Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Permitting process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Evolution of storage monitoring – update in response to commercial and regulatory drivers

Carbon Capture and Storage (CCS) is in transition from first-of-a kind projects and research-orientated pilots to commercially-motivated applications. Monitoring results from many newly developed and planned large scale commercial projects are limited; however, it is worthwhile to assess their evolution and consider new strategies as part of an effort to assess and document best practices. Commercial monitoring is targeted to activities that comply with regulatory drivers and de-risk investments. Commercial monitoring also supports accounting that storage has occurred and is tied to project financing. It deals with long time frames and large volumes injected into multiple wells and multiple projects in favorable areas. We see developing trends toward reproducible workflows that systematically reduce risks and clarify expectations for oversight and long-term surveillance. Monitoring techniques showing increasing trends include injection zone pressure as a history-matching and compliance tool. To reduce cost and environmental impact of time-lapse seismic data collection, deploying new approaches and tools, such as use of fibre and installed sources are increasingly applied. Concern over the risk of induced seismicity by regulatory bodies and the general public has increased, which has also resulted in increased monitoring. Some techniques used in the early research phases have been sidelined or used only in restricted applications. For example, geochemical analyses in the injection zone as well as the environment are now being deployed less than it was in research-oriented programs, except in the US where it is required by the permitting process. Expectations of frequent area-wide near surface monitoring have also decreased.

25 ENERGY STORAGE

Techno-economic assessment of distributed wellhead RO water treatment for nitrate removal and salinity reduction: A field study in small disadvantaged communities

Techno-economic analysis of distributed wellhead water treatment and desalination (DWTD) systems was carried out based on a three-year field study in three small, disadvantaged communities (DACs) to evaluate the reliability and affordability of upgrading their impaired well water. The local water supplies of the three study DACs, located in Salinas Valley, California, were contaminated with nitrate at levels (~ 12–87 mg/L NO$^{-}_{3}$ - N) ) above the California maximum contaminant level (MCL) of 10 mg/L NO$^{-}_{3}$ - N , and had elevated water salinity (~600–1,600 mg/L total dissolved solids(TDS)) above its secondary MCL (SMCL) of 500 mg/L TDS. Well water nitrate removal and salinity reduction were accomplished via reverse osmosis (RO) based DWTD systems that operated autonomously, supported by remote monitoring and supervisory cyberinfrastructure. Reliable DWTD operation provided treated water quality, with respect to nitrate and salinity, in the range of 0.5–6.3 mg/L NO$^{-}_{3}$ - N and 57–161 mg/L TDS, respectively, which were well below the respective MCL and SMCL. The levelized cost of water treatment was in the range of ~$$2/m 3 - $$2.9/m 3 which aligns with typical residential water costs in California and in the study region, and monthly residential water costs (39 dollars-74 dollars/residential unit/month) were also within the range in California. The study showcased the DWTD approach as a viable and potentially scalable solution for upgrading impaired local potable water supply of communities lacking centralized water delivery infrastructure. However, streamlined permitting processes and standardized regulatory frameworks are critical to promoting wider adoption and maximizing the socio-economic benefits of the DWT approach. Moreover, DACs are likely to require government subsidies in order to cover the CapEx of DWTD systems in addition to upgrade of site infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY

State's Perspective on Regulating CO 2 Storage and Permitting UIC Class VI Injection Wells

Conference presentation at 48th International Technical Conference on Clean Energy (Clearwater Clean Energy Conference), Clearwater, Florida, June 16–19, 2024. An overview of the Plains CO 2 Reduction (PCOR) Partnership Initiative, the regulatory framework for carbon capture, utilization, and storage (CCUS), and a timeline of the state and federal permitting process.

01 COAL, LIGNITE, AND PEAT

Uinta Basin CarbonSAFE II: Storage Complex Feasibility (Final Report)

