Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

IBPSA Project 2 BOPTEST: An update on the test cases available in the framework for testing advanced control strategies in buildings

Project 2 develops software infrastructure, test cases, and extensions for the Building Optimization Testing Framework (BOPTEST) to address the expanding needs of building and urban energy system controls through open international collaboration. This paper provides an overview of the new test cases available as of BOPTEST version 0.7.1. Each test case is developed using open-source Modelica libraries and Spawn of EnergyPlus, enabling the creation of high-fidelity building models that incorporate envelope dynamics, Heating Ventilation and Air Conditioning (HVAC) systems, and explicit control representations. Currently, eight test cases are available, with five additional cases under development. These test cases cover a wide range of climates, building types, and HVAC systems. This paper compiles and summarizes test case descriptions, cites original manuscripts that developed them for a more detailed description, and reports baseline control performance metrics. Furthermore, two example applications are presented: one illustrating different levels of control, from supervisory to low-level, and another demonstrating how Model Predictive Control (MPC) solutions must be adapted from continuous to integer to control some building actuators.

Zanetti, Ettore

National Energy Education Development Project (NEED Project) (CRADA Final Report)

The U.S. Department of Energy Building Technologies Office (BTO) funds student competitions that introduce students to careers in the building sciences and increase public awareness around high-performance buildings to support the goal of developing, demonstrating, and accelerating the adoption of cost-effective technologies, techniques, tools, and services that enable high-performing, energy-efficient and demand-flexible residential and commercial buildings in both the new and existing buildings markets. The U.S. Department of Energy Solar Decathlon® (DOE/SD) is a flagship, high-visibility international competition started in 2002 that advances the goals of BTO by introducing students to building science careers; educating students and the public about the latest technologies and materials in high-performance buildings; encouraging student-led projects and research centered around building science; and demonstrating to the public the comfort and savings of homes that combine energy-efficient construction, home systems, appliances and innovative design with onsite renewable energy production. SD is a collegiate competition, comprising 10 contests, that challenges student teams to design and build highly efficient and innovative buildings powered by renewable energy. The winners will be those teams that best blend architectural and engineering excellence with innovation, market potential, building efficiency, and smart energy production. Solar Decathlon is comprised of two Challenges – Design Challenge (annual) and Build Challenge (biennial). The National Renewable Energy Laboratory (NREL) provides competition management for Solar Decathlon. NREL and Participant establish this CRADA to enable the success of the overall Solar Decathlon program by managing sponsorship funds and creating a K12 education program. Participant is to act as an Education Partner to Solar Decathlon, which includes: 1) accepting and dispersing sponsorship funds for DOE/SD; and 2) providing K12 education program to support Solar Decathlon Competition Events in April each year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

NW-BRaVE T3 Hydroplane Project Close: Project Close-out for T3 Hydroplane Analysis

Thrust 3 of the Northwest Biopreparedness Research in a Virtual Environment was an expansive project including method development, sample collection and sequence analysis. The sampling occurred over a multi-year period to generate metagenomic datasets that inform cyanophage-picocyanobacterial interactions in the Salish Sea across a moderate timeframe and geographical range. Part of the thrust’s aim was to validate how much experimental structural and multiomics work in a model organism (Prochlorococcus Marinus, str. MED4) from thrusts 1 and 2 would carry over into a broader range of related organisms in the natural world, to address a fundamental question in scientific preparation for epidemics: whether and how much experimental information from known and experimentally tractable species can translate to actionable biological information in unknown species. In other words, thrust 3 aimed to find out whether the model organism experiments matter in terms of how organisms interact. This report updates work described in Johnson and Pollock 2025 (1).

