Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Performance measurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

APMS 3.0 Flight Analyst Guide: Aviation Performance Measuring System

The Aviation Performance Measuring System (APMS) is a method-embodied in software-that uses mathematical algorithms and related procedures to analyze digital flight data extracted from aircraft flight data recorders. APMS consists of an integrated set of tools used to perform two primary functions: a) Flight Data Importation b) Flight Data Analysis.

Jay, Griff↗

A performance measure for manual control systems

A new performance measure is introduced for multivariable closed loop experiments with a human operator. The essential feature of the phase margin performance measure (PMPM) is that the performance of each control loop can be determined independently, with prescribed disturbance and error levels. A variable filter parameter is used as the PMPM within the loop and it assures a high workload at the same time. There is a straightforward relationship between the PMPM and the inner loop feedback augmentation that can be utilized in trade-off studies. An adjustment scheme that seeks the PMPM automatically is described as employed in a single loop control task. This task applies directly to the experimental study of displays for helicopters and VTOL aircraft.

Dukes, T. A.↗

Using Technical Performance Measures

All programs have requirements. For these requirements to be met, there must be a means of measurement. A Technical Performance Measure (TPM) is defined to produce a measured quantity that can be compared to the requirement. In practice, the TPM is often expressed as a maximum or minimum and a goal. Example TPMs for a rocket program are: vacuum or sea level specific impulse (lsp), weight, reliability (often expressed as a failure rate), schedule, operability (turn-around time), design and development cost, production cost, and operating cost. Program status is evaluated by comparing the TPMs against specified values of the requirements. During the program many design decisions are made and most of them affect some or all of the TPMs. Often, the same design decision changes some TPMs favorably while affecting other TPMs unfavorably. The problem then becomes how to compare the effects of a design decision on different TPMs. How much failure rate is one second of specific impulse worth? How many days of schedule is one pound of weight worth? In other words, how to compare dissimilar quantities in order to trade and manage the TPMs to meet all requirements. One method that has been used successfully and has a mathematical basis is Utility Analysis. Utility Analysis enables quantitative comparison among dissimilar attributes. It uses a mathematical model that maps decision maker preferences over the tradeable range of each attribute. It is capable of modeling both independent and dependent attributes. Utility Analysis is well supported in the literature on Decision Theory. It has been used at Pratt & Whitney Rocketdyne for internal programs and for contracted work such as the J-2X rocket engine program. This paper describes the construction of TPMs and describes Utility Analysis. It then discusses the use of TPMs in design trades and to manage margin during a program using Utility Analysis.

Garrett, Christopher J.↗

Spaceport Performance Measures

Spaceports have traditionally been characterized by performance measures associated with their site characteristics. Measures such as "Latitude" (proximity to the equator), "Azimuth" (range of available launch azimuths) and "Weather" (days of favorable weather) are commonly used to characterize a particular spaceport. However, other spaceport performance measures may now be of greater value. These measures can provide insight into areas of operational differences between competing spaceports and identify areas for improving the performance of spaceports. This paper suggests Figures of Merit (FOMs) for spaceport "Capacity" (number of potential launch opportunities per year and / or potential mass' to low earth orbit (LEO) per year); "Throughput" (actual mass to orbit per year compared to capacity); "Productivity" (labor effort hours per unit mass to orbit); "Energy Efficiency" (joules expended at spaceport per unit mass to orbit); "Carbon Footprint" tons CO2 per unit mass to orbit). Additional FOMS are investigated with regards to those areas of special interest to commercial launch operators, such as "Assignment Schedule" (days required for a binding assignment of a launch site from the spaceport); "Approval Schedule" (days to complete a range safety assessment leading to an approval or disapproval of a launch vehicle); "Affordability" (cost for a spaceport to assess a new launch vehicle); "Launch Affordability" (fixed range costs per launch); "Reconfigure Time" (hours to reconfigure the range from one vehicle's launch ready configuration to another vehicle's configuration); "Turn,Around Time" (minimum range hours required between launches of an identical type launch vehicle). Available or notional data is analyzed for the KSC/CCAFS area and other spaceports. Observations regarding progress over the past few decades are made. Areas where improvement are needed or indicated are suggested.

Finger, G. Wayne↗

Human performance measuring device

Complex coordinator, consisting of operator control console, recorder, subject display panel, and limb controls, measures human performance by testing perceptual and motor skills. Device measures psychophysiological functions in drug and environmental studies, and is applicable to early detection of psychophysiological body changes.

Michael, J.↗

A performance measurement system for engineering services

A performance measurement system which provides both a means of monitoring performance and a resource to support management decision making is described. The process of performance indicator development is discussed and typical indicators are described. The paper concludes with a summary of some of the lessons learned in applying productivity measurements to engineering services tasks and in automating data collection, evaluation and interpretation.

