Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-scale dynamic modeling and validation of radial flow fixed bed contactors for post-combustion CO 2 capture using bench scale and pilot plant data

Here, in this work, a multi-scale model of a radial flow fixed bed contactor packed with a carbon sorbent is developed and validated with laboratory-scale and pilot plant scale dynamic data. For the lab scale system, the model results were compared with low, medium and high gas and sweep flowrates, yielding root mean square error (RMSE) of 0.80, 0.63, 0.96 CO 2 mol%, respectively, for the outlet CO 2 concentration profile considering the entire A-D cycle. For the bed outer temperature profile, maximum RMSE was found to be 5.5 °C considering all flowrates and entire A-D cycles. An experimental campaign was developed and applied to a pilot plant at Technology Center Mongstad (TCM), Norway. Approaches were developed for pre-processing of data including consideration of the effect of gas mixing, measurement delay, and determination of cyclic steady-state conditions. Considering profiles during A-D cycles for all test runs, it was found that the maximum RMSE for pressure drop, temperature for the outer section of the bed, temperature for the middle section of the bed, and outlet CO 2 concentration profile remained less than 1.5 mbar, 3.5 °C, 2.8 °C, and 1.3 CO 2 mol%, respectively. The validated model was used to perform sensitivity studies on several key design operating variables for the adsorption-desorption cycle. It was found that the flow rate and concentration of flue gas have dominant nonlinear effects on the breakthrough time while the desorption time was strongly affected by the sweep gas flowrate for the specific sorbent being evaluated in this study.

20 FOSSIL-FUELED POWER PLANTS↗

The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

Waste Management/instrumentation/methods↗

Improved Modeling of Waste Isolation Pilot Plant Disposal Room Porosity

Disposal rooms at the Waste Isolation Pilot Plant (WIPP) contain waste and gas, and their porosity evolves over time. This report presents several improvements to the disposal room porosity model and presents new porosity predictions for use in future WIPP Performance Assessment activities. The improvements pertain to three sub-models: the geomechanical model, the waste compaction model, and the gas pressurization model. The impacts of each major improvement were quantified and the new porosity predictions were shown to be both mesh and domain size converged. Also, sensitivity studies on the disposal room horizon, clay seam friction coefficients, and homogenized waste representation were performed to support assumptions in the disposal room porosity model. To compare the legacy and new porosity predictions, the simulation results were plotted as a response surface, where gas pressure and time are inputs and porosity is the output. The new porosity response surface is insensitive to pressures beneath lithostatic pressure and highly sensitive to pressures above lithostatic pressure. The legacy porosity response surface, on the other hand, has moderate porosity gradients over all pressures. The new porosity response surface has a stronger scientific foundation than the legacy surface and may now be used for Compliance Decision Analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗

An Assessment of the Error Due to Computing Waste Isolation Pilot Plant Porosity Using the Porosity Response Surface Approach

The Waste Isolation Pilot Plant Performance Assessment (WIPP PA) must predict the likelihood that radionuclides will escape into the biosphere via mechanisms that depend on geohydraulic flow. Ideally, one would predict the geohydraulic flow using coupled geohydraulic and geomechanical simulations, but such coupled simulations are not computationally tractable. Instead, Sandia has historically used a look-up table of porosities for a given fluid pressure and time, called the porosity response surface, but this approach can introduce porosity errors because it largely ignores the porosity’s dependence on the past fluid pressure history. This report discusses efforts to quantify these porosity errors for both the legacy and new porosity response surfaces. Six hundred different fluid pressure histories were fed through the legacy/new geomechanical model and the legacy/new porosity response surface to generate six hundred porosity error histories. The error associated with the legacy porosity surface was substantial, while the error associated with the new porosity surface was typically small, except when fluid pressures exceeded the lithostatic pressure at the repository. In response to the errors at high pressures, a preliminary study of the WIPP PA’s sensitivity to these porosity errors was conducted. The study found that reducing the porosity errors at high pressures negligibly affected predictions of radionuclide releases. Finally, an initial machine-learned model for porosity was developed. This ML model significantly reduced the porosity error at high pressures, but sizable errors remained, so more development is necessary before coupling an ML model to the geohydraulic model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of a silver-based sanitizer to accelerate Escherichia coli die-off on fresh-cut lettuce and maintain produce quality during cold storage: Laboratory and pilot-plant scale tests