54 ENVIRONMENTAL SCIENCES

Project 2.8: Biological Specimen Repository for the Mayak Project

Curation of the existing specimens, including Standard Operating Procedures: The Southern Urals Biophysics Institute (SUBI) will continue to manage the day-to-day operations of the biorepository, but will have to assume the financial costs of maintaining and purchasing equipment such as freezers; Standard Operating Procedures are already in place for all aspects of the operations, and the Georgetown University team will be available on a voluntary and ad hoc basis to answer any technical questions in the future. Acquisition and tracking of new specimens: SUBI will decide on the collection of new tissues and blood samples in the future, and on what scale, depending on available resources and research needs. The Georgetown University team is willing to provide advice on a voluntary and ad hoc basis. Procedures for receiving and approving specimen requests from users: SUBI can take over this function; Chris Loffredo and other qualified research scientists at Georgetown University would be willing to serve as Tissue Review Committee members on a voluntary and ad hoc basis. Biospecimens remaining at Georgetown University: pursuant to the original terms of the Biospecimen Transfer Agreement between SUBI and Georgetown University, all unused portions of specimens (FFPE blocks, slides, and frozen tissues) will be returned to SUBI at the conclusion of the approved scientific research for which they were transferred. It was anticipated that the return shipment of biospecimens would occur in the fall of 2023. However, at this time, due to international developments, there are no shipping companies who can provide such deliveries to Russia. For now, the biospecimens can remain at Georgetown University where they are stored at the Genomics and Epigenomics Shared Resource. There have not been any storage costs to date, but this could change in the future.

59 BASIC BIOLOGICAL SCIENCES

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects (Final Technical Report)

The number of commercial coal, gas, and nuclear projects built over the past 100 years number in the thousands. As such, there is a large database, available to a wide range of commercial engineering contractors, on proven designs. In essence, unsuccessful designs have, through generations of iterations, been identified and then deleted from further consideration. In contrast, the number of commercial parabolic trough projects using nitrate salt for the thermal storage media is perhaps 60. Further, the number of commercial central receiver projects using nitrate salt as the working fluid is on the order of 20, including estimates for China. Given the relative immaturity of salt technology, and commercial pressures to successfully bid new solar projects into a mature electricity market, solar projects often promise more than has been delivered. The Design Basis Document / Owner’s Technical Specification is a first step in the iteration process. The report describes the successful features of commercial projects, outlines a range equipment and system failures in projects that didn’t operate as intended, and provides a draft set of design changes intended to correct the known problems. The product of the study is 3 volumes of technical material; one volume is on parabolic trough technologies; a second is on central receiver technologies, and the third is on potential design changes to parabolic trough and central receiver projects. The 3 volumes, which total some 590 pages, can be found at https://www.solardynllc.com/csp-plant-technologies. One of the principal topics in the report is the use of functional or prescriptive specifications. Functional specifications describe what the equipment needs to do, consistent with the minimum legal requirements of the local jurisdictions. The details of how this is to be accomplished is developed by the engineering contractor. Prescriptive specifications, which are developed by the Owner, prescribe to the engineering contractor how the functional requirements are to be met. This arrangement ensures that the favorable experience from a previous project is repeated. One example is the design code for the hot salt tank in central receiver projects. The closest design basis is API Standard 650 Welded Steel Tanks for Oil Storage. However, the maximum design temperature in API 650 is 260 °C. As such, solar projects have typically adopted a hybrid Code approach, in which allowable material stresses are taken from ASME Section II Materials. Further, since the tanks experience daily changes in temperature and in (static) pressure, and since portions of the tank can operate at stresses beyond the elastic range, the low cycle fatigue life of the tank is conducted using the rules of Section VIII Division 2. However, in a recent study by NREL, the principal damage mechanism was identified as creep rather than fatigue. Further, design stresses permitted under Section VIII Division 2, corresponding to a fatigue life of 30 years, result in projected creep lifetimes of only 2 to 5 years. An alternate design approach, prescribed by the Owner, would be based on Code sections intended for high temperature service in the creep regime. A candidate is Section III Division 5. Granted, this is a nuclear code section, and it’s use would not likely be mandated by local jurisdictions. However, the effects of creep have been deemed to be of sufficient importance that one nuclear project developer, and one central receiver project developer, have stipulated in the tank design specification that the equipment be designed to the requirements of Section III Division 5.