The primary objective of this CarbonSAFE Phase II project was to establish the technical and commercial feasibility of a commercial-scale CO 2 geological storage complex for Deseret Power Electric Cooperative Bonanza Power Plant and other CO 2 sources in the northeast Uinta Basin, Utah, with the goal to securely store at least 50 million metric tons of captured CO 2 and accelerate CO 2 capture, utilization, and storage (CCUS) deployment. The project team established high-potential technical and commercial feasibility for a storage site within the east Uinta Basin (Utah), in the Cretaceous sandstones (Frontier, Dakota, and Buckhorn), Entrada Sandstone, Nugget Sandstone, and/or Weber Sandstone southwest of the Bonanza coal-fired power plant. This project collected and analyzed state-of-the-art data to characterize the storage complex consistent with Environmental Protection Agency (EPA) permitting standards. The team conducted extensive analog studies, outcrop mapping, and data sampling, which largely contributed to understanding the subsurface lithology and facies. Existing data were obtained and assessed from Utah Division of Oil, Gas, and Mining (DOGM), Utah Geological Survey (UGS), Colorado Geological Survey (CGS), U.S. Geological Survey (USGS), and EPA. These data were analyzed using state-of-the-art CCUS technologies for Societal Considerations, Site Characterization, Modeling and Simulations, Risk Assessment, Management and Monitoring, potential Underground Injection Control (UIC) Class VI Well Permitting, and Technical/Economic Feasibility. Through these high-resolution data collection and feasibility studies, this project was expected to provide a reference for initiating Underground Injection Control (UIC) and other commercial-scale geological storage permitting processes in the Western United States, ultimately contributing to the nation's decarbonization goals through low-risk, cost-effective commercial-scale carbon capture, utilization, and storage (CCUS) projects.

42 ENGINEERING

Energy Storage Siting and Permitting Outreach Workshop Report

On March 24th, 2026, under the sponsorship of the U.S. Department of Energy’s Office of Electricity, Pacific Northwest National Laboratory (PNNL) staff hosted the Energy Storage Siting & Permitting Outreach Workshop at PNNL’s Grid Storage Launchpad (GSL) facility in Richland, Washington. The workshop convened a cohort of state and regional stakeholders from across the country to build a shared understanding of energy storage technologies, regulatory frameworks, and best practices for engaging in the permitting process. Participants left with a deeper understanding of energy storage technologies, grid uses and benefits, interconnection and regulatory processes, battery safety standards and risk management, and local engagement strategies and approaches. The workshop concluded with a guided tour of the GSL for hands-on exposure to energy storage research and development. The workshop had 17 external participants. The attendees represented a range of backgrounds, including state and local governments, nonprofits or other local organizations, project developers, and utility stakeholders.

Battery Energy Storage

Exposing Process‐Level Biases in a Global Cloud Permitting Model With ARM Observations

The emergence of global convective‐permitting models (GCPMs) represents a significant advancement in climate modeling, offering improved representation of deep convection and complex precipitation patterns. In this study, we evaluate the performance of the Simple Cloud‐Resolving E3SM Atmosphere Model (SCREAM) using its doubly periodic configuration (DP‐SCREAM) against large eddy simulations and modern observational data sets from the Atmospheric Radiation Measurement program. We introduce several new transitional cloud regime cases, such as the transition from shallow to deep convection and from stratocumulus to cumulus, as well as cold‐air outbreak scenarios. The results reveal both strengths and limitations of SCREAM, particularly in the accurate simulation of cloud transitions and midlevel convection, with varying degrees of sensitivity to horizontal and vertical resolution. Despite improvements at higher resolutions, key biases remain, including the abrupt transition from shallow to deep convection and the lack of congestus clouds. These findings underscore the need for further refinement in turbulence parameterizations and vertical grid resolution in GCPMs.

Bogenschutz, Peter A. [Lawrence Livermore National

Workshop Summary Report on Using AI Tools to Improve the Efficiency and Outcomes of the NEPA Process: AI for Permitting Workshop at the 2025 National Association of Environmental Professionals (NAEP) Annual Conference

On April 29, 2025, the U.S. Department of Energy and Pacific Northwest National Laboratory hosted a workshop at the National Association of Environmental Professionals 2025 Conference and Training Symposium in Charleston, South Carolina, titled, “Effective and Responsible Use of Customized AI Tools to Improve the Efficiency and Outcomes of the NEPA Process.” The objectives of this workshop were to make environmental practitioners aware of the potential for using artificial intelligence in the National Environmental Policy Act process, demonstrate examples of how artificial intelligence can be integrated effectively to improve efficiency and outcomes and solicit questions and feedback from practitioners. This report summarizes the key points from all talks and case studies, as well as audience questions and feedback on the presentation topics and the broader topic of "AI in permitting". The report concludes by highlighting the key barriers and opportunities for the implementation of AI in permitting, as discussed during the workshop.

