Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards a Workforce Roadmap for Distributed Wind: Phase 1 - Identifying Needs and Barriers

Despite recent policy, research efforts, and resources available for utility-scale and offshore wind workforce development, the distributed wind (DW) industry has yet to make similar advances to address its workforce challenges. This report initiates the phased development of a DW workforce roadmap to provide a foundation for roadmap development. Phase 1, contained in this report, uses desk-based research on clean energy workforce approaches and a DW interested-party survey to discuss needs and barriers hindering the workforce from expanding. Findings are summarized into goals and solutions for Phase 2 of roadmap development, which identifies actors responsible for implementing solutions identified in Phase 1. Phase 1 results suggest that the sector's small size and limited growth motivate the short-term need for skilled workers or candidates with well-rounded and multifaceted abilities. Long-term expansion plans must diversify positions while capitalizing on existing utility-scale wind and offshore workforce efforts, as well as other renewable sector best practices where possible. The findings in this report can advance workforce development in the DW sector by aligning interested industry parties around common goals to address challenges. Training providers, installers, operators, manufacturers, federal agencies, national laboratories, academic partners, and labor unions can utilize the findings to help promote sustainable growth of the DW sector.

17 WIND ENERGY↗

Phase 1 Final Technical Report - MgB2 Synthesis for High Field Performance

Accelerator Technology Corp. (ATC) has successfully completed its Phase 1 effort to devel-op rf plasma torch synthesis of MgB2 superconducting powder. The overall objective is to de-velop a way to introduce homogeneous alloying of C and SiC impurities into phase-pure MgB2. Several groups have attained remarkable benefits from such alloying in raising the upper critical field Hc2 from ~14 T to ~30 T (bulk) and ~50 T (thin films). But no one has succeeded in pro-ducing that benefit homogeneously, so that current transport in a practical powder-in-tube (PIT) conductor is largely the same as without the alloying. ATC has conceived the possibility of attaining such homogeneity by passing aerosol suspen-sions of reactant powders through an rf plasma torch, with each reactant transported on a stream-line that heats it to an optimum temperature for the synthesis reaction. This procedure would uniquely access non-equilibrium kinetics for the synthesis reaction, and would provide the possi-bility to separately control the temperature and stoichiometry of each reactant as it enters the mixing region where synthesis occurs. It also facilitates the introduction of seed particles (e.g. nanoscale SiC) to dramatically enhance the rate of the synthesis reaction compared to gas-phase synthesis in rf plasma reported by Canfield and others. During the Phase 1 effort ATC commissioned its 60 kW 5 MHz rf source for a manufactur-ing-scale rf plasma torch. This effort required repair of numerous elements, integration of cooling and input circuits, and tuning of the load characteristics. The effort was successful, and the source has now been tested to ~full power. Also in the Phase 1 effort we encountered a subsidiary but very important problem: the world is running out of the only present supply of phase-pure amorphous boron. The starting boron powder must be in the amorphous phase in order for the synthesis reaction to produce phase-pure MgB2. Even small contamination with crystalline boron results in the formation of parasitic phases such as MgB4, MgB7, etc. Such parasitic phases are a primary element of the connectivity problem, in which even though a sample powder may contain grains of high-quality MgB2, adjacent grains are surrounded by intergrowths of parasitic phases so that current trans-port is badly degraded. The best results to date have been obtained using boron powder produced long ago for a rocket propellant development project. The synthesis process was complex and is now largely lost, and the manufacturing equipment has long since been scrapped. The last batch of the powder has been used during recent years to support MgB2 R&D at several labs, but supplies are dwindling. ATC has identified a first application of its plasma torch to synthesize phase-pure amorphous boron flake using a rapid-quench splat technique. Inexpensive technical-grade boron would be purified of contaminants, then dispersed as an aerosol in inert gas and passed through the plasma torch to melt it into a spray. The spray would be splat-condensed on a rotating drum to form pure amorphous flake. The process would begin with technical-grade boron powder, having good stoichiometric purity, nanoscale particles, but significant contamination of MgO and crystalline boron. We used wet chemistry to remove B2O3 completely and reduced the MgO impurity, and analyzed the particle size distribution using a Coulter counter and the phase composition using X-ray diffrac-tion (XRD). The next step will be to build an rf plasma torch with a recirculating single-component aerosol feed and the cooled splat drum and collector, and undertake process devel-opment for amorphous boron powder. This revised goal has two benefits. First, it is an easier technology than our ultimate goal of a multi-component laminar flow torch. We have been counseled by those experienced in plasma torch technology that our ultimate goal will require a torch that should be feasible but has never been attempted. It may require an extended period of R&D for both the torch itself and the gas dynamics in the reaction region. Second, this simpler single-component process will yield a product powder that is important today for the many groups undertaking powder-metallurgy routes to MgB2. The above success and learning curve has brought us to a significant shift of strategy from what was originally set out in the Phase 1 plan. But this shift has brought us to within sight of a powder product that will itself be an enabling boost for the community of MgB2 developers.