Outbreaks and product recalls involving romaine and iceberg lettuce are frequently reported in the United States. Novel technologies are needed to inactivate pathogens without compromising product quality and shelf life. In this study, the effects of a process aid composed of silver dihydrogen citrate, glycerin, and lactic acid (SGL) on Escherichia coli and Listeria monocytogenes concentrations on lettuce immediately after washing and during cold storage were evaluated. Sensory and quality attributes of fresh-cut iceberg lettuce were also evaluated. Laboratory results indicated that application of SGL solution for 30 s as a first step in the washing process resulted in a 3.15 log reduction in E. coli O157:H7 immediately after washing. For E. coli O157:H7 a significant difference between SGL treatment and all other treatments was maintained until day 7. On day zero, SGL led to a 2.94 log reduction of L. monocytogenes. However, there was no significant difference between treatments with or without SGL regardless of storage time. Pilot-plant results showed that samples receiving SGL spray followed by chlorinated flume wash exhibited a greater reduction (1.48 log) in nonpathogenic E. coli populations at the end of shelf life than other treatments (p < 0.05). Additional pilot plant tests were conducted to investigate the hypothesis that SGL residues could continue to impact microbial survival on the final washed lettuce. Results show that pathogens introduced subsequent to flume washing of lettuce pretreated with SGL solution were not affected by antimicrobial residues. Here, the final quality and shelf life of flume washed lettuce were also unaffected by pretreatment with SGL. In conclusion, the results of this study demonstrate that this new technology has the potential to accelerate E. coli die-off on fresh-cut lettuce during cold storage and improve product safety, while not affecting quality throughout the shelf life of the finished products.

59 BASIC BIOLOGICAL SCIENCES↗

Space Solar Power Concepts: Demonstrations to Pilot Plants

The availability of abundant, affordable power where needed is a key to the future exploration and development of space as well as future sources of clean terrestrial power. One innovative approach to providing such power is the use of wireless power transmission (WPT). There are at least two possible WPT methods that appear feasible; microwave and laser. Microwave concepts have been generated, analyzed and demonstrated. Technologies required to provide an end-to-end system have been identified and roadmaps generated to guide technology development requirements. Recently, laser W T approaches have gained an increased interest. These approaches appear to be very promising and will possibly solve some of the major challenges that exist with the microwave option. Therefore, emphasis is currently being placed on the laser WPT activity. This paper will discuss the technology requirements, technology roadmaps and technology flight experiments demonstrations required to lead toward a pilot plant demonstration. Concepts will be discussed along with the modeling techniques that are used in developing them. Feasibility will be addressed along with the technology needs, issues and capabilities for particular concepts. Flight experiments and demonstrations will be identified that will pave the road from demonstrations to pilot plants and beyond.

Carrington, Connie K.↗

A scoping study of far-SOL main-wall protection limiters for steady-state operation of compact pilot plant tokamaks

We present a novel method for handling steady-state heat fluxes incident on the main wall of pilot plant-scale magnetic fusion devices, based on the utilization of protection limiters in the far scrape-off layer (SOL). This method helps avoid large plasma-wall gaps, without excessively compromising blanket performance. We present an optimization algorithm for determining the appropriate size and scale of these protection limiters given (1) probability distributions of SOL plasma parameters and (2) assumed risk tolerance. As part of this optimization, we have developed an analytic description of parallel heat fluxes across limiter shadows, and an objective cost function (the ‘Far-SOL Marginal Cost’) to quantify the impact that different main-wall thermal management design choices have on reactor capital cost. Applying the model to a midscale fusion pilot plant concept shows that making use of far-SOL protection limiters can reduce capital costs on the order of $500 M, relative to naively increasing the plasma-wall gap. Our analysis demonstrates that the far-SOL power decay length is the highest-leverage plasma assumption for thermal loading of the first wall, and the primary cost driver for main wall thermal management. The relative cost efficiency of protection limiters increases as assumptions on the far-SOL heat flux become more pessimistic. The concepts described in this paper motivate the further development of far-SOL protection limiters as part of larger efforts to design economical core-edge-wall compatible solutions for a fusion pilot plant.

