Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Performance Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

RANGERS: Modeling Report on Integrity and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

The Engineered Barrier System (EBS) plays an important role in ensuring the long-term safety and containment of high-level waste (HLW) and spent nuclear fuel (SNF) in deep geological repositories in salt formation. As part of a multi-barrier system, the EBS works alongside the natural barrier, which is the salt formation itself and the technical barrier comprising the disposal casks. The primary function of the EBS is to maintain containment during a defined period until the backfill used in the repository made of crushed salt, develops its sealing capacity through compaction. Over the time, the backfill eventually compacts to a state of low porosity and permeability, acting as a long-term seal. However, until this process is complete, the EBS must retain its structural and functional integrity. Regulatory guidelines in Germany currently require the EBS to remain effective for up to next ice age, that is expected in 50,000 years. The significant hydro-geological and topographic changes expected during an ice age could make it impossible to accurately predict the hydro-chemical conditions within the repository system at that time. In response to these challenges, BGE TECHNOLOGY GmbH (BGE TEC) and Sandia National Laboratories (SNL) have jointly developed a comprehensive methodology for the design and safety assessment of engineered barrier systems within the scope of the RANGERS project. This methodology is tailored for repositories in salt formations. The developed methodology provides a structured approach for designing and assessing the performance of the EBS in salt-based repositories. It begins with defining a sealing concept based on the geological characteristics of the selected site and the overall repository design. The entire repository system, comprising the geological site, repository infrastructure, and EBS, is then subjected to a Features, Events, and Processes (FEP) analysis, focusing solely on those FEPs that affect the EBS. The derived FEPs help identify the loads and stresses acting on the EBS, which serve as the foundation for conducting an integrity assessment. This analysis helps predict the EBS’s evolution and performance over the regulatory time frame, feeding into integrated performance assessment simulations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative Performance Assessment of Proxy Apps and Parents (Report for ECP Proxy App Project Milestone ADCD-504-11)

The ECP Proxy Application Project has an annual milestone to assess the state of ECP proxy applications. Our FY21 milestone (ADCD-504-11) proposed to: "Assess the performance and fidelity of proxy applications, including those in the ECP Proxy App Suite, relative to the ECP Application workload on heterogeneous platforms. Use proxy applications and selected ECP applications to assess the utility of critical elements of the Exascale toolchain, especially tools used to collect performance data. Identify gaps in coverage and/or common situations in which proxies may fail to adequately represent ECP applications." To satisfy this milestone, the following specific tasks were completed: Study ability of MACSio to represent I/O workloads of adaptive mesh codes; Prepare report on assessed performance and debugging tools; Perform cosine similarity study on Intel and P9 and submit paper; Complete LDMS/GPU subcontract, complete and receive report; Complete validation of LDMS data collection for GPUs and submit paper; and Perform cosine similarity study on GPUs.

97 MATHEMATICS AND COMPUTING↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data-Based Performance Assessments for the DOE Hydropower Advancement Project

The U. S. Department of Energy s Hydropower Advancement Project (HAP) was initiated to characterize and trend hydropower asset conditions across the U.S.A. s existing hydropower fleet and to identify and evaluate the upgrading opportunities. Although HAP includes both detailed performance assessments and condition assessments of existing hydropower plants, this paper focuses on the performance assessments. Plant performance assessments provide a set of statistics and indices that characterize the historical extent to which each plant has converted the potential energy at a site into electrical energy for the power system. The performance metrics enable benchmarking and trending of performance across many projects in a variety contexts (e.g., river systems, power systems, and water availability). During FY2011 and FY2012, assessments will be performed on ten plants, with an additional fifty plants scheduled for FY2013. This paper focuses on the performance assessments completed to date, details the performance assessment process, and describes results from the performance assessments.

