Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Electric Sail Tether Deployment System for CubeSats

An Electric Sail (E-Sail) propulsion system consists of long, thin tethers - positively-charged wires extending radially and symmetrically outward from a spacecraft. Tethers must be biased using a high-voltage power supply to ensure that the solar wind produces thrust. While the E-Sail concept shows great promise for flying heliopause missions with higher characteristic acceleration than solar sails, there are significant technical challenges related to deploying and controlling multiple tethers. A typical full-scale design involves a hub and spoke arrangement of 10 to 100 tethers, each 20 km long. In the last 20 years, there have been multiple space mission failures due to tether deployment and control issues, and most configurations involved a single tether. This paper describes an effort to develop and test a simple yet robust single-tether deployment system for a two-6U CubeSat configuration. The project included the following: a) Tether dynamic modeling/simulation b) E-Sail single-tether prototype development and testing c) Space environmental effects testing to identify best materials for further development. These three areas of investigation were needed to provide technical rationale for an E-Sail flight demonstration mission that is expected to be proposed for the 2022 time frame. The project team used an “agile” engineering approach in which E-Sail single-tether prototype designs were iteratively developed and tested to solve problems and identify design improvements. The agile approach was ideal for this low Technology Readiness Level (TRL) project because tether deployer development involved many unknowns in prototype development that could only be discovered through iterative cycles of construction and testing. Extensive modeling and simulation were accomplished for three types of tether deployment: a) Stage 1: propulsive separation with one 6U fixed b) Stage 2: propulsive spin-up with one 6U fixed c) Stage 3: propulsive spin-up with both 6Us free Simulation results were valuable for understanding the propulsive and braking forces needed for controlled tether deployment. This paper describes the evolution, insights, and test/ performance data related to the resultant single-tether two-6U E-Sail test article which has been demonstrated in a test laboratory. The development effort suggests near-term work needed to achieve a useful flight demonstration, and provides ideas for how multiple-tether deployment systems might evolve going forward. A planned next-generation E-Sail prototype will include autonomous propulsive tether deployment while monitoring tether tension, location on the floor, distance between tether ends, acceleration, velocity, and propellant used.

Tinker, Michael↗

An Overview of the Smart Sensor Inter-Agency Reference Testbench (SSIART)

In this paper, we present an overview of a proposed collaboration between the National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA), which is designed to facilitate the introduction of commercial-off-the-shelf (COTS) radios for smart-sensing applications into international spaceflight programs and projects. The proposed work will produce test hardware reference designs, test software reference architectures and example implementations, test plans in reference test environments, and test results, all of which will be shared between the agencies and documented for future use by mission planners. The proposed collaborative structure together with all of the anticipated tools and results produced under the effort is collectively referred to as the Smart Sensor Inter-agency Reference Testbench or SSIART. It is intended to provide guidance in technology selection and in increasing the related readiness levels of projects and missions as well as the space industry.

Wagner, Raymond S.↗

Tracking system performance tests in the MDS era

Tracking system performance tests as developed to support DSN Mark III Data Subsystem implementation project and prepass readiness tests are described. The system test design, the rationale chosen for implementation, and the inevitable compromises imposed by schedule constraints and reserves are discussed.

Buckles, B. J.↗

X-ray satellite (ROSAT)

With regards to technical performance, the project is running according to plan. An increase in total cost outlay was required. The new Dornier Systems schedule projects ROSAT launch readiness for April 27, 1988. However, as a result of the Challenger accident, no binding launch date has been received from NASA. The thirteenth status review was conducted at the prime contractor in March, 1986. Assembly of the FM mirror system has been interrupted due to irregularities in the gold damping; in addition, mission operation and simulator development are effected by understaffing. Postponements have been announced in the data transmission and components acquisition subsystems.