14 SOLAR ENERGY

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS

IM3 + EPRI Data Center Load Projections

This dataset contains scenarios of hourly total electricity demand with and without projected loads from data centers over the period 2022-2040. The root projections without data center demands are identical to those documented in Burleyson et al. 2024. In short, those projections encompass hourly electricity demands for 54 Balancing Authorities (BAs) in the United States across a range of eight of weather and socioeconomic scenarios. Refer to the root dataset and accompanying publication, Burleyson et al. 2025, for information about how those projections were generated. For this derivative dataset we used the base loads from the following scenarios: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The root load projections did not reflect the drastic expansion of data centers that has occurred in the last several years to support artificial intelligence and cloud computing. To reflect growth in data center demand, a second set of load projections were created in which we layered in additional data center load projections based on the data center load growth scenarios described in a 2024 report by the Electric Power Research Institute (EPRI): "Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption". The EPRI projections from the report are included in this dataset (EPRI_2024_Projections.xlsx). That report contained annual state-level data center load projections for four year-over-year growth rates for data center demands: Low (3.71% annual growth) Moderate (5% annual growth) High (10% annual growth) Higher (15% annual growth) To homogenize the load projections with and without data centers we had to get them to a common scale. The first step was to take the EPRI annual state-level data center energy consumption values and convert them to 8760-hr loads for each year. We did that by assuming a flat (e.g., not weather- or time-sensitive) load profile and distributing the data center loads in each state evenly across all hours in a year. From there the loads were downscaled from the state-level to the county-level using 2019 county-level populations as weights. Finally, the county-level hourly data center loads were summed to the BA-level using the county-to-BA mapping underpinning the root load projections. The net result is 16 (4 weather and socioeconomic scenarios crossed with 4 data center load growth scenarios) unique load projections for the period 2022-2040. The file format follows that of the root dataset with a single additional column "Scaled_TELL_BA_Load_with_DC_MWh" that contains the hourly loads with the added data center loads for a given BA-year-scenario combination. Please refer to the readme file in the root dataset for more information on the file format.

Burleyson, Casey [Pacific Northwest National Labor

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND

Bias Correction and Statistical Downscaling of Future Solar Irradiance Projections Using the NSRDB

Assessing renewable energy resources under future climate scenarios has been highlighted to understand potential impacts of future climate change in renewable generation on the power sector. Climate model projection has been recognized by the renewable energy community as a useful data set to analyze the impacts of future climate change on renewable resources. However, future climate projections generated from general circulation models (GCMs) contain inherent biases that need to be corrected for accurate analysis of future projections of climate variables. In addition, the coarse spatiotemporal resolution of GCMs needs to be improved for regional climate studies. In this work, we develop statistical methods to downscale future projections of global horizontal irradiance (GHI) in a computationally efficient way. Our approach builds statistical downscaling models that correct bias of climate projection of GHI and downscale the future GHI projection from daily-scale to hourly-scale. The National Solar Radiation Database (NSRDB) is used to calibrate the statistical models and validate the downscaled GHI projections across the contiguous United State (CONUS). Preliminary results show that the statistical approach efficiently downscales climate projections of GHI with a nBIAS of 3%, nMAE of 34 % and nRMSE of 46% calculated against NSRDB for CONUS. This study describes the implemented methodology and initial results as well as future research to create high-resolution climate data sets for solar energy applications.

analytical models

Final DOE-ASR Report for the Project “Using LASSO to bridge the gap between model and observations and to learn about atmospheric convection”

Atmospheric convection spans a wide range of spatial and temporal scales and involves complex interactions with the surrounding dynamic and thermodynamic environment, particularly over tropical continental regions. These processes remain a major source of uncertainty in weather and climate models, including persistent biases in the diurnal cycle of convective precipitation that directly affect estimates of climate sensitivity. Addressing these challenges requires the combined use of high-resolution observations and cloud-resolving modeling frameworks. In this context, the DOE Atmospheric Radiation Measurement (ARM) program’s Large-Eddy Simulation ARM Symbiotic Simulation and Observation (LASSO) activity provides a powerful platform that pairs comprehensive observations with numerical simulations to enable process-level understanding of atmospheric convection. Within this context, this Research and Development Partnership Pilot (RDPP) project was designed to initiate and expand DOE ARM/ASR research capacity at minority-serving institutions, while advancing scientific understanding of convective processes over the Amazon rainforest. Consistent with the RDPP mission, the project emphasized partnership development, training, and workforce capacity building alongside exploratory research activities. On the scientific side, the project produced two peer-reviewed journal articles, and one manuscript currently under review (see list in section 3.1). Together, these studies combine long-term ARM observations and cloud-resolving and convection-permitting modeling to investigate the environmental controls on the shallow-to-deep convective transition during the Amazon wet season. The results demonstrate the central role of early-day moisture preconditioning and large-scale dynamical forcing in regulating isolated deep convection, provide mechanistic insight into convective evolution, and establish physically informed modeling frameworks for future sensitivity experiments. These scientific outcomes are described in sections 2.1 to 2.3 and were disseminated in 8 conference presentations (see section 3.2) and 5 invited talks (see section 3.3), reflecting broad engagement with our community. Equally important, the project achieved its RDPP capacity-building objectives (see section 2.4). A sustained research partnership was established among the University of Maryland, Baltimore County (UMBC), Morgan State University (MSU), and Howard University (HU), and extended to include collaboration with Pacific Northwest National Laboratory (PNNL). The project organized multiple multi-day training events focused on ARM data, LASSO simulations, and quantitative analysis methods, directly engaging students, postdoctoral researchers, and faculty across institutions. These activities broadened participation in ASR research and led to independent adoption of LASSO workflows by students beyond the immediate project team. Finally, the project successfully positioned the participating institutions to pursue future DOE research. Preliminary scientific results, coupled with strengthened partnerships and technical capacity, enabled the submission of follow-on proposals to DOE ASR funding opportunities. In this way, the project fulfilled the RDPP goal of seeding durable research capacity and laying the foundation for larger-scale, sustained engagement with DOE ARM and ASR programs.

