Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Report for Task 15: Developed Tool Verification/Validation Report (Deliverable D11): AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency

This report summarizes the verification report for the developed modules. The team conducted verification in two phases. In phase 1, the modules were validated using offline validation methods and in phase 2 the modules were subjected to real-time validation. This report outlines the approach and the results for the modules under offline and real-time settings. The rest of the report details the functional workflow of AGGREGATE modules, we then transition to offline validation followed by real-time validation of modules. We conclude the report by discussing some of the key points of this report.

14 SOLAR ENERGY↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Operating and Managing a Backup Control Center

Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC increases, HOSC must begin a phased activation of the BCC, while working resource conflicts with normal HOSC activities. In a long duration outage to the MCC, this could cause serious impacts to the BCC host facility s primary mission support activities. This management of a BCC is worked based on customer expectations and negotiations done before emergencies occur. I.

Marsh, Angela L.↗

Optimization of the effective GPS data rate

Ohio University's Avionics Engineering Center is performing research directed towards the integration of the NAVSTAR Global Positioning System (GPS) and the Inertial Navigation System (INS) for attitude and heading determination. The integration of GPS/INS offers synergistic benefits. INS gyro drift error can be compensated by the long-term stability of GPS by means of an in-flight data monitoring algorithm. Using GPS data as a reference is more advantageous than implementing an additional INS since GPS offers a dissimilar redundancy to the attitude and heading determination configuration. In converse, the short-term stability of the INS can be used to correct or substitute for faulty GPS data due to tracking loop phase lag or data gaps because of satellite shielding. The optimization of the effective GPS data rate is essential for the proper execution of an integrated GPS/INS in-flight algorithm. GPS attitude and heading information must be consistently available during INS outages. Present research efforts involve the development of an in-flight algorithm that maximizes the potential of integrated GPS/INS. This algorithm determines the acceptable limits of phase lag that the GPS tracking loop introduces to the flight control system (FCS) during the transmission of information. Once these calculated limits are exceeded, INS data are used to insure the continuous availability of attitude and heading information to the flight control system.

Mcintyre, David S.↗

PMU-data-driven Event Classification in Power Transmission Grids

This paper presents an event classification in transmission grids. The convolutional neural network (CNN)-based classifier is proposed to capture the temporal similarity of time-synchronized data stream from phasor measurement units (PMUs). The proposed CNN is trained using Bayesian optimization to search for the best hyperparameters. The effectiveness of the proposed event classification is validated through the real-world dataset from the U.S. transmission grids. This dataset includes line outage, transformer outage, frequency, and oscillation events. The validation process also includes different PMU outputs, such as voltage magnitude, phase angle, current magnitude, frequency, and rate of change of frequency (ROCOF). The results show that ROCOF gives the best classification performance compared to other PMU outputs. In addition, it is shown that the classifier trained with a larger dataset has higher accuracy. Moreover, the superiority of the proposed method is validated through comparison with other state-of-the-art classification methods.

Niazazari, Iman↗

Thermodynamic Cloud Phase Classifications Using Machine Learning at NSA and ANX

Vertically resolved thermodynamic cloud phase classifications are essential for studies of atmospheric cloud and precipitation processes. The Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) THERMOCLDPHASE Value-Added Product (VAP) uses a multi-sensor approach to classify thermodynamic cloud phase by combining lidar backscatter and depolarization, radar reflectivity, Doppler velocity, spectral width, microwave radiometer-derived liquid water path, and radiosonde temperature measurements. The measured voxels are classified as ice, snow, mixed-phase, liquid (cloud water), drizzle, rain, and liq_driz (liquid+drizzle). We use this product as the ground truth to train three machine learning (ML) models to predict the thermodynamic cloud phase from multi-sensor remote sensing measurements taken at the ARM North Slope of Alaska (NSA) observatory: a random forest (RF), a multilayer perceptron (MLP), and a convolutional neural network (CNN) with a U-Net architecture. Evaluations against the outputs of the THERMOCLDPHASE VAP with one year of data show that the CNN outperforms the other two models, achieving the highest test accuracy, F1-score, and mean Intersection over Union (IOU). Analysis of ML confidence scores shows ice, rain, and snow have higher confidence scores, followed by liquid, while mixed, drizzle, and liq_driz have lower scores. Feature importance analysis reveals that the mean Doppler velocity and vertically resolved temperature are the most influential datastreams for ML thermodynamic cloud phase predictions. The ML models’ generalization capacity is further evaluated by applying them at another Arctic ARM site in Norway using data taken during the ARM Cold-Air Outbreaks in the Marine Boundary Layer Experiment (COMBLE) field campaign. Finally, we evaluate the ML models’ response to simulated instrument outages and signal degradation.