Source record↗

A small solar electric ion propulsion spacecraft for lunar science

A lightweight spacecraft design concept has been developed which employs solar-electric ion propulsion to conduct a lunar science mission. The design relies on off-the-shelf technology to achieve high reliability and near-term launch readiness status. Overall project costs are kept to a minimum through the concentration of mission objectives, as well as through the minimization of payload launch costs by resort to the Space Shuttle's Get-Away Special canister. Attention is given to the spacecraft's instrumentation configuration.

Salazar, R. P.↗

An Overview of the TROPICS NASA Earth Venture Mission

The Time-Resolved Observations of Precipitation structure and storm Intensity with a Constellation of Smallsats (TROPICS) mission was selected by NASA as part of the Earth Venture-Instrument (EVI-3) program. The overarching goal for TROPICS is to provide nearly all-weather observations of 3D temperature and humidity, as well as cloud ice and precipitation horizontal structure, at high temporal resolution to conduct high-value science investigations of tropical cyclones. TROPICS will provide rapid-refresh microwave measurements (median refresh rate better than 60 min for the baseline mission) which can be used to observe the thermodynamics of the troposphere and precipitation structure for storm systems at the mesoscale and synoptic scale over the entire storm life cycle. TROPICS comprises six Cube-Sats in three low-Earth orbital planes. Each CubeSat will host a high-performance radiometer to provide temperature profiles using seven channels near the 118.75 GHz oxygen absorption line, water vapour profiles using three channels near the 183 GHz water vapour absorption line, imagery in a single channel near 90 GHz for precipitation measurements (when combined with higher-resolution water vapour channels), and a single channel near 205 GHz which is more sensitive to precipitation-sized ice particles. This observing system offers an unprecedented combination of horizontal and temporal resolution to measure environmental and inner-core conditions for tropical cyclones on a nearly global scale and is a major leap forward in the temporal resolution of several key parameters needed for assimilation into advanced data assimilation systems capable of utilizing rapid-update radiance or retrieval data.Launch readiness is currently projected for late 2019.

TROPICS↗

Flow Simulations for Martian and Lunar Lander Plume-Surface Interaction Prediction

Landing vehicle propulsive systems introduce several risks associated with plume/surface interactions (PSI) during the final stages of descent. For example, view obscuration during descent due to the liberation of dust driven by the rocket plume’s interaction with the lunar surface was reported on several Apollo missions. Plume-driven debris impacts on vehicle and nearby assets as well as landing instabilities due to crater formation are also potential risks associated with plume/surface interactions. The importance of studying these plume/surface interactions has been elevated due to NASA’s mission to land humans on the Moon by 2024. Existing and under-development predictive simulation tools are currently being brought to application readiness under a project awarded by the NASA Space Technology Mission Directorate (STMD) Game Changing Development (GCD) program. This tool development is divided into four tasks: (1) simulating plume structure in low-pressure environments, (2) simulating crater development and ejecta, (3) regolith particle phase modeling, and (4) gas-particle interaction modeling. Recent efforts under task 1 include demonstrating existing computational fluid dynamics (CFD) tools for simulating plume structure in low pressure environments similar to those found on Mars. The results of these demonstrative simulations are compared to available experimental data. Emerging capability being developed under task 2 is also presented, demonstrating simulations of crater formation in Lunar conditions.

Thomas P Shurtz↗

Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

verifications↗

Using Technology Readiness Level (TRL), Life Cycle Cost (LCC), and Other Metrics to Supplement Equivalent System Mass (ESM) in Advanced Life Support (ALS)

The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.

Jones, Harry↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and how key performance parameters (KPPs) are being used to measure the degree of capability gap closure. KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the strategic approach to gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

James Lee Broyan↗

NASA Environmental Control and Life Support Technology Development for Exploration: 2020 to 2021 Overview