West, R. L.↗

Scalable and Actionable Performance Measures for Traffic Signal Systems using Probe Vehicle Trajectory Data

Scalable and actionable performance measures for traffic signal systems provide opportunities for practitioners to measure and improve the transportation network. Historically, traffic signal improvements have relied on scheduled signal retiming based on limited data collection, or on the public to call and alert engineers of an issue. This inefficient method of improving signal timing led to the creation of automated traffic signal performance measures (ATSPMs). These metrics rely on expensive infrastructure, including detection and communications, which has produced barriers for numerous agencies to fully adopt. Recently, third-party data providers have begun to release vehicle trajectory data, which allows for enhanced signal metrics with no investment in physical equipment. The purpose of this study is to demonstrate the use of these data and summarize the scalability of the created metrics. This work builds on previous efforts to quantify signal performance on nine intersections in Michigan, U.S. Ten signalized corridors in Columbus, Ohio, were chosen to scale a performance assessment using crowdsourced trajectory data. A total of 136 intersections were assessed in 2-h intervals using data from all weekdays in 2017. High-level corridor summary metrics including average percent of vehicles stopping (18%–32%), average delay (9.4–20.5 s), and level of travel time reliability (1.23–2.73) were calculated for each corridor direction. Intersection-level metrics were also introduced, which can be used by practitioners to identify problems, improve signal timings, and prioritize future infrastructure investments.

99 GENERAL AND MISCELLANEOUS↗

Opcode counting for performance measurement

Methods, systems and computer program products are disclosed for measuring a performance of a program running on a processing unit of a processing system. In one embodiment, the method comprises informing a logic unit of each instruction in the program that is executed by the processing unit, assigning a weight to each instruction, assigning the instructions to a plurality of groups, and analyzing the plurality of groups to measure one or more metrics. In one embodiment, each instruction includes an operating code portion, and the assigning includes assigning the instructions to the groups based on the operating code portions of the instructions. In an embodiment, each type of instruction is assigned to a respective one of the plurality of groups. These groups may be combined into a plurality of sets of the groups.

97 MATHEMATICS AND COMPUTING↗

Opcode counting for performance measurement

Methods, systems and computer program products are disclosed for measuring a performance of a program running on a processing unit of a processing system. In one embodiment, the method comprises informing a logic unit of each instruction in the program that is executed by the processing unit, assigning a weight to each instruction, assigning the instructions to a plurality of groups, and analyzing the plurality of groups to measure one or more metrics. In one embodiment, each instruction includes an operating code portion, and the assigning includes assigning the instructions to the groups based on the operating code portions of the instructions. In an embodiment, each type of instruction is assigned to a respective one of the plurality of groups. These groups may be combined into a plurality of sets of the groups.

97 MATHEMATICS AND COMPUTING↗

Opcode counting for performance measurement

Methods, systems and computer program products are disclosed for measuring a performance of a program running on a processing unit of a processing system. In one embodiment, the method comprises informing a logic unit of each instruction in the program that is executed by the processing unit, assigning a weight to each instruction, assigning the instructions to a plurality of groups, and analyzing the plurality of groups to measure one or more metrics. In one embodiment, each instruction includes an operating code portion, and the assigning includes assigning the instructions to the groups based on the operating code portions of the instructions. In an embodiment, each type of instruction is assigned to a respective one of the plurality of groups. These groups may be combined into a plurality of sets of the groups.

97 MATHEMATICS AND COMPUTING↗

Opcode counting for performance measurement

Methods, systems and computer program products are disclosed for measuring a performance of a program running on a processing unit of a processing system. In one embodiment, the method comprises informing a logic unit of each instruction in the program that is executed by the processing unit, assigning a weight to each instruction, assigning the instructions to a plurality of groups, and analyzing the plurality of groups to measure one or more metrics. In one embodiment, each instruction includes an operating code portion, and the assigning includes assigning the instructions to the groups based on the operating code portions of the instructions. In an embodiment, each type of instruction is assigned to a respective one of the plurality of groups. These groups may be combined into a plurality of sets of the groups.

97 MATHEMATICS AND COMPUTING↗

Opcode counting for performance measurement

Methods, systems and computer program products are disclosed for measuring a performance of a program running on a processing unit of a processing system. In one embodiment, the method comprises informing a logic unit of each instruction in the program that is executed by the processing unit, assigning a weight to each instruction, assigning the instructions to a plurality of groups, and analyzing the plurality of groups to measure one or more metrics. In one embodiment, each instruction includes an operating code portion, and the assigning includes assigning the instructions to the groups based on the operating code portions of the instructions. In an embodiment, each type of instruction is assigned to a respective one of the plurality of groups. These groups may be combined into a plurality of sets of the groups.

97 MATHEMATICS AND COMPUTING↗

Gallium Electromagnetic (GEM) Thruster Performance Measurements

Discharge current, terminal voltage, and mass bit measurements are performed on a coaxial gallium electromagnetic thruster at discharge currents in the range of 7-23 kA. It is found that the mass bit varies quadratically with the discharge current which yields a constant exhaust velocity of 20 km/s. Increasing the electrode radius ratio of the thruster from to 2.6 to 3.4 increases the thruster efficiency from 21% to 30%. When operating with a central gallium anode, macroparticles are ejected at all energy levels tested. A central gallium cathode ejects macroparticles when the current density exceeds 3.7 10(exp 8) A/square m . A spatially and temporally broad spectroscopic survey in the 220-520 nm range is used to determine which species are present in the plasma. The spectra show that neutral, singly, and doubly ionized gallium species are present in the discharge, as well as annular electrode species at higher energy levels. Axial Langmuir triple probe measurements yield electron temperatures in the range of 0.8-3.8 eV and electron densities in the range of 8 x 10(exp )20 to 1.6 x 10(exp 21) m(exp -3) . Triple probe measurements suggest an exhaust plume with a divergence angle of 9 , and a completely doubly ionized plasma at the ablating thruster cathode.