Design under uncertainty↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.

01 COAL, LIGNITE, AND PEAT↗

Improbability of Post-Closure Criticality in Array of Transuranic Waste Containers after Compaction by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, post-closure nuclear criticality is improbable when room closure compacts containers disposing transuranic (TRU) waste emplaced at the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt in southeastern New Mexico. As described in the original WIPP certification, a qualitative estimate of the probability of post-closure criticality in TRU waste produced from atomic energy defense activities has been low either because remote-handled TRU waste canisters are neutronically isolated by the bedded salt or because the low fissile mass in an array of contact-handled TRU waste drums cannot be compacted sufficiently by room closure from salt creep. These situations are still valid for the majority of TRU waste that is disposed at WIPP without any disposal constraints, as updated herein. This report also qualitatively evaluates the probability of criticality after disposal of TRU waste in pipe overpack containers (POC) where every POC in a shipment may have the maximum 200 fissile gram equivalent of 239Pu content. The probability of criticality for a disposal room filled with POCs is estimated during four representative phases of repository evolution: (1) a large salt block falls onto POCs in the first 20 years, (2) salt creep closes a disposal room in the first 1000 years without brine seepage and subsequent gas generation, which permits maximum compaction, (3) some brine seepage occurs into the closed room, which initiates consumption of the fiberboard (cellulose) impact absorber in the POC in the second 1000 years, and (4) full brine inundation of a room and consumption of all fiberboard thereafter. Salt-block fall in the first phase does not greatly disrupt three tiers of POCs. The compacted spacing of POCs in the later three repository conditions is calculated through high-fidelity, geomechanical modeling. Criticality evaluation of compacted 200-g 239 Pu spheres at the compacted spacing shows that neither 12-inch nor 6-inch POCs are critical after the first 1000 years, the second 1000 years, or thereafter as the sea of reflector material changes to represent the three repository conditions. Specifically, fiberboard and iron isolates 239 Pu while dry, and brine reduces the reactivity when a room is partially and fully inundated. Because POC behavior bounds behavior of other standard TRU waste containers, post-closure criticality caused by room closure compacting containers is omitted in the performance assessments for the 2019 and 2026 WIPP compliance re-certification applications to the US Environmental Protection Agency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in the development and understanding of a high poloidal-beta tokamak operating scenario for an attractive fusion pilot plant

Abstract The high poloidal-beta ( $$\beta _{\textrm{P}}$$ β P ) regime was first proposed as a high bootstrap current scenario for a steady-state fusion pilot plant (FPP) in the 1990s (Kikuchi in Nucl Fusion 30:265, 1990). Since then, there have been many theoretical, modeling, and experimental research activities on this topic. A joint DIII-D/EAST research team began exploring the high- $$\beta _{\textrm{P}}$$ β P regime in 2013, focusing on addressing the needs of attractive FPP design by taking advantage of the extensive diagnostic set and sophisticated plasma control system on DIII-D and the well-developed integrated modeling capability at General Atomics. The ultimate goal is to demonstrate such a scenario on EAST with truly long pulse and metal wall compatibility. This paper summarizes the highlights of the research results on DIII-D by the joint team in the past decade. Experimental evidence and modeling analysis show the high- $$\beta _{\textrm{P}}$$ β P scenario has great advantages in addressing key needs for an attractive FPP design, such as high-energy confinement quality at low rotation, excellent core-edge integration, high line-averaged density above the Greenwald limit, low disruption risk, and high bootstrap current fraction for steady-state operation. This provides a relatively safe and economical option to base an FPP design on that will lead to commercial fusion energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

Fusion pilot plant performance and the role of a sustained high power density tokamak