This PowerPoint presentation supports the following paper submission's abstract (STRIVES 20210015025). This paper provides an overview of NASA supported activities developing Environmental Control and Life Support (ECLSS) technologies in the following capability areas: life support, environmental monitoring, fire safety, and logistics. NASA has been refining technology needs for deep space missions including Gateway, lunar surface, Mars transit, and Mars surface missions. Validating technologies in relevant environments, both in low earth orbit (LEO) and ground tests is critical in understanding technology performance and long duration performance. On-orbit and ground tests inform NASA’s technology decisions to fill exploration gaps. NASA has multiple technology projects across the technology readiness spectrum with potential to fill or partially fill exploration gaps. For each capability area, this paper will describe select capability gaps, NASA technology project maturation over the past year, and key performance parameters (KPPs). KPPs are evolving but they still provide a useful measure in communicating progress and identifying development needs to fill exploration gaps. The intent is to provide a very high-level overview describing the projects that are supporting gap closure and provide references to additional technical details, progress, and KPPs.

Life Support↗

NSWC Crane Aerospace Cell Test History Database

The Aerospace Cell Test History Database was developed to provide project engineers and scientists ready access to the data obtained from testing of aerospace cell designs at Naval Surface Warfare Center, Crane Division. The database is intended for use by all aerospace engineers and scientists involved in the design of power systems for satellites. Specifically, the database will provide a tool for project engineers to review the progress of their test at Crane and to have ready access to data for evaluation. Additionally, the database will provide a history of test results that designers can draw upon to answer questions about cell performance under certain test conditions and aid in selection of a cell for a satellite battery. Viewgraphs are included.

Brown, Harry↗

NASA Electronic Parts and Packaging Program

NEPP program objectives are to: (1) Access the reliability of newly available electronic parts and packaging technologies for usage on NASA projects through validations, assessments, and characterizations, and the development of test methods/tools; (2)Expedite infusion paths for advanced (emerging) electronic parts and packaging technologies by evaluations of readiness for manufacturability and project usage consideration; (3) Provide NASA projects with technology selection, application, and validation guidelines for electronic parts and packaging hardware and processes; nd (4) Retain and disseminate electronic parts and packaging quality assurance, reliability validations, tools, and availability information to the NASA community.

Kayali, Sammy↗

Phase 1 of the automated array assembly task of the low cost silicon solar array project

The state of technology readiness for the automated production of solar cells and modules is reviewed. Individual process steps and process sequences for making solar cells and modules were evaluated both technically and economically. High efficiency with a suggested cell goal of 15% was stressed. It is concluded that the technology exists to manufacture solar cells which will meet program goals.

Coleman, M. G.↗

Thermal Protection System (Heat Shield) Development - Advanced Development Project

The Orion Thermal Protection System (TPS) ADP was a 3 1/2 year effort to develop ablative TPS materials for the Orion crew capsule. The ADP was motivated by the lack of available ablative TPS's. The TPS ADP pursued a competitive phased development strategy with succeeding rounds of development, testing and down selections. The Project raised the technology readiness level (TRL) of 8 different TPS materials from 5 different commercial vendors, eventual down selecting to a single material system for the Orion heat shield. In addition to providing a heat shield material and design for Orion on time and on budget, the Project accomplished the following: 1) Re-invigorated TPS industry & re-established a NASA competency to respond to future TPS needs; 2) Identified a potentially catastrophic problem with the planned MSL heat shield, and provided a viable, high TRL alternate heat shield design option; and 3) Transferred mature heat shield material and design options to the commercial space industry, including TPS technology information for the SpaceX Dragon capsule.

Kowal, T. John↗

Composites for Exploration Upper Stage

The Composites for Exploration Upper Stage (CEUS) was a 3-year, level III project within the Technology Demonstration Missions program of the NASA Space Technology Mission Directorate. Studies have shown that composites provide important programmatic enhancements, including reduced weight to increase capability and accelerated expansion of exploration and science mission objectives. The CEUS project was focused on technologies that best advanced innovation, infusion, and broad applications for the inclusion of composites on future large human-rated launch vehicles and spacecraft. The benefits included near- and far-term opportunities for infusion (NASA, industry/commercial, Department of Defense), demonstrated critical technologies and technically implementable evolvable innovations, and sustained Agency experience. The initial scope of the project was to advance technologies for large composite structures applicable to the Space Launch System (SLS) Exploration Upper Stage (EUS) by focusing on the affordability and technical performance of the EUS forward and aft skirts. The project was tasked to develop and demonstrate critical composite technologies with a focus on full-scale materials, design, manufacturing, and test using NASA in-house capabilities. This would have demonstrated a major advancement in confidence and matured the large-scale composite technology to a Technology Readiness Level 6. This project would, therefore, have bridged the gap for providing composite application to SLS upgrades, enabling future exploration missions.