54 ENVIRONMENTAL SCIENCES

Probabilistic projections of the Amery Ice Shelf catchment, Antarctica, under conditions of high ice-shelf basal melt

Abstract. Antarctica's Lambert Glacier drains about one-sixth of the ice from the East Antarctic Ice Sheet and is considered stable due to the strong buttressing provided by the Amery Ice Shelf. While previous projections of the sea-level contribution from this sector of the ice sheet have predicted significant mass loss only with near-complete removal of the ice shelf, the ocean warming necessary for this was deemed unlikely. Recent climate projections through 2300 indicate that sufficient ocean warming is a distinct possibility after 2100. This work explores the impact of parametric uncertainty on projections of the response of the Lambert–Amery system (hereafter “the Amery sector”) to abrupt ocean warming through Bayesian calibration of a perturbed-parameter ice-sheet model ensemble. We address the computational cost of uncertainty quantification for ice-sheet model projections via statistical emulation, which employs surrogate models for fast and inexpensive parameter space exploration while retaining critical features of the high-fidelity simulations. To this end, we build Gaussian process (GP) emulators from simulations of the Amery sector at a medium resolution (4–20 km mesh) using the Model for Prediction Across Scales (MPAS)-Albany Land Ice (MALI) model. We consider six input parameters that control basal friction, ice stiffness, calving, and ice-shelf basal melting. From these, we generate 200 perturbed input parameter initializations using space filling Sobol sampling. For our end-to-end probabilistic modeling workflow, we first train emulators on the simulation ensemble and then calibrate the input parameters using observations of the mass balance, grounding line movement, and calving front movement with priors assigned via expert knowledge. Next, we use MALI to project a subset of simulations to 2300 using ocean and atmosphere forcings from a climate model for both low- and high-greenhouse-gas-emission scenarios. From these simulation outputs, we build multivariate emulators by combining GP regression with principal component dimension reduction to emulate multivariate sea-level contribution time series data from the MALI simulations. We then use these emulators to propagate uncertainty from model input parameters to predictions of glacier mass loss through 2300, demonstrating that the calibrated posterior distributions have both greater mass loss and reduced variance compared to the uncalibrated prior distributions. Parametric uncertainty is large enough through about 2130 that the two projections under different emission scenarios are indistinguishable from one another. However, after rapid ocean warming in the first half of the 22nd century, the projections become statistically distinct within decades. Overall, this study demonstrates an efficient Bayesian calibration and uncertainty propagation workflow for ice-sheet model projections and identifies the potential for large sea-level rise contributions from the Amery sector of the Antarctic Ice Sheet after 2100 under high-greenhouse-gas-emission scenarios.

54 ENVIRONMENTAL SCIENCES

Projections of future climate for U.S. national assessments: past, present, future

Climate assessments consolidate our understanding of possible future climate conditions as represented by climate projections, which are largely based on the output of global climate models. Over the past 30 years, the scientific insights gained from climate projections have been refined through model structural improvements, emerging constraints on climate feedbacks, and increased computational efficiency. Within the same period, the process of assessing and evaluating information from climate projections has become more defined and targeted to inform users. As the size and audience of climate assessments has expanded, the framing, relevancy, and accessibility of projections has become increasingly important. This paper reviews the use of climate projections in national climate assessments (NCA) while highlighting challenges and opportunities that have emerged over time. Reflections and lessons learned address the continuous process to understand the broadening assessment audience and evolving user needs. Insights for future NCA development include (1) identifying benchmarks and standards for evaluating downscaled datasets, (2) expanding efforts to gather research gaps and user needs to inform how climate projections are presented in the assessment (3) providing practitioner guidance on the use, interpretation, and reporting of climate projections and uncertainty to better inform decision-making.

Assessment