25 ENERGY STORAGE↗

Plug-In Hybrid Electric Vehicle Value Proposition Study: Phase 1, Task 3: Technical Requirements and Procedure for Evaluation of One Scenario

In Task 2, the project team designed the Phase 1 case study to represent the 'baseline' plug-in hybrid electric vehicle (PHEV) fleet of 2030 that investigates the effects of seventeen (17) value propositions (see Table 1 for complete list). By creating a 'baseline' scenario, a consistent set of assumptions and model parameters can be established for use in more elaborate Phase 2 case studies. The project team chose southern California as the Phase 1 case study location because the economic, environmental, social, and regulatory conditions are conducive to the advantages of PHEVs. Assuming steady growth of PHEV sales over the next two decades, PHEVs are postulated to comprise approximately 10% of the area's private vehicles (about 1,000,000 vehicles) in 2030. New PHEV models introduced in 2030 are anticipated to contain lithium-ion batteries and be classified by a blended mileage description (e.g., 100 mpg, 150 mpg) that demonstrates a battery size equivalence of a PHEV-30. Task 3 includes the determination of data, models, and analysis procedures required to evaluate the Phase 1 case study scenario. Some existing models have been adapted to accommodate the analysis of the business model and establish relationships between costs and value to the respective consumers. Other data, such as the anticipated California generation mix and southern California drive cycles, have also been gathered for use as inputs. The collection of models that encompasses the technical, economic, and financial aspects of Phase 1 analysis has been chosen and is described in this deliverable. The role of PHEV owners, utilities (distribution systems, generators, independent system operators (ISO), aggregators, or regional transmission operators (RTO)), facility owners, financing institutions, and other third parties are also defined.

33 ADVANCED PROPULSION SYSTEMS↗

SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Frontier Observatory for Research in Geothermal Energy: Phase 1 Topical Report Fallon, NV

The Department of Energy (DOE) Frontier Observatory for Research in Geothermal Energy (FORGE) is to be a dedicated site where the subsurface scientific and engineering community can develop, test, and improve technologies and techniques for the creation of cost-effective and sustainable enhanced geothermal systems (EGS) in a controlled, ideal environment. The establishment of FORGE will facilitate development of an understanding of the key mechanisms controlling a successful EGS. Execution of FORGE is occurring in three phases with five distinct sub-phases (1, 2A, 2B, 2C, and 3). This report focuses on Phase 1 activities. During Phase 1, critical technical and logistical tasks necessary to demonstrate the viability of the Fallon FORGE Project site were completed and the commitment and capability of the Fallon FORGE team to execute FORGE was demonstrated. As part of Phase 1, the Fallon FORGE Team provided an assessment of available relevant data and integrated these geologic and geophysical data to develop a conceptual 3-D geologic model of the proposed test location. Additionally, the team prepared relevant operational plans for full FORGE implementation, provided relevant site data to the science and engineering community, engaged in outreach and communications with interested stakeholders, and performed a review of the environmental and permitting activities needed to allow FORGE to progress through Phase 3. The results of these activities are provided as Appendices to this report. The Fallon FORGE Team is diverse, with deep roots in geothermal science and engineering. The institutions and key personnel that comprise the Fallon FORGE Team provide a breadth of geoscience and geoengineering capabilities, a strong and productive history in geothermal research and applications, and the capability and experience to manage projects with the complexity anticipated for FORGE. Fallon FORGE Team members include the U.S. Navy, Ormat Nevada Inc., Sandia National Laboratories (SNL), Lawrence Berkeley National Laboratory (LBNL), the United States Geological Survey (USGS), the University of Nevada, Reno (UNR), GeothermEx/Schlumberger (GeothelinEx), and Itasca Consulting Group (Itasca). The site owners (through direct land ownership or via applicable permits)—the U.S. Navy and Ormat Nevada Inc.—are deeply committed to expanding the development of geothermal resources and are fully supportive of FORGE operations taking place on their lands.

