Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Project-X: A New high intensity proton accelerator complex at Fermilab

Fermilab has been working with the international particle physics and nuclear physics communities to explore and develop research programs possible with a new high intensity proton source known as 'Project-X'. Project X will provide multi-megawatt proton beams from the Fermilab Main Injector over the energy range 60-120 GeV simultaneous with multi-megawatt protons beams at 3 GeV with very flexible beam-timing characteristics and up to 300 kW of pulsed beam at 8 GeV. The Project-X research program includes world leading sensitivity in longbaseline neutrino experiments, neutrino scattering experiments, a rich program of ultra-rare muon and kaon decays, opportunities for next-generation electric dipole moment experiments and other nuclear/particle physics probes that reach far beyond the Standard Model.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design Considerations for an MEBT Chopper Absorber of 2.1 MeV H- at the Project X Injector Experiment at Fermilab

The Project X Injector Experiment (PIXIE) will be a prototype of the Project X front end that will be used to validate the design concept and decrease technical risks. One of the most challenging components of PIXIE is the wide-band chopping system of the Medium Energy Beam Transport (MEBT) section, which will form an arbitrary bunch pattern from the initially CW 162.5 MHz 5mA beam. The present scenario assumes diverting 80% of the beam to an absorber to provide a beam with the average current of 1mA to SRF linac. This absorber must withstand a high level of energy deposition and high ion fluence, while being positioned in proximity of the superconductive cavities. This paper discusses design considerations for the absorber. Thermal and mechanical analyses of a conceptual design are presented, and future plans for the fabrication and testing of a prototype are described.

43 PARTICLE ACCELERATORS↗

THE PROJECT-X INJECTOR EXPERIMENT: A NOVEL HIGH PERFORMANCE FRONT-END FOR A FUTURE HIGH POWER PROTON FACILITY AT FERMILAB

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H* ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

43 PARTICLE ACCELERATORS↗

The Project-X Injector Experiment: A Novel High Performance Front-End for a Future High Power Proton Facility at Fermilab

A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are carrying out a program of research and development aimed at integrated systems testing of critical components comprising the front end of Project X. This program, known as the Project X Injector Experiment (PXIE), is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. PXIE is currently under construction at Fermilab and will be completed over the period FY12-17. PXIE will include an H- ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

Nagaitsev, S.↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

CW Room-Temperature Bunching Cavity for the Project X MEBT

The Project-X, a multi-MW proton source based on superconducting linac, is under development at Fermilab. The front end of the linac contains a CW room temperature MEBT section which comprises ion source, RFQ and high-bandwidth bunch selectiv e chopper. The length of the chopper exceeds 10 m, so four re-bunching cavities are used to support the beam longitudinal dynamics. The RF and mechanical designs of the re-bunching cavity including stress and thermal analysis are reported.

43 PARTICLE ACCELERATORS↗

Status of the mechanical design of the 650 MHz cavities for Project X

In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

43 PARTICLE ACCELERATORS↗

Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.

43 PARTICLE ACCELERATORS↗

Project X - a new multi-megawatt proton source at Fermilab

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. The centerpiece of this program is a superconducting H-linac that will support world leading programs in long baseline neutrino experimentation and the study of rare processes. Based on technology shared with the International Linear Collider (ILC), Project X will provide multi-MW beams at 60-120 GeV from the Main Injector, simultaneous with very high intensity beams at lower energies. Project X will also support development of a Muon Collider as a future facility at the energy frontier.

43 PARTICLE ACCELERATORS↗

CW Room Temperature Re-Buncher for the Project X Front End

At Fermilab there is a plan to construct the Project X Injector Experiment (PXIE) facility - a prototype of the front end of the Project X, a multi-MW proton source based on superconducting linac. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The room temperature front end of the linac contains an ion source, an RFQ accelerator and a Medium Energy Beam Transport (MEBT) section comprising a high bandwidth bunch selective chopper. The MEBT length is about 10 m, so three re-bunching CW cavities are used to support the beam longitudinal dynamics. The paper reports a RF design of the re-bunchers along with preliminary beam dynamic and thermal analysis of the cavities.

43 PARTICLE ACCELERATORS↗

Project X and a muon facility at Fermilab

An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab. Project X is a proposed high intensity proton facility intended to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab while also providing an upgrade path to drive a neutrino factory and/or a muon collider. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report of August 2007 and of the Intensity Frontier science program described in the P5 report of May 2008. The primary elements of that research program to be supported by Project X include: (1) A neutrino beam for long baseline neutrino oscillation experiments. A new 2 megawatt proton source with proton energies between 50 and 120 GeV would produce intense neutrino beams, directed toward a large detector located in a distant underground laboratory. (2) Kaon and muon based precision experiments running simultaneously with the neutrino program. These could include a world leading muon-to-electron conversion experiment and world leading rare kaon decay experiments. (3) A path toward a muon source for a possible future neutrino factory and, potentially, a muon collider at the Energy Frontier. This path requires that the new proton source have significant upgrade potential beyond the initial uses. This paper suggests that an implementation of Project X based on a CW linac can be part of a continuous synergistic transition from a muon physics program in the 'Booster era' to the Neutrino Factory and Muon Collider. It then describes a possible staging of the planned muon experiments and of Project X to provide a graceful transition from the Intensity Frontier to the Energy Frontier.

