Engineering Design of a Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

Linde carried out an initial engineering design study for a Linde-BASF advanced post combustion CO 2 capture technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. This pre-FEED equivalent study included following: (1) basic design, including specific project scope definition and design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard and operability (HAZOP) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

08 HYDROGEN↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Engineering Study of Svante’s Solid Sorbent Post-Combustion CO 2 Capture Technology at a Linde Steam Methane Reforming H 2 Plant

An initial engineering design study was performed for an advanced post combustion CO 2 capture (PCC) technology to be installed at a commercial-scale steam methane reforming (SMR) hydrogen plant located in the US Gulf Coast. The PCC process integrated the VeloxoTherm™ structured adsorbent technology from Svante for the CO 2 separation and CO 2 compression and purification and balance of plant systems provided by Linde. This pre-FEED equivalent study included following: (1) design basis, (2) basic engineering, including development of process flow diagrams and heat & material balances, (3) inside the battery limit (ISBL) equipment and systems specification, (4) balance of plant outside the battery limit (OSBL) equipment and systems specifications, (5) technology maturation plan, (6) hazard identification (HAZID) review, (7) environmental, health and safety (EH&S) assessment and environmental permitting analysis, (8) constructability review, (9) ISBL and OSBL EPC cost estimation, and (10) commercial-scale techno-economic analysis including capital expenditures (CAPEX) and operating expenditures (OPEX) and CO 2 capture cost estimates.

03 NATURAL GAS↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

The Novel Charfuel® Coal Refining Process 18 TPD Pilot Plant Project for Co- Producing an Upgraded Coal Product, and Commercially Valuable Co- Products: Area of Interest #3 – Coal Beneficiation Pilot Plant Testing (Final Report)

Operation of Carbon Fuels, LLC’s (“CF”) existing, permitted 18 TPD pilot plant located in Golden, Colorado using two individually ranked (ASTM D 388) coal types (two campaigns), employing the novel Charfuel® coal refining process to produce an upgraded coal product and a number of high-valued organic and inorganic coproducts (for which there presently exists large commercial markets) in order to produce engineering and product data which will then be utilized toward the design of a commercial scale integrated facility (pre-feed document). Carbon Fuels, LLC has developed the Charfuel® Coal Refining Process which refines domestically abundant, raw coal (in the same manner as crude oil is refined) to produce the identical, high value co-products that are refined from crude oil. Thus, gasoline, jet fuel, “green diesel”, fuel oil, and marine fuels, as well as petrochemicals such as benzene, toluene, xylene, and methanol are refined from raw coal using this process. The Charfuel® Coal Refining Process is not a coal conversion process, like pyrolysis, or indirect liquefaction. Nor is it an alternative energy system. Rather it is a coal refining process that has the ability to economically produce products traditionally associated with the refining of crude oil but using only abundant, raw coal as the refinery feed stock. The Charfuel® Coal Refining Process is more economical than crude oil refining and is environmentally benign. Therefore, this value added process yields a return on investment well above 50% for a commercial facility. Furthermore, the Charfuel® process, unlike alternatives such as ethanol and hydrogen, can utilize the existing transportation, delivery, and other petroleum based systems. Hence, there is no need for new engines, pipelines, tankers, or product acceptance. As a result, the profitability of the process is increased. Objectives: (1) Operation of the integrated 18 tpd pilot plant, using two coal types (ranks); (2) Demonstration of process flexibility in being able to produce different products (gas, liquid, and char), as well as determination of operating parameters for identifying scale up criteria for two coal types (ranks); (3) Generation of engineering and design information (process specifications) for use in designing a commercial scale plant (scale-up); (4) Determination of important environmental issues surrounding the process and the products such as fate of trace elements (mercury and other heavy metals) and distributions of SO2, NOx, and CO 2 by analysis of effluent streams; (5) Production of sufficient product to allow reliable commercial economic evaluation of both the refined coal product and the coproducts; and, (6) Assessment of longer-term reliability of unit operations. Period 1: reconfiguration of the 18 TPD plant to meet specific FOA requirements and to qualify the facility for operation; and, Period 2: operation of the 18 TPD plant for two campaigns using two coals types (ranks) which are widely commercially used and abundant - the first being a subbituminous (Powder River Basin (“PRB”)) coal, and the second a bituminous (Illinois #6) coal.

01 COAL, LIGNITE, AND PEAT↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Non-catalytic pyrolysis of associated gas to zero CO 2 hydrogen and high value carbon black

The overall objective of this work is to perform a pre-Front End Engineering Design (pre-FEED) study of the conversion of associated gas produced at an active oil pad of a Bakken oil field producer, to high value carbon black and hydrogen using the Microwave Plasma Pyrolysis of Associated Gas (MPP-AG) process developed by H Quest Vanguard, Inc (HQV). The University of North Dakota’s Center for Process Engineering Research (CPER) collaborated with HQV to complete a design and techno-economic analysis for the MPP-AG deployed at an active Bakken well site flaring an average of 54,000 standard cubic feet per day of AG. The proposed design consists of: • A Microwave Pyrolysis Unit (MPU) which consists of H Quest’s proprietary MPP technology • A patent-pending Gas Conditioning Unit (GCU) designed by the University of North Dakota to condition intermittent and variable flow gas prior to pyrolysis. • An auxiliary unit running on the associated gas to power the GCU and MPU in an “island mode” configuration.