15 GEOTHERMAL ENERGY↗

A Data-Agnostic, Continuous Machine Learning Framework for Application in High Energy Physics and Beyond: Phase 1 Final Scientific/Technical Report

This Phase 1 effort has focused on the development of continual learning frameworks for use in machine learning, specifically in the applied context of High Energy Physics (HEP). Machine learning (ML) is a transformative technology by which computers, typically through the use of neural networks, are able to perform tasks with proficiency that rivals or surpasses that of human users. Model Degradation & Catastrophic Forgetting are two undesired phenomena which can occur in ML where the performance of a model degrades when either deployed on novel data streams, or trained on novel data which are sufficiently different than the data the models were initially trained on. A natural example where these sorts of effects can be observed is in the performance of detectors in harsh environments, where the detector signature may change over the lifetime of the detector as it ages and deteriorates — precisely what occurs in the experiments conducted in HEP. Real world HEP data is therefore an excellent test-ground and use-case for Continual Learning paradigms, which are techniques used in ML to counteract these problems. Ensemble learning is one such technique, where multiple smaller models are trained on subsets of the overall data and are ensembled together during inference. The intuition behind this technique is that, although there are shifts in the distributions which govern the incoming data streams, these shifts are not expected to be homogeneous or global. If a sufficient diversity in solutions within the various sub-models has been achieved, then at least one sub-model is expected to retain its performance within the overall ensemble. One further strength of this approach is that the architectures of the various models do not need to be identical, and in fact even different modalities of data can naturally be combined in this way. This work focused on applying ensemble learning techniques to derive results using two main datasets, anomaly detection in HEP data & time-series forecasting in semiconductor manufacturing data. Semiconductor manufacturing involves data with surprising similarity to that of HEP (e.g. wafer maps look very similar to digi-occupancy maps) and Cerium Lab’s prominence within the semiconductor industry makes semiconductor manufacturing a natural opportunity for commercialization of this work. Our efforts have led to two strong results. The first is that we evaluated the proposed ensembling techniques using previously proposed machine learning architectures for use in anomaly detection, namely AutoEncoder based models and their derivatives. We also developed new architectures which have not been evaluated in this context before. In fact, this work marks the first use of Vision Transformers for anomaly detection in HEP. Second, we demonstrated that ensemble learning significantly improves model performance in scenarios prone to degradation, validating its effectiveness across both HEP and semiconductor datasets. These results further support ensemble learning as a powerful strategy for mitigating catastrophic forgetting and maintaining robust performance in evolving data environments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Western Renewable Energy Zones, Phase 1: QRA Identification Technical Report

This report describes the Western Renewable Energy Zones (WREZ) Initiative Phase 1 Qualified Resource Area identification process, including the identification and economic analysis of Qualified Resource Areas (QRAs) and 'non-REZ' resources. These data and analyses will assist the Western US in its renewable energy transmission planning goals. The economic analysis in this report produced the input data for the WREZ Generation and Transmission model, which is a screening-level model to determine the optimal routing for and cost of delivering renewable energy from QRAs to load centers throughout the Western Interconnection. In June 2009, the Western Governors' Association accepted the Western Governors' Association WREZ Phase 1 Report in which the QRAs were mapped and the entire WREZ Phase 1 process was explained in general. That same month the Lawrence Berkeley National Laboratory released the WREZ Generation and Transmission Model (GTM), which was also developed by Black & Veatch. This report details the assumptions and methodologies that were used to produce the maps and resource analyses in the WGA report as well as the economic data used by the WREZ GTM. This report also provides the results of the non-REZ resource analysis for the first time in the WREZ initiative.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Ultra-high Q cavity-based search for the Dark Photon: new exclusion limit from Dark SRF phase 1 and step forward for phase 2

