Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.

Power Management for Space Advanced Life Support

Space power systems include the power source, storage, and management subsystems. In current crewed spacecraft, solar cells are the power source, batteries provide storage, and the crew performs any required load scheduling. For future crewed planetary surface systems using Advanced Life Support, we assume that plants will be grown to produce much of the crew's food and that nuclear power will be employed. Battery storage is much more costly than nuclear power capacity and so is not likely to be used. We investigate the scheduling of power demands by the crew or automatic control, to reduce the peak power load and the required generating capacity. The peak to average power ratio is a good measure of power use efficiency. We can easily schedule power demands to reduce the peak power from its maximum, but simple scheduling approaches may not find the lowest possible peak to average power ratio. An initial power scheduling example was simple enough for a human to solve, but a more complex example with many intermittent load demands required automatic scheduling. Excess power is a free resource and can be used even for minor benefits.

Jones, Harry

Deep RL for Fast Long-Horizon Operations Scheduling on NASA's Carruthers Geocorona Observatory Mission

Spacecraft operations scheduling is a highly constrained, long-horizon combinatorial optimization problem that traditionally relies on heuristics, constraint programming, or manual planning. We present a scalable deep reinforcement learning framework developed and deployed for NASA’s Carruthers Geocorona Observatory mission. Our framework introduces a macro-action abstraction known as activity blocks coupled with dynamic action-masking to navigate the intractably large search space and strictly enforce complex power, thermal, and instrument constraints. The resulting architecture generates globally feasible schedules with overwhelming probability, establishes operational trust, and executes a full training cycle in under six hours, circumventing the need for policy robustness by enabling rapid, on-demand retraining. Further, resulting schedules outperform baseline heuristics in scheduled science quality. The deep reinforcement learning framework was deployed as the default operational scheduler for the Carruthers Geocorona Observatory mission from the outset of the mission, demonstrating that deep reinforcement learning can be trusted for real spacecraft operations under complex, evolving constraints.

Geocorona

High voltage interactions of a sounding rocket with the ambient and system-generated environments

EPSAT (environment power system analysis tool) is used to examine the design of SPEAR III, which is scheduled to fly in early 1991. It will test high-voltage designs in both ambient and system-generated environments. Two of the key questions that the experiment hopes to address are whether or not the earth's magnetic field can cause the current that a high-voltage object draws from the plasma to be far less than the current that would be drawn in the absence of the magnetic field and under what neutral environmental conditions a discharge from the high-voltage object to the plasma will occur. The EPSAT program makes it possible to perform a variety of analyses on a preliminary or conceptual-level description of a system in a short period of time. The calculations presented on SPEAR III are all done for a conceptual-level description. The calculations indicate that the experiment will produce the conditions necessary to address these questions.

Kuharski, Robert A.

Effect of accuracy of wind power prediction on power system operator

This research project proposed a modified unit commitment that schedules connection and disconnection of generating units in response to load. A modified generation control is also proposed that controls steam units under automatic generation control, fast responding diesels, gas turbines and hydro units under a feedforward control, and wind turbine array output under a closed loop array control. This modified generation control and unit commitment require prediction of trend wind power variation one hour ahead and the prediction of error in this trend wind power prediction one half hour ahead. An improved meter for predicting trend wind speed variation is developed. Methods for accurately simulating the wind array power from a limited number of wind speed prediction records was developed. Finally, two methods for predicting the error in the trend wind power prediction were developed. This research provides a foundation for testing and evaluating the modified unit commitment and generation control that was developed to maintain operating reliability at a greatly reduced overall production cost for utilities with wind generation capacity.

Schlueter, R. A.