03 NATURAL GAS↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

10 Megawatts Electric Coal Direct Chemical Looping Large Pilot Plant - Pre-Front End Engineering and Design Study

The Peer Review presentation covered the following items: Perform pilot studies to obtain design information. Perform a pre-FEED study of a modular 10 MWeCDCL pilot plant. Provide Functional specifications for integration with host site. Provide risk assessment, schedule and cost estimate for fabrication, construction and testing. Update commercial 550 MWeCDCL plant design and economic analysis

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

Magnetic feed material and its use in producing bonded permanent magnets by additive manufacturing

A method for producing magnet-polymer pellets useful as a feedstock in an additive manufacturing process, comprising: (i) blending thermoplastic polymer and hard magnetic particles; (ii) feeding the blended magnet-polymer mixture into a pre-feed hopper that feeds directly into an inlet of a temperature-controlled barrel extruder; (iii) feeding the blended magnet-polymer mixture into the barrel extruder at a fixed feed rate of 5-20 kg/hour, wherein the temperature at the outlet is at least to no more than 10° C. above a glass transition temperature of the blended magnet-polymer mixture; (iv) feeding the blended magnet-polymer mixture directly into an extruding die; (v) passing the blended magnet-polymer mixture through the extruding die at a fixed speed; and (vi) cutting the magnet-polymer mixture at regular intervals as the mixture exits the extruding die at the fixed speed. The use of the pellets as feed material in an additive manufacturing process is also described.

36 MATERIALS SCIENCE↗

Flexible Gasification of Coal and Biomass to Generate Carbon Free Electric Power and Hydrogen

This paper describes the development of a coal and biomass-fed plant concept to co-produce electric power and hydrogen with net-negative CO2 emissions under the aegis of the 21st Century Power Plant initiative of the U.S. Department of Energy (DOE), whose goal is to advance innovative power plant concepts that are capable of flexible, net-zero carbon emission operations while producing cost-effective “blue” hydrogen to support economy-wide decarbonization goals. The proposed standalone plant will be in Nebraska, USA. The specified design feedstock is a hybrid blend of Powder River Basin (PRB) subbituminous coal from Wyoming and local Nebraska biomass (corn stover), 50 wt.% each (dry basis). Other potential feedstocks, including woody biomass (eastern red cedar) and waste plastic (auto shredder residue) were evaluated or reviewed as alternates. The proposed process block comprises a high-pressure, oxygen-blown fluidized bed gasifier (GTI Energy U-GAS® process) coupled with water gas shift, the Selexol process for acid gas (H2S and CO2) removal, and pressure-swing adsorption (PSA) to yield 8,500 kg/h of high-purity hydrogen. The off gas from the PSA unit is used in the power block (gas turbine combined cycle) to generate electric power to support the gasification process, hydrogen production, and 50 MWe net electric power to the grid. All major plant equipment including the gasifier, gas cleanup system, and power generation are commercially available and proven in other applications and considered at TRL 8-9. However, gasification of corn stover biomass is considered at TRL 6. Overall thermal efficiency of the plant is 50% (net HHV) with net atmospheric CO2 removal at a rate of 250-300,000 tpa. Design activities necessary to provide input to a FEED study (Phase II of the project), including the development of the Environmental Information Volume (EIV) for the host site, and an investment case, based on a pro-forma pre-FEED level cost estimate, have been completed and are described in detail in this paper.

Gülen, S. Can↗

Insights from Initial Engineering Designs of Point Source Capture at Industrial Facilities

Initial engineering design studies examining the application of state-of-the-art carbon capture technology at industrial plants contain generally overlooked real-world design considerations for near-term deployment of point source capture (PSC). The implementation of PSC across a wide range of industrial applications presents unique challenges associated with fluctuating CO<sub>2</sub> concentrations, flue gas composition, and utility and land availability. In this article, seven recent industrial retrofit PSC projects are reviewed to investigate the impact of site-specific factors on project design and cost. Across the seven projects, three capture technology classes and four industrial applications are considered, allowing insight into industry-specific opportunities for PSC technology synergy. Common challenges across projects and proposed design solutions are highlighted to propagate ideas and solutions to close the technology gaps and accelerate learning rates.

FEED Studies↗

Front-end engineering design (FEED) studies: a quantitative analysis

NETL has devised a methodology for normalizing FEED study metrics of interest and allowing cautious quantitative comparison across FEED studies. This presentation introduces the novel quantitative comparison methodology and presents results from utilizing this methodology to examine data presented in recent FEED study reports. The quantitative methodology developed for the examination of FEED study performance and cost also allows comparison of real-world performance and costs against NETL TEA model predicted performance and cost. Learnings from examining NETL model predicted performance and cost versus real world reported values are highlighted. These learnings provide insight into NETL TEA model uncertainty and highlight opportunities for further model development.

FEED Studies↗

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DE&#x2;FE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT↗