54 ENVIRONMENTAL SCIENCES

EV-ELM (Electric Vehicle Policies with the Energy Language Model) [SWR-25-156]

Electric Vehicle Policies with the Energy Language Model (EV-ELM) leverages previous work using Large Language Models (LLMs) to find, download, and parse policy information related to energy infrastructure. In this application, we use LLMs to find policy documents related to the permitting and installation of electric vehicle charging infrastructure. This software contains the code to find, download, and parse these documents, while a related data record in the Open Energy Data Initiative (OEDI) will include the resulting output dataset that can be used for downstream analysis. The EV-ELM repository contains code for the EV-ELM project, which focuses on retrieving and processing EV permitting processes using large language models. The project is composed of two pipelines: (1) a web scraping pipeline for discovering and downloading EV permitting documents, and (2) a document parsing and extraction pipeline that processes the downloaded files to produce structured data. The web scraping pipeline is designed to extract relevant information from various websites, while the document parsing pipeline processes and analyzes the extracted documents to derive meaningful insights. Both pipelines depend on the NLR elm repository, which provides essential tools and functionalities for handling and processing the data. The web scraping pipeline is a modified version of the ordinance_gpt example within the elm repository. It has been adapted to fit the specific requirements of the EV-ELM project, ensuring that it effectively captures and processes the necessary information related to EV permitting.

Olson, Reid [National Laboratory of the Rockies (N

SolarAPP+ Enhancements and Commercialization (Final Technical Report)

With millions of distributed photovoltaic (PV) systems expected to be installed over the next five years, the permitting and inspection processes of authorities having jurisdiction (AHJs) may become overburdened, causing delays and increased costs for installed systems (Cruce et al. 2022). The central goal of this project was to automate and streamline permitting processes for distributed PV systems and complementary technologies, such as battery storage. Deploying automated permitting has been hypothesized to reduce permit review times, resulting in reduced costs and improved customer experience. This has the potential to expand the PV and PV-plus-storage market nationwide. The National Renewable Energy Laboratory (NREL) and its project partners, including UL Solutions, the Interstate Renewable Energy Council (IREC), the International Code Council (ICC), and more, developed the Solar Automated Permit Processing (SolarAPP+™) software platform to reduce permit review times. NREL and its partners also collaborated with the solar industry, the building safety community, and local governments to develop SolarAPP+.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects

PNNL Review of Federal and State Agency Regulatory Streamlining Practices

All major federal actions that have the potential to significantly affect the environment (e.g., land purchases and/or issuing grants, permits, leases, or licenses) are subject to multiple statutes including the following: • an environmental analysis under the National Environmental Policy Act (NEPA) • potential consultations with the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) under the Endangered Species Act of 1973, as amended (ESA) • potential consultations with State Historical Preservation Officers (SHPOs) and/or tribal nations [often Tribal Historic Preservation Officers (THPOs)] under the National Historic Preservation Act of 1966 (NHPA). Given the size of the federal government and the corresponding variability and complexity in its missions, different branches within the federal government have a fairly wide range of approaches to fulfill their NEPA and consultation requitements. Many of these approaches are founded on the desire to streamline their NEPA and consultation processes while meeting the spirit and letter of the regulations. Some federal and state environmental/engineering agencies have developed web-based dashboards that provide a single web location for permit application submittals. They also use general permits in their various permitting processes. General permits can streamline the permitting process by establishing identical requirements for all eligible applicants. This reduces the time these agencies need to spend reviewing individual permits and setting specific requirements. In addition, general permits do not require a case-specific permit application. This paper presents a sampling of effective agency examples of streamlining the NEPA process and associated agency consultations. It also includes several examples of federal and state agency web portals, online application systems, and general permits that make application processes more efficient and accessible.

54 ENVIRONMENTAL SCIENCES

Balancing Participation and Speed: A Polycentric Governance Lens on Renewable‐Energy Siting

Siting and permitting for renewable projects vary in process and authority structures. Such variation can create coordination challenges and inconsistent public participation processes. We develop a Governance Trade-Off Matrix to classify permitting processes by (1) authority structure (polycentric vs. monocentric) and (2) procedural extensiveness (minimal vs. extensive). The matrix shows when jurisdictional dispersion enables timely implementation and when it creates coordination breakdowns. We propose testable hypotheses on how governance design affects project timelines, conflict escalation, and local acceptance. Here, the framework highlights design levers, like single lead agencies, structured public involvement, and statutory shot clocks, to reconcile meaningful local input with urgent climate imperatives.