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record

The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

Price dynamics in wholesale electricity markets are driven by supply and demand. In markets with hydroelectric dams, the timing and amount of hydropower offered can influence prices in similar ways to wind and solar power. Unlike variable renewable energy, however, the supply of hydropower in wholesale markets is a function of both water availability and operational decisions at dams. Dam operators maximize revenues in wholesale markets by aligning generation with the periods of highest expected prices, and these scheduling decisions may in turn influence prices. Here, we examine the relative importance of two types of information in predicting forward electricity prices: a) water availability at dams, in the form of short-to-medium-range hydrological forecasts; and b) hourly scheduling decisions at dams. Using softly coupled hydrologic, hydropower scheduling, and power systems models spanning the U.S. Western Interconnection, we quantify the importance of hydrologic forecast accuracy in correctly predicting wholesale electricity prices and compare this with the influence of dam operators’ own hourly scheduling decisions on realized market prices. We find that aligning hydropower generation schedules with the periods of high forecasted prices causes larger, inadvertent price forecast errors than imperfect hydrologic forecasts. This suggests that knowledge of how water is managed by dam operators within the week is more important than weekly inflow forecast errors when predicting forward electricity prices. Our findings have implications for optimal hydropower scheduling by region. Specifically, accounting for price effects is critical in markets dominated by hydropower capacity.

Electricity markets

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.

The design of a turboshaft speed governor using modern control techniques

The objectives of this program were: to verify the model of off schedule compressor variable geometry in the T700 turboshaft engine nonlinear model; to evaluate the use of the pseudo-random binary noise (PRBN) technique for obtaining engine frequency response data; and to design a high performance power turbine speed governor using modern control methods. Reduction of T700 engine test data generated at NASA-Lewis indicated that the off schedule variable geometry effects were accurate as modeled. Analysis also showed that the PRBN technique combined with the maximum likelihood model identification method produced a Bode frequency response that was as accurate as the response obtained from standard sinewave testing methods. The frequency response verified the accuracy of linear models consisting of engine partial derivatives and used for design. A power turbine governor was designed using the Linear Quadratic Regulator (LQR) method of full state feedback control. A Kalman filter observer was used to estimate helicopter main rotor blade velocity. Compared to the baseline T700 power turbine speed governor, the LQR governor reduced droop up to 25 percent for a 490 shaft horsepower transient in 0.1 sec simulating a wind gust, and up to 85 percent for a 700 shaft horsepower transient in 0.5 sec simulating a large collective pitch angle transient.

Delosreyes, G.

Concepts for design of an energy management system incorporating dispersed storage and generation

New forms of generation based on renewable resources must be managed as part of existing power systems in order to be utilized with maximum effectiveness. Many of these generators are by their very nature dispersed or small, so that they will be connected to the distribution part of the power system. This situation poses new questions of control and protection, and the intermittent nature of some of the energy sources poses problems of scheduling and dispatch. Under the assumption that the general objectives of energy management will remain unchanged, the impact of dispersed storage and generation on some of the specific functions of power system control and its hardware are discussed.

Kirkham, H.

Frequency-Nadir-Constrained Unit Commitment for Low-Inertia, High-IBR Island Power Systems [Slides]

The process of energy decarbonization in island power systems is accelerated due to the swift integration of inverter-based renewable energy resources (IBRs). The unique features of such systems, including rapid frequency changes resulting from potential generation outages or imbalances due to the unpredictability of renewable power, pose a significant challenge in maintaining the frequency nadir without external support. This paper presents a unit commitment (UC) model with data-driven frequency nadir constraints, including either frequency nadir or minimum inertia requirements, helping to limit frequency deviations after significant generator outages. The constraints are formulated using a linear regression model that takes advantage of real-world, year-long generation scheduling and dynamic simulation data. The efficacy of the proposed UC model is verified through a year-long simulation in an actual island power system using historical weather data. The alternative minimum inertia constraint, derived from actual system operation assumptions, is also evaluated. Findings demonstrate that the proposed frequency nadir constraint notably improves the system's frequency nadir under high photovoltaic (PV) penetration levels, albeit with a slight increase in generation costs, when compared to the alternative minimum inertia constraint.

14 SOLAR ENERGY

Improved techniques for predicting spacecraft power

Radioisotope Thermoelectric Generators (RTGs) are going to supply power for the NASA Galileo and Ulysses spacecraft now scheduled to be launched in 1989 and 1990. The duration of the Galileo mission is expected to be over 8 years. This brings the total RTG lifetime to 13 years. In 13 years, the RTG power drops more than 20 percent leaving a very small power margin over what is consumed by the spacecraft. Thus it is very important to accurately predict the RTG performance and be able to assess the magnitude of errors involved. The paper lists all the error sources involved in the RTG power predictions and describes a statistical method for calculating the tolerance.