We present here the first results of Dark SRF, a light-shining-through-wall (LSW) experiment that leverages ultra-high quality factor superconducting radio frequency (SRF) cavities to search for dark photons. The use of Nb SRF cavities combined with a strict calibration and measurement protocol increased sensitivity to dark photons by several orders of magnitude compared to other LSW experiments, as demonstrated by our new limit that excluded a broad range of previously unstudied dark photon mass and mixing angle.In addition to the results of the search conducted in liquid helium using 1.3GHz SRF cavities, we also present the first steps of the second phase of the experiment, which will take place in a dilution refrigerator using 2.6GHz SRF cavities. These experiments are part of a wider effort of the Superconducting Quantum Materials and Systems (SQMS) Center to employ ultra-high Q SRF cavities to search for Beyond the SM particles and wavelike dark matter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Structure of the metastable cubic B{sub 1} phase of the La{sub 2}Mo{sub 2}O{sub 9} single crystal

The structure of the metastable B{sub 1} phase of the La{sub 2}Mo{sub 2}O{sub 9} single crystal is investigated using X-ray diffraction. It is established that the crystal structure of the compound under investigation is described by the cubic unit cell with the parameter a = 7.158(5) A, which makes it possible to index approximately 84% of the reflections measured for this single crystal. The structure of the metastable cubic B{sub 1} phase is characterized by a local lowering of the symmetry for the La and Mo atoms, which are displaced from their positions on the threefold axis, thus forming three sites around it with an occupancy of 0.333(2). The O(1) atom in the structure of the metastable cubic B{sub 1} phase remains in the 4a position on the threefold axis but occupies it by only 86%. The O(2) and O(3) atoms located in a general position occupy their own sites with occupancies of 0.77(2) and 0.35(2), respectively. The final R factor of the refinement of this structural model is 2.52%.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Reduced Complexity Model Intercomparison Project Phase 1: introduction and evaluation of global-mean temperature response

Reduced-complexity climate models (RCMs) are critical in the policy and decision making space, and are directly used within multiple Intergovernmental Panel on Climate Change (IPCC) reports to complement the results of more comprehensive Earth system models. To date, evaluation of RCMs has been limited to a few independent studies. Here we introduce a systematic evaluation of RCMs in the form of the Reduced Complexity Model Intercomparison Project (RCMIP). We expect RCMIP will extend over multiple phases, with Phase 1 being the first. In Phase 1, we focus on the RCMs' global-mean temperature responses, comparing them to observations, exploring the extent to which they emulate more complex models and considering how the relationship between temperature and cumulative emissions of CO2 varies across the RCMs. Our work uses experiments which mirror those found in the Coupled Model Intercomparison Project (CMIP), which focuses on complex Earth system and atmosphere–ocean general circulation models. Using both scenario-based and idealised experiments, we examine RCMs' global-mean temperature response under a range of forcings. We find that the RCMs can all reproduce the approximately 1°C of warming since pre-industrial times, with varying representations of natural variability, volcanic eruptions and aerosols. We also find that RCMs can emulate the global-mean temperature response of CMIP models to within a root-mean-square error of 0.2°C over a range of experiments. Furthermore, we find that, for the Representative Concentration Pathway (RCP) and Shared Socioeconomic Pathway (SSP)-based scenario pairs that share the same IPCC Fifth Assessment Report (AR5)-consistent stratospheric-adjusted radiative forcing, the RCMs indicate higher effective radiative forcings for the SSP-based scenarios and correspondingly higher temperatures when run with the same climate settings. In our idealised setup of RCMs with a climate sensitivity of 3°C, the difference for the ssp585–rcp85 pair by 2100 is around 0.23°C(±0.12°C) due to a difference in effective radiative forcings between the two scenarios. Phase 1 demonstrates the utility of RCMIP's open-source infrastructure, paving the way for further phases of RCMIP to build on the research presented here and deepen our understanding of RCMs.