composites↗

Particle Interaction Physics Model Formulation for Plume-Surface Interaction Erosion and Cratering

As part of the Game Changing Development (GCD) Program, funded by NASA’s Space Technology Mission Directorate (STMD), the development of simulation capability for the prediction of extra-terrestrial Plume Surface Interaction (PSI) environments has been undertaken by the Fluid Dynamics Branch at NASA/MSFC. The Predictive Simulation Capability (PSC) Element is focused on creating simulation capability for the reliable and accurate prediction of PSI in Martian (~650 Pa) and Lunar (vacuum) ambient environments. In addition to the predictive simulation capability, the GCD Program also contains a companion Ground Testing Element for development of focused datasets for validation of predictive capability as well as a Flight-focused Instrumentation Element. This paper will present the status of implementing and maturing particle-particle interaction constituent physics models essential in simulating the landing surface granular material flow under PSI effects. This gas-particle multi-phase interaction modeling of plume impingement flow on the extra-terrestrial soil material is performed with the Gas-Granular Flow Solver (GGFS) addressed in a companion paper. The response of regolith particle flow induced by lander PSI requires accurate representation of the regolith granular material fluidic behavior and gas-granular interactions. The lunar regolith, as the extreme example, is poorly sorted with broad particle size distributions and large fines content. It has significant cohesion, due to interlocking particle shapes for the very jagged particles. The combination of particle shape and size distribution has been identified as major drivers in the complex particle flow response and resulting crater shape characteristics of extraterrestrial granular material. Constituent models for spherical particles can be formulated directly from particle kinetics theory. Complex particle shapes can be modeled by gluing together elemental spherical shapes into composite particles, requiring a Discrete Element Model (DEM) particle kinetics modeling approach to extract data and formulate constituent models. Mixture constituent models for poly-disperse mixtures (i.e, containing distribution of particle sizes) have recently been developed. The required non-spherical particle mixture granular material response closure models are then obtained through small-scale unit physics DEM simulations for the range of particle shapes, mixtures and packing densities. The granular material response closure models are then implemented in the Eulerian granular flow formulation. This DEM-based constituent model extraction process and formulation of poly-disperse particle mixtures has been successfully developed by small business and academic partners in the development of the Gas-Granular Flow Solver (GGFS) simulation program simulation framework. The currently implemented capabilities have reached the capability level of modeling bi-disperse, non-spherical particle mixtures is being continuously extended towards computational modeling of full range irregular particle mixtures. Under the GCD project, this technology is being further developed, transferred to NASA analysts, and matured towards application readiness. The predictive simulation capability team under the GCD project has acquired the modeling tools and processes of the DEM based constituent model formulation from the GGFS development team and is developing the capability to replicate the existing process. This is the first important step towards the ability of the NASA team to independently perform such model development in a production setting. Further efforts are underway to migrate the DEM based model simulation process performed with the academic based tools to more capable Open Source, highly parallelized simulation tools for efficient operation on NASA HPC assets. Evaluation of the currently implemented (such as mono-disperse and bi-disperse spherical and irregular shape particle constituent model applications) and continuously evolving full-range particle physics models in the GGFS tool is performed by the NASA team to advance application readiness of the simulations. Application testing for complex PSI erosions and cratering scenarios such as the Apollo LM is performed for axi-symmetric and full 3D simulations to aid the tool developers in achieving practical application readiness for NASA projects. Important validation and application testing will further be performed against experimental data generated under the GCD PSI project experimental component.

Peter A Liever↗