Here, recent U.S. fusion development strategy reports all recommend that the U.S. should pursue innovative science and technology to enable construction of a fusion pilot plant (FPP) that produces net electricity from fusion at low capital cost. Compact tokamaks have been proposed as a means of potentially reducing the capital cost of a FPP. However, compact steady-state tokamak FPPs face the challenge of integrating a high fraction of self-driven current with high core confinement, plasma pressure, and high divertor parallel heat flux. This integration is sufficiently challenging that a dedicated sustained-high-power-density (SHPD) tokamak facility is proposed by the U.S. community as the optimal way to close this integration gap. Performance projections for the steady-state tokamak FPP regime are presented and a preliminary SHPD device with substantial flexibility in lower aspect ratio (A = 2–2.5), shaping, and divertor configuration to narrow gaps to an FPP is described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CTES Pilot Plant Detailed Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the Detailed Design phase deliverables comprising of the process, mechanical, electrical, piping along with control and instrumentation documents. Civil and structural deliverables are included on a preliminary basis due to outstanding site investigation activities. CTES block transportation testing results and the pilot plant testing plan is also included in this report.

25 ENERGY STORAGE↗

Overview of advanced plasma-facing materials testing for Fusion Pilot Plants at DIII-D

Characterization and testing of advanced plasma-facing materials (PFMs) for Fusion Pilot Plants (FPP) is being conducted at the DIII-D National Fusion Facility through the ongoing two-year FPP Candidate Materials Thrust. Year one tested 17 novel materials utilizing the Divertor Materials Evaluation System (DiMES), with samples analyzed pre- and post-experiment via SEM, EDS, and confocal microscopy. Repeatable reference discharges were developed to ensure uniformity between experiments, including a new strike-point rastering scenario to provide more uniform heat/particle flux across DiMES during ELMing H-mode discharges. Various sample geometries and temperatures were used to achieve FPP-relevant conditions, including samples angled 10° towards the incident plasma flux and pre-heating up to 500 °C. The first exposure of liquid lithium (Li) capillary porous structures in a tokamak demonstrated uniform emission of Li vapor and suppression of Li droplets in H-mode when preheated to 350 °C. Dispersoid-strengthened W with 1 wt% TaC, TiC, and ZrC exposed to H-mode showed cracking and dispersoid ejection for all varieties except TiC, providing a clear down-selection. Ultra-high temperature ceramic materials TiB 2 and ZrB 2 showed minimal degradation under L-mode exposure. Silicon carbide (SiC) fiber composites showed arcing along edges, while CVD SiC remained pristine. Atmospheric plasma-sprayed W and SiC coatings endured H-mode exposure without macroscopic delamination; SiC exhibited granular ejection, while W showed increased outgassing. Additional W-based alloys were stress tested in H-mode, including Ni-based W heavy alloys, W f SiC f /W composites, W multi-principle element alloys, and functionally-graded W/SiC, to varying degrees of success.

DIII-D↗

Improved Compaction Experiments and Modeling of Waste Isolation Pilot Plant Standard, Non-degraded, Waste Containers

A credible simulation of disposal room porosity at the Waste Isolation Pilot Plant (WIPP) requires a tenable compaction model for the 55-gallon waste containers within the room. A review of the legacy waste material model, however, revealed several out-of-date and untested assumptions that could affect the model’s compaction behavior. For example, the legacy model predicted non-physical tensile out-of-plane stresses under plane strain compression. (Plane strain compression is similar to waste compaction in the middle of a long drift.) Consequently, a suite of new compaction experiments were performed on containers filled with surrogate, non-degraded, waste. The new experiments involved uniaxial, triaxial, and hydrostatic compaction tests on quarter-scale and full-scale containers. Special effort was made to measure the volume strain during uniaxial and triaxial tests, so that the lateral strain could be inferred from the axial and volume strain. These experimental measurements were then used to calibrate a pressure dependent, viscoplastic, constitutive model for the homogenized compaction behavior of the waste containers. This new waste material model’s predictions agreed far better with the experimental measurements than the legacy model’s predictions, especially under triaxial and hydrostatic conditions. Under plane strain compression, the new model predicted reasonable compressive out-of-plane stresses, instead of tensile stresses. Moreover, the new model’s plane strain behavior was substantially weaker for the same strain, yet substantially stronger for the same porosity, than the legacy model’s behavior. Although room for improvement exists, the new model appears ready for prudent engineering use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