54 ENVIRONMENTAL SCIENCES↗

Improving Distribution Resiliency with Microgrids and State and Parameter Estimation

Modern society relies on low-cost reliable electrical power, both to maintain industry, as well as provide basic social services to the populace. When major disturbances occur, such as Hurricane Katrina or Hurricane Sandy, the nation’s electrical infrastructure can experience significant outages. To help prevent the spread of these outages, as well as facilitating faster restoration after an outage, various aspects of improving the resiliency of the power system are needed. Two such approaches are breaking the system into smaller microgrid sections, and to have improved insight into the operations to detect failures or mis-operations before they become critical. Breaking the system into smaller sections of microgrid islands, power can be maintained in smaller areas where distribution generation and energy storage resources are still available, but bulk power generation is no longer connected. Additionally, microgrid systems can maintain service to local pockets of customers when there has been extensive damage to the local distribution system. However, microgrids are grid connected a majority of the time and implementing and operating a microgrid is much different than when islanded. This report discusses work conducted by the Pacific Northwest National Laboratory that developed improvements for simulation tools to capture the characteristics of microgrids and how they can be used to develop new operational strategies. These operational strategies reduce the cost of microgrid operation and increase the reliability and resilience of the nation’s electricity infrastructure. In addition to the ability to break the system into microgrids, improved observability into the state of the distribution grid can make the power system more resilient. State estimation on the transmission system already provides great insight into grid operations and detecting abnormal conditions by leveraging existing measurements. These transmission-level approaches are expanded to using advanced metering infrastructure and other distribution-level measurements to create a three-phase, unbalanced distribution state estimation approach. With distribution-level state estimation, the grid can be operated more efficiently, and outages or equipment failures can be caught faster, improving the overall resilience and reliability of the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Locating, Prediction and Protection (FLPPS)

One of the main objectives of this DOE-sponsored project was to reduce customer outage time. Fault location, prediction, and protection are the most important aspects of fault management for the reduction of outage time. In the past most of the research and development on power system faults in these areas has focused on transmission systems, and it is not until recently with deregulation and competition that research on power system faults has begun to focus on the unique aspects of distribution systems. This project was planned with three Phases, approximately one year per phase. The first phase of the project involved an assessment of the state-of-the-art in fault location, prediction, and detection as well as the design, lab testing, and field installation of the advanced protection system on the SCE Circuit of the Future located north of San Bernardino, CA. The new feeder automation scheme, with vacuum fault interrupters, will limit the number of customers affected by the fault. Depending on the fault location, the substation breaker might not even trip. Through the use of fast communications (fiber) the fault locations can be determined and the proper fault interrupting switches opened automatically. With knowledge of circuit loadings at the time of the fault, ties to other circuits can be closed automatically to restore all customers except the faulted section. This new automation scheme limits outage time and increases reliability for customers. The second phase of the project involved the selection, modeling, testing and installation of a fault current limiter on the Circuit of the Future. While this project did not pay for the installation and testing of the fault current limiter, it did perform the evaluation of the fault current limiter and its impacts on the protection system of the Circuit of the Future. After investigation of several fault current limiters, the Zenergy superconducting, saturable core fault current limiter was selected for installation. Because of some testing problems with the Zenergy fault current limiter, installation was delayed until early 2009 with it being put into operation on March 6, 2009. A malfunction of the FCL controller caused the DC power supply to the superconducting magnet to be turned off. This inserted the FCL impedance into the circuit while it was in normal operation causing a voltage resonance condition. While these voltages never reached a point where damage would occur on customer equipment, steps were taken to insure this would not happen again. The FCL was reenergized with load on December 18, 2009. A fault was experienced on the circuit with the FCL in operation on January 14, 2010. The FCL operated properly and reduced the fault current by about 8%, what was expected from tests and modeling. As of the end of the project, the FCL was still in operation on the circuit. The third phase of the project involved the exploration of several advanced protection ideas that might be at a state where they could be applied to the Circuit of the Future and elsewhere in the SCE electrical system. Based on the work done as part of the literature review and survey, as well as a number of internal meetings with engineering staff at SCE, a number of ideas were compiled. These ideas were then evaluated for applicability and ability to be applied on the Circuit of the Future in the time remaining for the project. Some of these basic ideas were implemented on the circuit including measurement of power quality before and after the FCL. It was also decided that we would take what was learned as part of the Circuit of the Future work and extend it to the next generation circuit protection for SCE. Also at this time, SCE put in a proposal to the DOE for the Irvine Smart Grid Demonstration using ARRA funding. SCE was successful in obtaining funding for this proposal, so it was felt that exploration of new protection schemes for this Irvine Smart Grid Demonstration would be a good use of the project resources. With this in mind, a protection system that uses fault interrupting switches, high speed communications, and looping two radial distribution circuits would have the potential for significant reductions in interruption time and number of interruptions for customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Communications Blackout Prediction for Atmospheric Entry of Mars Science Laboratory