Chmielewski, A. B.

Nonlinear dynamic simulation of single- and multi-spool core engines

In this paper a new computational method for accurate simulation of the nonlinear dynamic behavior of single- and multi-spool core engines, turbofan engines, and power generation gas turbine engines is presented. In order to perform the simulation, a modularly structured computer code has been developed which includes individual mathematical modules representing various engine components. The generic structure of the code enables the dynamic simulation of arbitrary engine configurations ranging from single-spool thrust generation to multi-spool thrust/power generation engines under adverse dynamic operating conditions. For precise simulation of turbine and compressor components, row-by-row calculation procedures were implemented that account for the specific turbine and compressor cascade and blade geometry and characteristics. The dynamic behavior of the subject engine is calculated by solving a number of systems of partial differential equations, which describe the unsteady behavior of the individual components. In order to ensure the capability, accuracy, robustness, and reliability of the code, comprehensive critical performance assessment and validation tests were performed. As representatives, three different transient cases with single- and multi-spool thrust and power generation engines were simulated. The transient cases range from operating with a prescribed fuel schedule, to extreme load changes, to generator and turbine shut down.

Schobeiri, T.

Development Status: Automation Advanced Development Space Station Freedom Electric Power System

Electric power system automation for Space Station Freedom is intended to operate in a loop. Data from the power system is used for diagnosis and security analysis to generate Operations Management System (OMS) requests, which are sent to an arbiter, which sends a plan to a commander generator connected to the electric power system. This viewgraph presentation profiles automation software for diagnosis, scheduling, and constraint interfaces, and simulation to support automation development. The automation development process is diagrammed, and the process of creating Ada and ART versions of the automation software is described.

Dolce, James L.

The Power of Pausing: Advancing Understanding of Thermalization in Experimental Quantum Annealers

We investigate alternative annealing schedules on the current generation of quantum annealing hardware (the D-Wave 2000Q), which includes the use of forward and reverse annealing with an- intermediate pause. This work provides new insights into the inner workings of these devices (and quantum devices in general), particular into how thermal effects govern the system dynamics. We show that a pause mid-way through the anneal can cause a dramatic change in the output distribution, and we provide evidence suggesting thermalization is indeed occurring during such a pause. We demonstrate that upon pausing the system in a narrow region shortly after the minimum gap, the probability of successfully finding the ground state of the problem Hamiltonian can be increased by several orders of magnitude. We relate this effect to relaxation (i.e. thermalization) after diabatic and thermal excitations that occur in the region near to the minimum gap. For a set of large-scale problems of up to 500 qubits, we demonstrate that the distribution returned from the annealer very closely matches a (classical) Boltzmann distribution of the problem Hamiltonian, albeit one with a temperature at least 1.5 times higher than the (effective) temperature of the device. Moreover, we show that larger problems are more likely to thermalize to a classical Boltzmann distribution.

Marshall, Jeffrey

The Influence of Shielding Gas on the Wire-Arc Additive Manufacturing (WAAM) of Ni-Based Superalloy Haynes 282

Wire-arc additive manufacturing (WAAM) enables building large near-net-shaped parts using fast deposition rates and is attractive due to the potential cost and schedule savings. Haynes® 282® is a Ni-based superalloy with wide application in advanced power generation systems for its superior high temperature mechanical properties. High-quality WAAM H282 parts are achieved through careful process optimization, hence, we have focused on systematically characterizing the processing-structure-properties relationships over a wide range of wire-feed and travel speeds using a standard Ar30He shielding gas. Here the influence of adding 0.25-3% of H2 and CO2 to Ar-30He standard on our findings is examined. Multi-bead tracks were used to screen 20+ gas combinations to examine impact on wettability, porosity, oxidation, and grain structures. Improved multi-tracks are observed for gases with up to 1% H2 and 0.25% CO2. WAAM H282 builds within this range are examined to reveal differences in microstructure as evaluated with CT, SEM-EDS, and EBSD.