43 PARTICLE ACCELERATORS↗

Resonance Excitation of Longitudinal High Order Modes in Project X Linac

Results of simulation of power loss due to excitation of longitudinal high order modes (HOMs) in the accelerating superconducting RF system of CW linac of Project X are presented. Beam structures corresponding to the various modes of Project X operation are considered: CW regime for 3 GeV physics program; pulsed mode for neutrino experiments; and pulsed regime, when Project X linac operates as a driver for Neutrino Factory/Muon Collider. Power loss and associated heat load due to resonance excitation of longitudinal HOMs are shown to be small in all modes of operation. Conclusion is made that HOM couplers can be removed from the design of superconducting RF cavities of Project X linac.

43 PARTICLE ACCELERATORS↗

Status of the Project-X CW Linac Design

Project-X is a proposed proton accelerator complex at Fermilab that would provide particle beams to support a diversified experimental program at the intensity frontier. As currently envisioned, the complex would employ a CW superconducting linac to accelerate a 1 mA average, 5 mA peak H{sup -} beam from 2.1 MeV to 3 GeV. A second superconducting linac, operating in pulsed mode would ultimately accelerate a small fraction of this beam up to 8 GeV. The CW linac is based on five families of resonators operating at three frequencies: half-wave (1 family at 162.5 MHz), spoke (2 families at 325 MHz) and elliptical (2 families at 650 MHz). Accelerating and focusing elements are assembled in cryomodules separated by short warm sections. A long open region ({approx} 15 m) allows beam extraction at 1 GeV in support of a nuclear experimental program. In this paper, we present the latest iteration of the CW linac baseline lattice. We also briefly compare it to an alternative where the 162.5 half-wave resonators are replaced with 325 MHz spoke resonators.

43 PARTICLE ACCELERATORS↗

SRF cavities for CW option of Project X Linac

Alternative option of Project X is based on the CW SC 2GeV Linac with the average current 1mA. Possible option of the CW Linac considered in the paper includes low energy part consisted of a few families SC Spoke cavities (from 2.5 MeV to 466 MeV) and high energy part consisted of 2 types of elliptical cavities (v/c=0.81 and v/c=1). Requirements and designed parameters of cavities are considered.

43 PARTICLE ACCELERATORS↗

Resonance effects of longitudinal HOMS in Project X linac

Results of analysis of losses due to excitation of longitudinal high order modes (HOMs) in the accelerating RF system of the CW proton linac of the Project X facility are presented. The necessity of HOM dampers in the superconducting (SC) cavities of the linac is discussed. Project X is a multi-MW proton source which is under development at Fermilab. The facility is based on a 3 GeV CW linac. The main fraction of H{sup -} beam from the linac is split into three parts for Mu2e experiment, kaon experiments, and another which is not yet decided. The layout of the linac is shown in Figure 1. It includes three sections based on 325 MHz single-spoke cavities, and a low-energy and a high-energy sections of 650 MHz elliptical cavities with geometrical beta of 0.61 and 0.9, respectively. The linac provides a beam with an average current of 1 mA and time structure (shown in Figure 2) devised to satisfy specific requirements of the experiments. Each bunch contains 9 {center_dot} 10{sup 7} H{sup -} ions. The bunch sequence frequency for the Mu2e experiment is 162.5 MHz with a total pulse duration of 100 ns and pulse repetition rate of 1 MHz. The bunch sequence frequency for Kaon and other experiments is 27.08 MHz. Figure 3 shows the idealized beam current spectrum, which contains harmonics of multiplies of 27.08 MHz and harmonics of multiplies of 1 MHz. The 5-cell 650 MHz cavities for Project X are currently under development. A critical design decision is to define the necessity of HOM dampers for these types of cavities.

43 PARTICLE ACCELERATORS↗

Project X as a Proton Driver for a Neutrino Factory and/or a Muon Collider

Project X is the current name for Fermilab’s plans for a major augmentation of its proton-based accelerators. The proposed statement of mission need for Project X includes the requirement that there be an upgrade path to provide the proton beams needed by neutrino factories and/or muon colliders. This document discusses the ramifications of that requirement. While originally envisioned to be two reports, one for each application, the present single document allows a description of those aspects of a proton driver which are common to both a neutrino factory and a muon collider and, more importantly, allows coherent descriptions of development paths that are relevant for both applications.

43 PARTICLE ACCELERATORS↗

Rapid Cycling Synchrotron Option for Project X

This paper presents an 8 GeV Rapid Cycling Synchrotron (RCS) option for Project X. It has several advantages over an 8 GeV SC linac. In particular, the cost could be lower. With a 2 GeV 10 mA pulsed linac as injector, the RCS would be able to deliver 4 MW beam power for a muon collider. If, instead, a 2 GeV 1 mA CW linac is used, the RCS would still be able to meet the Project X requirements but it would be difficult for it to serve a muon collider due to the very long injection time.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Progress in cavity and cryomodule design for the Project X linac

The continuous wave 3 GeV Project X Linac requires the development of two families of cavities and cryomodules at 325 and 650 MHz. The baseline design calls for three types of superconducting single-spoke resonators at 325 MHz having betas of 0.11, 0.22, and 0.42 and two types of superconducting five-cell elliptical cavities having betas of 0.61 and 0.9. These cavities shall accelerate a 1 mA H- beam initially and must support eventual operation at 4 mA. The electromagnetic and mechanical designs of the cavities are in progress and acquisition of prototypes is planned. The heat load to the cryogenic system is up to 25 W per cavity in the 650 MHz section, thus segmentation of the cryogenic system is a major issue in the cryomodule design. Designs for the two families of cryomodules are underway.

43 PARTICLE ACCELERATORS↗