14 SOLAR ENERGY

Enhancing Fluid Flow Pressure and Saturation Prediction Accuracy and Reducing Uncertainty with Committee Machine – Illinois Basin Decatur Project (IBDP) as a Case Study

Presentation at the 17th International Conference on Greenhouse Gas Control Technologies GHGT-17 held in Calgary, Canada, October 20-24, 2024. Carbon capture and storage (CCS) is a way to play a critical role in the global transition to a low-emission economy. Current progress is hampered by a number of factors, among which the lack of risk-informed design tools and decision support frameworks is seen as a major roadblock. Significant interest exists in using artificial intelligence to accelerate CCS site feasibility studies, as well as to facilitate the permit application process. Existing works commonly train a single deep learning model. This work investigates the feasibility of using a conventional ensemble learning (committee machine) technique to further improve prediction accuracy. Ensemble-based algorithms generally improve over individual base learners in terms of robustness and accuracy. Deep ensembles, however, are time-consuming to create and train. A pragmatic question is whether small-sized ensembles may lead to prediction improvement. Here we evaluated the efficacy of an ensemble learning technique using the latent spectral model (LSM), an efficient deep neural operator algorithm, as base learners. Preliminary results, obtained using the Illinois Basin-Decatur Project (IBDP) carbon sequestration data/model, show that small-sized ensembles can improve prediction over the base learners, achieving prediction accuracy of ~1.6 psi root mean square error (RMSE) on pressure (relative the average reservoir pressure of 3150 psi), and less than 1.3% for saturation.

Sun, Alexander

Enhancing Fluid Flow Pressure and Saturation Prediction Accuracy and Reducing Uncertainty with Committee Machine – Illinois Basin Decatur Project (IBDP) as a Case Study

This is the conference paper accompanying an oral presentation at the 17th International Conference on Greenhouse Gas Control Technologies GHGT-17 held in Calgary, Canada, October 20-24, 2024. Carbon capture and storage (CCS) is a way to play a critical role in the global transition to a low-emission economy. Current progress is hampered by a number of factors, among which the lack of risk-informed design tools and decision support frameworks is seen as a major roadblock. Significant interest exists in using artificial intelligence to accelerate CCS site feasibility studies, as well as to facilitate the permit application process. Existing works commonly train a single deep learning model. This work investigates the feasibility of using a conventional ensemble learning (committee machine) technique to further improve prediction accuracy. Ensemble-based algorithms generally improve over individual base learners in terms of robustness and accuracy. Deep ensembles, however, are time-consuming to create and train. A pragmatic question is whether small-sized ensembles may lead to prediction improvement. Here we evaluated the efficacy of an ensemble learning technique using the latent spectral model (LSM), an efficient deep neural operator algorithm, as base learners. Preliminary results, obtained using the Illinois Basin-Decatur Project (IBDP) carbon sequestration data/model, show that small-sized ensembles can improve prediction over the base learners, achieving prediction accuracy of ~1.6 psi root mean square error (RMSE) on pressure (relative the average reservoir pressure of 3150 psi), and less than 1.3% for saturation.

Sun, Alexander

On the relationship between precipitation extreme and local temperature over eastern China based on convection permitting simulations: roles of different moisture processes and precipitation types

The Clausius–Clapeyron (CC) scaling, which indicates a roughly 7% increase in saturated water vapor per 1 °C increase in temperature, can serve as a strong constraint linking the intensity of precipitation extremes and local temperature. However, the relationship between precipitation extreme and local temperature (referred to as the PE-T relationship) does not always follow the CC scaling and is highly dependent on climate regimes. In this study, we investigated the impacts of different moisture processes and precipitation types on the PE-T relationship over eastern China during the summertime based on convection-permitting model simulations. Consistent with observations, the simulated intensity of precipitation extremes increases with temperature at a rate close to CC (double-CC) scaling below (above) 20 °C. When the temperature exceeds 25 °C, precipitation intensity starts to drop. Precipitation extremes are mainly contributed by the stratiform, MCS (i.e., mesoscale convective system) convective, and non-MCS convective precipitation at low (< 20 °C), medium (20–25 °C), and high (> 25 °C) temperatures, respectively, suggesting that the double-CC scaling occurs when convective types become dominant, while the negative scaling at high temperatures is attributed to the reduced horizontal scale of convection. Corresponding to the reduced intensity of precipitation at high temperatures, there are stronger divergence and subsidence in the low-level atmosphere, which is probably caused by the net cooling associated with the enhanced melting and evaporation of falling hydrometeors due to the lower relative humidity in the low-level atmosphere. Overall, our findings contribute to a deeper understanding of the temperature dependence of precipitation extremes in eastern China.

54 ENVIRONMENTAL SCIENCES

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY