Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Cataloging Legacy Data from the Tritium Systems Test Assembly Program

The Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory, operational from 1984 to 2001, was critical in advancing fusion fuel cycle technologies, including tritium storage, gas separation, and pumping. TSTA’s contributions, particularly in safe tritium operations, have influenced subsequent fusion projects. This paper discusses the ongoing effort to digitize and catalog TSTA’s historical data to create a searchable resource for the fusion research community. While the long-term objective is to develop a relational database for structured data management, the project remains in the early phase, with current efforts focused on scanning and indexing physical documents. Initial plans for database implementations are also presented, outlining key considerations for structure, query indexing, and standardization. As digitization progresses, future discussions will refine these implantation details to ensure an efficient and comprehensive system. This initiative aims to preserve critical legacy data, enhance the design of tritium system facilities, and support the next generation of fusion energy research.

42 ENGINEERING

Long-term Moisture Adsorption in Packaged Plutonium Oxide

In 2018, the Department of Energy National Nuclear Security Administration (DOE-NNSA) began implementing dilute and dispose to remove 34 metric tons (MT) of surplus weapons grade plutonium from the US stockpile. Under this plan, surplus plutonium material is converted into plutonium oxide (PuO 2 ) before being stored in metal containers and sent to the DOE Waste Isolation Pilot Plant (WIPP). The dilute and dispose project was implemented as a more cost-effective method for abiding by the Plutonium Management and Disposition Agreement (PMDA) between the USA and Russia, as compared to producing mixed oxide fuel (MOX). The PMDA was originally signed in 2000 and amended in 2010.2 The disassembly of pits and conversion to PuO 2 as part of dilute and dispose is carried out through the Advanced Recovery and Integrated Extraction System (ARIES) developed at Los Alamos National Laboratory (LANL). The dilute portion of dilute and dispose is carried out at Savannah River Site (SRS). With this program in place, it is necessary to ensure the safe, long-term storage of the PuO 2 generated during this process until final disposal at WIPP is accomplished.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

DEVELOPMENT OF AN INTEGRATED SECURITY AND SAFETY MONITORING SYSTEM FOR SPENT NUCLEAR FUEL AND HIGH-LEVEL WASTE TRANSPORTATION

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating, and testing an integrated security and safety monitoring system (ISSMS) for railcars used to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The system will comply with the US Department of Energy’s (DOE) Order 460.2B “Departmental Materials Transportation Management” and the Association of American Railroads’ (AAR) standard S-2043 “Performance Specification for Trains Used to Carry High-level Radioactive Material” [1] developed specifically for railcars used to transport high-level radioactive material (HLRM). DOE is in the process of developing and testing an ISSMS that will satisfy both DOE requirements and AAR standards. DOE has already developed railcar designs for transportation of HLRM. In 2024, DOE’s Atlas railcar project completed the design, fabrication and testing of three railcar types: transportation cask-carrying, buffer, and security escort, resulting in AAR conditional approval to operate on freight rail networks in North America. DOE decided to combine the required security and safety systems into one system, and this combined system is the subject of the current effort. DOE is developing and proposes to implement the ISSMS for these railcars as part of the build out of the railcar fleet. DOE began planning for development of the ISSMS in February 2020. The project is divided into seven phases starting with conceptual design and continuing through production design, as shown in Figure 1. An earlier version of the system was tested as part of the Atlas railcar consist demonstration test run in 2023. This paper describes the design features and system testing using the Atlas project railcars, and laboratory testing completed to date. The paper will also describe the activities planned to support the DOE project to ship the High Burn-Up Research Cask (HBRC) in 2027.

Schultze, Michael [ORNL] (ORCID:0000000283205671)

Airport Ground Support Equipment Analysis

Ground support equipment (GSE) plays a critical role in providing services to aircraft at arrival and departure gates, ensuring smooth and efficient airport operations. As the airline industry seeks to reduce costs and expand energy options, electric GSE (eGSE) is emerging as a promising solution. This project examines the integration of eGSE into airport operations, addressing key considerations such as vehicle deployment, charging infrastructure, and grid impacts. We developed a flexible, bottom-up modeling framework to evaluate energy demands and infrastructure requirements across more than 300 U.S. airports, providing actionable insights to support electrification planning and implementation. The study focuses on eight major types of GSE with commercially available electric counterparts: aircraft tractors, ground power units, baggage tractors, belt loaders, cargo loaders, catering trucks, lavatory trucks, and water trucks. Project results include annual charging load profiles, total energy consumption, and the charger and fleet requirements for each airport.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY

Spectrum Interference from Commercial devices in 6 & 7/8 GHz

FCC repurposed spectrum in the 6 GHz band allocated to DOE for commercial use of Wi-Fi 6E/7 in 2020.The 2024 National Spectrum Strategy (NSS) implementation plan is now considering 7/8 GHz band as well for co-existence of commercial devices with federal incumbents such as DOE. This poster summarizes INL’s work on a scientific study on the potential harmful interference caused by the commercial devices in real-world scenarios. It includes research in INL for the following projects funded by DOE: 1) DOE-CIO: Spectrum security for advanced wireless technologies; 2) DOE-OE: 7 GHz Spectrum interference study; 3) DOE-CESER: Harmful interference in 6 GHz from commercial Wi-Fi 6E/7 devices on utility links in the energy sector; 4) DOE/NTIA for NSS Implementation plan: Interference study in 7/8 GHz bands identified in the NSS. 5) NSF: Spectrum Innovation Initiative- National Radio Dynamic Zones (SII-NRDZ).

6 GHz

Detection and Association of Operational Events using DAS and Seismometers (FY 2025 Mid-Year Report)

This mid-year report summarizes ongoing work to identify anomalous vibration signals indicative of potential containment breaches. This work includes compiling continuous seismic datasets and testing and refining underground detection and geolocation techniques. In the first two quarters of FY25, we have completed two project work plan tasks: (1) creating a database of continuous waveforms and ground truth event data from multiple modalities and (2) refining and implementing a detection and association algorithm to create a catalog of anomalous underground activities. This report contains a summary of the seismic database including the continuous seismic data collected by a dense array of surface seismic stations above Pleasant Gap Mine, and continuous seismic data collected using subsurface distributed acoustic sensing (DAS) in the subsurface at Sanford Underground Research Facility (SURF) and the ground truth information gathered from both sites. This report also includes results from refining and applying a dynamic power spectral density detector to both continuous seismic datasets. Finally, the report provides an initial catalog of subsurface operational events from both sensing modalities.

58 GEOSCIENCES

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION

Collaborative Enhancements to Unlock Interregional Transmission

Multiple recent studies highlight significant benefits associated with expansion of interregional transfer capabilities for efficiently adapting to these changes. Despite these proposed benefits, few, if any, interregional transmission projects have been built in recent memory . The objective of this report is to confront the barriers to interregional transmission that exist today and address them with potential reforms and collaborative solutions. This report identifies solutions with the potential for immediate beneficial impact on interregional transmission with the ultimate goal of allowing more effective identification and advancement of interregional transmission projects that create the most positive net value to the participating systems . It distinguishes between states, federal government, and planning regions as key actors in implementing solutions designed to be flexible to accommodate regional differences.

24 POWER TRANSMISSION AND DISTRIBUTION

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Offshore Wind Energy Fundamentals for Bangladesh [Slides]

Bangladesh is aiming to limit emissions, and gain access to cleaner, more efficient technologies to support economic growth as the nation strives to achieve high-income status by 2041. Bangladesh identified that it has a potential for offshore wind energy, especially at hub heights of 140 to 160 meters, which is pivotal in diversifying the country's energy mix and ensuring energy security. This one-day webinar is funded by the United States Agency for International Development (USAID) through two projects: (1) Reinforcing Advanced Energy Systems (RAES) project, implemented by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), and (2) Bangladesh Advancing Development and Growth through Energy (BADGE) project, implemented by Tetra Tech.

17 WIND ENERGY

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS

Energy Baseline Assessment and Project Considerations for the Wai'anae Moku Community Energy Plan

This report was prepared as a supplement to the Waianae moku community's energy plan and includes results of two activities conducted by the National Laboratory of the Rockies in support of the planning process: (1) an energy baseline assessment and (2) considerations and resources for possible energy projects prioritized by the community in its energy plan. Results of the energy assessment describe the energy landscape in the state of Hawaii, on the island of Oahu, and in the Waianae moku at the time the plan was developed, with the intention of supporting informed community participation in the planning process. Considerations and resources align with each of the energy project ideas identified in the community's energy plan, and are intended to describe the current context and activities related to each, along with possible next steps toward implementation, and additional resources. The report concludes with takeaways for the community to consider as they pursue their energy goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Annual Report on NCSP Technical Support task in BNL during FY24

This work reports on the investigations done during FY 24 in collaboration with two 2024 Summer undergraduate interns through the DOE SULI and BNL SURP programs. These efforts were partially funded by the Nuclear Criticality Safety Program through the Technical Support Succession Plan task. The first project, developed by Ian Snider, focused on testing the impact of uncertainties in thermal cross sections for multiple materials in nuclear reactor simulations. The second project aimed implement concurrent into BNL’s machine-learning code to correct spin mis-assignments in neutron resonances, the Bayesian Resonance Reclassifier (BRR).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS

2024 Geothermal Rising Conference Poster

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY

Advanced Conductor Testing – 1431 kcmil Prysmian ACSS with E3X

Advanced conductors represent a significant evolution in transmission line technology. These conductors utilize innovative materials, such as composite cores, ultra-high-strength steel, and heat-dissipating coatings, to offer improved performance compared to traditional Aluminum Conductor Steel Reinforced (ACSR) designs. However, the deployment of these technologies has so far been limited. As each conductor comes with nuances in test setup and specifications, a standard test is not readily available to apply to all advanced conductors. Idaho National Laboratory’s (INL) Advanced Conductor Testing project, sponsored by the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER) and Office of Electricity (OE), focuses on developing and implementing testing protocols and plans for advanced conductor technologies to assess and demonstrate physical performance under varying operational conditions, including extreme environmental stressors such as wildfires. This report contains the fire testing results of a 1431 kcmil Prysmian ACSS with E3X conductor.

24 - POWER TRANSMISSION AND DISTRIBUTION