54 ENVIRONMENTAL SCIENCES↗

Simultaneous Integrated Boost Volumetric Modulated Arc Therapy in the Postoperative Treatment of High-Risk to Intermediate-Risk Endometrial Cancer: Results of ADA II Phase 1-2 Trial

Purpose: A prospective phase 1-2 clinical trial aimed at determining the recommended postoperative dose of simultaneous integrated boost volumetric modulated arc therapy (SIB-VMAT) in a large series of patients with high-risk and intermediate-risk endometrial cancer (HIR-EC) is presented. The study also evaluated the association between rate and severity of toxicity and comorbidities and the clinical outcomes. Methods and Materials: Two SIB-VMAT dose levels were investigated for boost to the vaginal vault, whereas the pelvic lymph nodes were always treated with 45 Gy. The first cohort received a SIB-VMAT dose of 55 Gy in 25 consecutive 2.2-Gy fractions, and the subsequent cohort received higher doses (60 Gy in 2.4-Gy fractions). Results: Seventy consecutive HIR-EC patients, roughly half of whom were obese (47.1%) or overweight (37.1%), with Charlson Age-Comorbidity Index >2 (48.5%), were enrolled. Thirty-one patients (44.3%) were administered adjuvant chemotherapy before starting radiation therapy. All patients (n=35 per dose level) completed irradiation without any dose-limiting toxicity. Proctitis (any grade) was associated with radiation therapy dose (P=.001); not so enterocolitis. Grade ≥2 gastrointestinal (GI) and genitourinary (GU) toxicity were recorded in 17 (24.3%) and 14 patients (20.0%), respectively, and were not associated with radiation dose. As for late toxicity, none of patients experienced late grade ≥3 GI or grade ≥2 GU toxicity. The 3-year late grade ≥2 GI and GU toxicity–free survival were 92.8% and 100%, respectively, with no difference between the 2 dose levels. With a median follow-up period of 25 months (range, 4-60 months), relapse/progression of disease was observed in 10 of 70 patients (14.2%). The 3-year cumulative incidence of recurrence was 1.5% (95% confidence interval (CI): 0.2-10.7), whereas the 3-year disease-free survival was 81.3% (95% CI: 65.0-90.0). Conclusions: This clinical study showed the feasibility of this technique and its good profile in terms of acute and late toxicity at the recommended doses even in aged and frail patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SRNL Phase 1 Assessment of the WAC/DQO and Unit Operations for the WTP Waste Qualification Program

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification for the proposed WTP analytical methods or approaches. For the unit operations, the SRNL subject matter experts reviewed WTP concepts compared to what is used at SRS and provided thoughts on the outlined tasks with respect to waste qualification. Also documented in this report are recommendations and an outline on what would be required for the next phase to further mature the WTP waste qualification program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stereotactic Body Radiation Therapy for Spinal Metastases in the Postoperative Setting: A Secondary Analysis of Mature Phase 1-2 Trials

Purpose: To evaluate the outcomes in patients treated on prospective phase 1-2 protocols with postoperative stereotactic body radiation therapy (SBRT) and identify the associated prognostic variables. Methods and Materials: Sixty-six patients with 69 tumors were treated with SBRT on prospective phase 1-2 studies for spinal metastases between 2002 and 2010. All patients underwent SBRT after spine surgery, which included laminectomy, vertebrectomy, or a combination of these techniques. Renal cell carcinoma was the most common histology represented (n=35, 53%) followed by sarcomas (n=13, 20%). Thirty-one patients (47%) were treated with prior conventional radiation to the spine (median dose 30 Gy). Patients were followed up with spinal magnetic resonance imaging (MRI) studies to determine the treated tumor control (TC). Pain and other symptom data were collected prospectively to determine treatment response and toxicity. Results: The median follow-up time was 30 months (range, 1-145 months) for all patients and 75 months for living patients (range, 6-145 months). The actuarial 1-year rate of TC was 85%, adjacent vertebral body control was 85%, and overall survival (OS) was 74% (median 29 months). On multivariate competing-risks analysis, sarcoma histology (subhazard ratio [SHR] = 2.38, 95% confidence interval [CI] 1.05-5.6, P=.04) and larger preoperative tumor volumes (SHR=1.01, 95% CI 1.0-1.01, P=.006) were significantly associated with worse TC. Karnofsky performance status was the only significant predictor for OS on multivariate analysis. There were no differences in TC between patients treated with different surgical techniques or different preoperative or postoperative Bilsky grades. There were no grade 3 or higher neurologic toxicities. Conclusion: This study represents a large series of prospective data available on patients treated with SBRT in the postoperative setting. The combination of surgery with SBRT can offer patients with metastatic disease to the spine the chance of durable tumor control with minimal toxicity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