and a determination of effect to the identified historic properties.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managing a project's legacy: implications for organizations and project management

Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

risk management↗

Large-scale features of Last Interglacial climate: results from evaluating the lig127k simulations for the Coupled Model Intercomparison Project (CMIP6)–Paleoclimate Modeling Intercomparison Project (PMIP4)

The modeling of paleoclimate, using physically based tools, is increasingly seen as a strong out-of-sample test of the models that are used for the projection of future climate changes. New to the Coupled Model Intercomparison Project (CMIP6) is the Tier 1 Last Interglacial experiment for 127 000 years ago (lig127k), designed to address the climate responses to stronger orbital forcing than the midHolocene experiment, using the same state-of-the-art models as for the future and following a common experimental protocol. Here we present a first analysis of a multi-model ensemble of 17 climate models, all of which have completed the CMIP6 DECK (Diagnostic, Evaluation and Characterization of Klima) experiments. The equilibrium climate sensitivity (ECS) of these models varies from 1.8 to 5.6°C. The seasonal character of the insolation anomalies results in strong summer warming over the Northern Hemisphere continents in the lig127k ensemble as compared to the CMIP6 piControl and much-reduced minimum sea ice in the Arctic. The multi-model results indicate enhanced summer monsoonal precipitation in the Northern Hemisphere and reductions in the Southern Hemisphere. These responses are greater in the lig127k than the CMIP6 midHolocene simulations as expected from the larger insolation anomalies at 127 than 6 ka. New synthesis for surface temperature and precipitation, targeted for 127 ka, have been developed for comparison to the multi-model ensemble. The lig127k model ensemble and data reconstructions are in good agreement for summer temperature anomalies over Canada, Scandinavia, and the North Atlantic and for precipitation over the Northern Hemisphere continents. The model–data comparisons and mismatches point to further study of the sensitivity of the simulations to uncertainties in the boundary conditions and of the uncertainties and sparse coverage in current proxy reconstructions. The CMIP6–Paleoclimate Modeling Intercomparison Project (PMIP4) lig127k simulations, in combination with the proxy record, improve our confidence in future projections of monsoons, surface temperature, and Arctic sea ice, thus providing a key target for model evaluation and optimization.

Last Interglacial climate↗

CMIP6-based Dynamically Downscaled Hydroclimate Projection over the Conterminous US

This dataset presents a suite of downscaled hydro-climate projections over the conterminous United States (CONUS) based on multiple selected Global Climate Models (GCMs) from the Coupled Models Intercomparison Project phase 6 (CMIP6). The CMIP6 GCMs are downscaled dynamically using Regional Climate Model version 4 (RegCM4). Each ensemble member covers the 1980-2019 baseline and 2020-2059 near-future periods under the high-end (SSP585) emission scenario. This dataset is formulated to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details on this dataset, please refer to Kao et al. (2022) and Rastogi et al. (2022).

13 HYDRO ENERGY↗

Highly Resolved Reference Projections of Building Energy Use for the Contiguous United States: Building Sector Energy Baselines, Projection Methods, and Results

This report describes one methodology of projecting energy consumption of the US residential and commercial building sectors using NREL's ResStock™ and ComStock™ as well as growth rates derived from EIA's Annual Energy Outlook (AEO). The impetus for this work is to provide an intermediate method for compiling demand-side sectoral energy projections that is suitable for grid-scale analysis, such as NREL's Standard Scenarios. ResStock and ComStock are physics-based and statistically representative building stock models of the US residential and commercial sector, respectively. Using the 2012 actual meteorological year (AMY) weather data, the sectoral energy baselines are simulated and then segmented along key dimensions (e.g., geography, dwelling/building type). The segmented results are then scaled using the corresponding annual growth rates derived from the 2021 AEO reference case to produce energy projections out to 2050. The compiled result is a demand-side grid model (dsgrid) data set suitable for use in NREL's large-scale grid models, such as the Regional Energy Deployment System (ReEDS). This simple projection method does not endogenously represent how the building stock could evolve through time. Most notably, it does not reflect large-scale electrification, for example, the conversion of space heating, water heating, clothes drying, and cooking from primary fossil fuels to electricity, as this is not part of AEO's reference case assumptions. Nonetheless this approach is more resolved and potentially extensible compared to the current method used by Standard Scenarios's reference case, which augments a sector's total load based on a single growth rate from AEO.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind ramp events validation in NWP forecast models during the second Wind Forecast Improvement Project (WFIP2) using the Ramp Tool and Metric (RT&M)

The second Wind Forecast Improvement Project (WFIP2) is a multi-agency field campaign held in the Columbia Gorge area (October 2015 - March 2017). The main goal of the project is to understand and improve the forecast skill of numerical weather prediction (NWP) models in complex terrain, particularly beneficial for the wind energy industry. This region is well-known for its excellent wind resource. One of the biggest challenges for wind power production is the accurate forecasting of wind ramp events (large changes of generated power over short periods of time). Poor forecasting of the ramps requires large and sudden adjustments in conventional power generation, ultimately increasing the costs of power. A Ramp Tool and Metric (RT&M) was developed during the first WFIP experiment, held in the U.S. Great Plains (September 2011 - August 2012). The RT&M was designed to explicitly measure the skill of NWP models at forecasting wind ramp events. Here we apply the RT&M to 80-m (turbine hub-height) wind speeds measured by 19 sodars and 3 lidars, and to forecasts from the High Resolution Rapid Refresh (HRRR), 3-km, and from the High Resolution Rapid Refresh Nest (HRRRNEST), 750-m horizontal grid spacing, models. The diurnal and seasonal distribution of ramp events are analyzed, finding a noticeable diurnal variability for spring and summer but less for fall and especially winter. Also, winter has fewer ramps compared to the other seasons. The model skill at forecasting ramp events, including the impact of the modification to the model physical parameterizations, was finally investigated.

Djalalova, Irina V.↗