When a supersonic spacecraft enters a planetary atmosphere with v >> v(sub sound), a shock layer forms in the front of the body. An ionized sheath of plasma develops around the spacecraft, which results from the ionization of the atmospheric constituents as they are compressed and heated by the shock or heated within the boundary layer next to the surface. When the electron density surrounding the spacecraft becomes sufficiently high, communications can be disrupted (attenuation/blackout). During Mars Science Laboratory's (MSL's) atmospheric entry there will likely be a communication outage due to charged particles on the order of 60 to 100 seconds using a UHF link frequency looking out the shoulders of the wake region to orbiting relay asset. A UHF link looking out the base region would experience a shorter duration blackout, about 35 seconds for the stressed trajectory and possibly no blackout for the nominal trajectory. There is very little likelihood of a communications outage using X-band (however, X-band is not currently planned to be used during peak electron density phase of EDL).

entry descent landing↗

Remote Off-grid Microgrid Design Support Tool (ROMDST) - An Optimal Design Support Tool for Remote, Resilient, and Reliable Microgrids Phase II - Final Report

The objective of the project is to develop an advanced optimization-based design support tool for AC or DC microgrids in remote locations, where utility grids may not be accessible. The mathematical model and the interface are being developed such that multiple design objectives and criteria/constraints can be easily enabled or disabled, to deliver a flexible tool relevant to a large, diverse user base, and to facilitate future feature developments. The new tool delivered by this project leverages the team’s extensive expertise in the development, testing, deployment, and commercialization of the state-of-the-art Distributed Energy Resources Customer Adoption Model (DER-CAM) – which is the foundation for the new tool. Phase I of the project leverages the microgrid design and decision support tool DER-CAM. Key Phase I developments include the following adaption to the DER-CAM model: a) AC or DC microgrid architectures, b) multiple economic objectives (e.g. single customer vs community vs utility perspective), c) constraints on fuel availability (e.g. total fuel available during outage periods), d) active and reactive power flow constraints for normal and N-1 contingency cases, e) component part load efficiencies (e.g. power electronic devices), and f) interactive data visualization capabilities (e.g. design topology elements). A component library including components’ default technical and economical characteristics was also developed. In Phase II, the project is focused on tool testing and validation, use for real-world microgrid designs, and outreach. Fully developing this tool will have the following impacts: 1) optimal off-grid microgrid designs that replace existing back of the envelope or non-optimal calculations, reducing capital costs and risk of microgrid deployment; 2) removing barriers to microgrid assessments by lowering microgrid soft costs, as the tool is freely usable; 3) reliable and resilient designs that reduce the cost of critical load shedding due to component outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Remote Off-grid Microgrid Design Support Tool (ROMDST) - An Optimal Design Support Tool for Remote, Resilient, and Reliable Microgrids (Phase II, Final Report)

The objective of the project is to develop an advanced optimization-based design support tool for AC or DC microgrids in remote locations, where utility grids may not be accessible. The mathematical model and the interface are being developed such that multiple design objectives and criteria/constraints can be easily enabled or disabled, to deliver a flexible tool relevant to a large, diverse user base, and to facilitate future feature developments. The new tool delivered by this project leverages the team’s extensive expertise in the development, testing, deployment, and commercialization of the state-of-the-art Distributed Energy Resources Customer Adoption Model (DER-CAM) – which is the foundation for the new tool. Phase I of the project leverages the microgrid design and decision support tool DER-CAM. Key Phase I developments include the following adaption to the DER-CAM model: a) AC or DC microgrid architectures, b) multiple economic objectives (e.g. single customer vs community vs utility perspective), c) constraints on fuel availability (e.g. total fuel available during outage periods), d) active and reactive power flow constraints for normal and N-1 contingency cases, e) component part load efficiencies (e.g. power electronic devices), and f) interactive data visualization capabilities (e.g. design topology elements). A component library including components’ default technical and economical characteristics was also developed. In Phase II, the project is focused on tool testing and validation, use for real-world microgrid designs, and outreach. Fully developing this tool will have the following impacts: 1) optimal off-grid microgrid designs that replace existing back of the envelope or non-optimal calculations, reducing capital costs and risk of microgrid deployment; 2) removing barriers to microgrid assessments by lowering microgrid soft costs, as the tool is freely usable; 3) reliable and resilient designs that reduce the cost of critical load shedding due to component outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures

We consider the reliability analysis of phased-mission systems with common-cause failures in this paper. Phased-mission systems (PMS) are systems supporting missions characterized by multiple, consecutive, and nonoverlapping phases of operation. System components may be subject to different stresses as well as different reliability requirements throughout the course of the mission. As a result, component behavior and relationships may need to be modeled differently from phase to phase when performing a system-level reliability analysis. This consideration poses unique challenges to existing analysis methods. The challenges increase when common-cause failures (CCF) are incorporated in the model. CCF are multiple dependent component failures within a system that are a direct result of a shared root cause, such as sabotage, flood, earthquake, power outage, or human errors. It has been shown by many reliability studies that CCF tend to increase a system's joint failure probabilities and thus contribute significantly to the overall unreliability of systems subject to CCF.We propose a separable phase-modular approach to the reliability analysis of phased-mission systems with dependent common-cause failures as one way to meet the above challenges in an efficient and elegant manner. Our methodology is twofold: first, we separate the effects of CCF from the PMS analysis using the total probability theorem and the common-cause event space developed based on the elementary common-causes; next, we apply an efficient phase-modular approach to analyze the reliability of the PMS. The phase-modular approach employs both combinatorial binary decision diagram and Markov-chain solution methods as appropriate. We provide an example of a reliability analysis of a PMS with both static and dynamic phases as well as CCF as an illustration of our proposed approach. The example is based on information extracted from a Mars orbiter project. The reliability model for this orbiter considers the various phases of Launch, Cruise, Mars Orbit Insertion, and Orbit. Some of the CCF for the orbiter in this mission include environmental effects, such as micrometeoroids, human operator errors, and software errors.

reliability analysis↗

Demonstration of a Novel Synchrophasor-based Situational Awareness System: Wide Area Power System Visualization, On-line Event Replay and Early Warning of Grid Problems

Since the large North Eastern power system blackout on August 14, 2003, U.S. electric utilities have spent lot of effort on preventing power system cascading outages. Two of the main causes of the August 14, 2003 blackout were inadequate situational awareness and inadequate operator training In addition to the enhancements of the infrastructure of the interconnected power systems, more research and development of advanced power system applications are required for improving the wide-area security monitoring, operation and planning in order to prevent large- scale cascading outages of interconnected power systems. It is critically important for improving the wide-area situation awareness of the operators or operational engineers and regional reliability coordinators of large interconnected systems. With the installation of large number of phasor measurement units (PMU) and the related communication infrastructure, it will be possible to improve the operators’ situation awareness and to quickly identify the sequence of events during a large system disturbance for the post-event analysis using the real-time or historical synchrophasor data. The purpose of this project was to develop and demonstrate a novel synchrophasor-based comprehensive situational awareness system for control centers of power transmission systems. The developed system named WASA (Wide Area Situation Awareness) is intended to improve situational awareness at control centers of the power system operators and regional reliability coordinators. It consists of following main software modules: • Wide-area visualizations of real-time frequency, voltage, and phase angle measurements and their contour displays for security monitoring. • Online detection and location of a major event (location, time, size, and type, such as generator or line outage). • Near-real-time event replay (in seconds) after a major event occurs. • Early warning of potential wide-area stability problems. The system has been deployed and demonstrated at the Tennessee Valley Authority (TVA) and ISO New England system using real-time synchrophasor data from openPDC. Apart from the software product, the outcome of this project consists of a set of technical reports and papers describing the mathematical foundations and computational approaches of different tools and modules, implementation issues and considerations, lessons learned, and the results of lidation processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corrective Control to Handle Forecast Uncertainty: A Chance Constrained Optimal Power Flow