Thomas, Robert E.↗

The large scale polarization explorer (LSPE) for CMB measurements: performance forecast

The measurement of the polarization of the Cosmic Microwave Background (CMB) radiation is one of the current frontiers in cosmology. In particular, the detection of the divergence-free component of the polarization field, the B-mode component, reveals the presence of gravitational waves in the early Universe. The detection of such component is at the moment the most promising technique to probe the inflationary theory describing the very early evolution of the Universe. The measurement of the polarization of the Cosmic Microwave Background (CMB) radiation is one of the current frontiers in cosmology. In particular, the detection of the primordial divergence-free component of the polarization field, the B-mode, could reveal the presence of gravitational waves in the early Universe. The detection of such a component is at the moment the most promising technique to probe the inflationary theory describing the very early evolution of the Universe. We present the updated performance forecast of the Large Scale Polarization Explorer (LSPE), a program dedicated to the measurement of the CMB polarization. LSPE is composed of two instruments: LSPE-Strip, a radiometer-based telescope on the ground in Tenerife-Teide observatory, and LSPE-SWIPE (Short-Wavelength Instrument for the Polarization Explorer) a bolometer-based instrument designed to fly on a winter arctic stratospheric long-duration balloon. The program is among the few dedicated to observation of the Northern Hemisphere, while most of the international effort is focused into ground-based observation in the Southern Hemisphere. Measurements are currently scheduled in Winter 2022/23 for LSPE-SWIPE, with a flight duration up to 15 days, and in Summer 2022 with two years observations for LSPE-Strip. In this work, we describe the main features of the two instruments, identifying the most critical aspects of the design, in terms of impact on the performance forecast. We estimate the expected sensitivity of each instrument and propagate their combined observing power to the sensitivity to cosmological parameters, including the effect of scanning strategy, component separation, residual foregrounds and partial sky coverage. We also set requirements on the control of the most critical systematic effects and describe techniques to mitigate their impact. LSPE will reach a sensitivity in tensor-to-scalar ratio of σr < 0.01, set an upper limit r < 0.015 at 95% confidence level, and improve constraints on other cosmological parameters.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrating Human Performance Measures into Space Operations: Beyond Our Scheduling Capabilities?

Current planning and scheduling software tools for International Space Station (ISS) support different flight controller teams as they plan daily space operations. Planning and scheduling tools capabilities include integrating digitized ISS state inputs, evaluating their expected future states, and propagating them over time. Extensive, custom-made computational models of operations, of objectives, and of operational constraints help ISS flight controllers identify where scheduled events violate constraints. Based on the current capabilities of these tools, this paper proposes how human performance measures could be better integrated into planning and scheduling tools for space mission operations. Future integration of human performance measures could be applied to state inputs (in this case, the astronaut’s state) and to modeling human performance operational constraints & operational objectives (i.e., assigned activities) with parameters that are relevant to human performance measures. Gaps between the state-of-the-art for human performance modeling and planning tools for future exploration missions are identified.

space operations↗

Exploratory study on performance measures as indicators of IS effectiveness

The Information Systems Directorate at JSC/NASA has undertaken the reevaluation of its performance measures process and measures. Under the direction of a quality approach it is essential to identify an external perspective of how well an organization is performing. This study was conducted with two major objectives: (1) survey and summarize the academic literature on performance measures as indicators of information systems (IS) effectiveness; and (2) survey organizations for their experience in measuring for IS effectiveness. Four approaches to measuring the effectiveness of IS performance were identified: (1) listen to the customer for the things they need; (2) align with corporate goals; (3) benchmark against well-respected organizations; and (4) ask yourself what critical factors lead to success. The list of known methods for soliciting customer feedback are as follows: (1) executive visit; (2) survey, interview, and focus group; (3) complaints and compliments; and (4) service level agreements. A common set of characteristics that satisfy customers was identified from the literature. The list includes elements such as the following: accuracy, timeliness, relevance, understandability, reliability, and completeness. Future research in this topic area should prove beneficial to determine the metrics for external validity.

Bishop, Peter C.↗

Score-P: A Joint Performance Measurement Run-Time Infrastructure for Periscope, Scalasca, TAU, and Vampir.

This paper gives an overview about the Score-P performance measurement infrastructure which is being jointly developed by leading HPC performance tools groups. It motivates the advantages of the joint undertaking from both the developer and the user perspectives, and presents the design and components of the newly developed Score-P performance measurement infrastructure. Furthermore, it contains first evaluation results in comparison with existing performance tools and presents an outlook to the long-term cooperative development of the new system.

Application Execution↗