Higher shares of electricity generation from renewable energy sources and market liberalization is increasing uncertainty in power systems operation. At the same time, operation is becoming more flexible with improved control systems and new technology such as phase shifting transformers (PSTs) and high voltage direct current connections (HVDC). Previous studies have shown that the use of corrective control in response to outages contributes to a reduction in operating cost, while maintaining N-1 security. In this work, we propose a method to extend the use of corrective control of PSTs and HVDCs to react to uncertainty. We characterize the uncertainty as continuous random variables, and define the corrective control actions through affine control policies. This allows us to efficiently model control reactions to a large number of uncertainty sources. The control policies are then included in a chance constrained optimal power flow formulation, which guarantees that the system constraints are enforced with a desired probability. Lastly, by applying an analytical reformulation of the chance constraints, we obtain a second-order cone problem for which we develop an efficient solution algorithm. In a case study for the IEEE 118 bus system, we show that corrective control for uncertainty leads to a decrease in operational cost, while maintaining system security. Further, we demonstrate the scalability of the method by solving the problem for the IEEE 300 bus and the Polish system test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Ride-Through Control Strategy for Single-Phase Virtual Synchronous Generator

This paper presents a fault ride-through control strategy for grid-tied virtual synchronous generator (VSG) under two main grid fault conditions, grid voltage sag fault and unintentional grid outage fault. Considering the overcurrent issue of VSG during the grid voltage sag fault, mechanism on overcurrent issue and the relationship among power angle, voltage amplitude, active power and reactive power are analyzed. Based on the analysis, a control strategy based on direct power angle and voltage amplitude control is proposed. Compared to the common control strategy based on additional inner current loop, the proposed VSG requires no add extra voltage or current sensors. For the grid outage fault, detailed analysis on the relationship among power angle, active power and frequency has been conducted, and it is found that the power angle is related to the output active power when the converter operates on grid-tied condition; under unintentional islanding conditions, the power angle is related to the voltage frequency. Based on the found, a detection method based on small frequency disturbance is proposed. Simulation studies on a prototype VSG system are presented to demonstrate the validity of the proposed control strategy.

Zeng, Rong↗

Flooding Experiments and Modeling for Improved Reactor Safety

Countercurrent two-phase flow and “flooding” phenomena in light water reactor systems are being investigated experimentally and analytically to improve reactor safety of current and future reactors. The aspects that will be better clarified are the effects of condensation and tube inclination on flooding in large diameter tubes. The current project aims to improve the level of understanding of flooding mechanisms and to develop an analysis model for more accurate evaluations of flooding in the pressurizer surge line of a Pressurized Water Reactor (PWR). Interest in flooding has recently increased because Countercurrent Flow Limitation (CCFL) in the AP600 pressurizer surge line can affect the vessel refill rate following a small break LOCA and because analysis of hypothetical severe accidents with the current flooding models in reactor safety codes shows that these models represent the largest uncertainty in analysis of steam generator tube creep rupture. During a hypothetical station blackout without auxiliary feedwater recovery, should the hot leg become voided, the pressurizer liquid will drain to the hot leg and flooding may occur in the surge line. The flooding model heavily influences the pressurizer emptying rate and the potential for surge line structural failure due to overheating and creep rupture. The air-water test results in vertical tubes are presented in this paper along with a semi-empirical correlation for the onset of flooding. The unique aspects of the study include careful experimentation on large-diameter tubes and an integrated program in which air-water testing provides benchmark knowledge and visualization data from which to conduct steam-water testing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Automating Detection and Diagnosis of Faults, Failures, and Underperformance in PV Plants

The project developed hybrid physics-based and machine-learning methods for near-real-time detection of balance-of-system faults (e.g., string, combiner, and tracker outages) in utility-scale Photovoltaic plants, achieving over 50% true positive rates with under 10% false positives and significantly reducing engineering setup time. In the extended phase, the scope expanded to plant-level underperformance analysis and industry benchmarking through the SUPER.epri.com platform. SUPER standardizes data processing and performance metrics across more than 9 GWac and 120+ plants, enabling robust comparisons and insights into loss rates, inverter downtime, and capacity degradation.

14 SOLAR ENERGY↗