March, Patrick↗

Consideration of liners and covers in performance assessments

On-site disposal cells are in use and being considered at several United States Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the U.S. Environmental Protection Agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management due to the radioactive waste. The USDOE-Environmental Management Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these CERCLA disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to CERCLA risk assessments and DOE Order 435.1 performance assessments in support of a Record of Decision and Disposal Authorization Statement, respectively. One of the issues considered by the working group, which is addressed in this report, was how to appropriately consider the performance of covers and liners/leachate collections systems in the context of a DOE Order 435.1 performance assessment (PA). This same information may be appropriate for consideration within CERCLA risk assessments for these facilities. These OSDCs are generally developed to meet hazardous waste (HW) disposal design standards under the Resource Conservation and Recovery Act (RCRA) as well as the DOE Order 435.1 performance based standards for disposal of radioactive waste. To meet the standards for HW, the facilities typically include engineered covers and liner/leachate collection systems. Thus, when considering such facilities in the context of a DOE Order 435.1 PA, there is a need to address the evolution of performance of covers and liner/leachate collection systems in the context of meeting a performance standard considering time frames of 1,000 years for compliance and potentially thousands of years based on the wastes to test the robustness of the system. Experience has shown that there are a range of expectations and perspectives from the different regulators involved at different sites when reviewing assumptions related to cover and liner/leachate collection system performance. However for HW disposal alone under RCRA the design standards are typically considered sufficient by the regulators without a requirement to assess long-term performance thus avoiding the need to consider the details addressed in this report. This report provides suggestions for a general approach to address covers and liners/leachate collection systems in a DOE Order 435.1 PA and how to integrate assessments with defense-in-depth considerations such as design, operations, and waste acceptance criteria to address uncertainties. The emphasis is on water balances and management in such assessments. Specific information and references are provided for details needed to address the evolution of individual components of cover and liner/leachate collection systems. This information was then synthesized into suggestions for best practices for cover and liner system design and examples of approaches to address the performance of covers and liners as part of a performance assessment of the disposal system. Numerous references are provided for sources of information to help describe the basis for performance of individual components of cover and liner systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary performance assessment for the Waste Management Area C at the Hanford site in southeast Washington - 15331

A performance assessment of Single-Shell Tank Waste Management Area C located at the U.S. Department of Energy's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order, as well as other Federal requirements and State-approved closure plans and permits. The Waste Management Area C performance assessment assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the performance assessment focused on radiological impacts is being developed to meet the requirements for a closure authorization under U.S. Department of Energy Order 435.1 that include a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the performance assessment will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in Waste Management Area C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under the Resource Conservation and Recovery Act of 1976. Preliminary results of the performance assessment are evaluating the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment due to degradation of the engineered barriers. Per DOE Order 435.1, results of the preliminary analyses are being compared to the performance objectives during the 1,000-year post-closure period of compliance. Per the Order, performance assessment results are also being compared to the performance measures related to acute and chronic inadvertent intruder analyses and groundwater protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Conditioned System-Level Groundwater Model to Evaluate Long-Term Groundwater Impacts within a Performance Assessment - 20115

A preliminary performance assessment (PA) of single-shell tank Waste Management Area (WMA) A-AX located at the U.S. Department of Energy (DOE)'s Hanford Site in southeastern Washington is being conducted to satisfy the requirements of DOE Order 435.1 [1] as it relates to closure of the single-shell radioactive waste tanks in the WMA A-AX tank farms. A PA assesses the fate, transport, and impacts of radionuclides within a low-level radioactive waste disposal facility in its assumed closure configuration and the subsequent potential doses to humans over a 1,000-year compliance period and a 10,000-year performance evaluation period. The WMA A-AX preliminary PA evaluation is structured around the complementary use of process-level and system-level models to calculate the facility performance against established DOE Order 435.1 [1] performance objectives. Process-level models are those that represent a detailed phenomenological representation of processes of concern in the PA. Process models typically only represent one or a few of the components of the PA, such as groundwater flow and transport, and must be integrated with other modeling elements to perform PA calculations. System-level models are those that are abstracted from the process models, retaining the essential features of the process model, while allowing integration of all aspects of the PA in a single modeling framework. System-level models are often characterized by coarser numerical discretization, lower dimensionality, or other similar simplifications compared to the process-level model. Traditionally, a three-dimensional (3-D) process-level model is utilized primarily to evaluate the long-term impact on groundwater and the potential doses to individuals who consume contaminated groundwater. System-level models are also utilized to evaluate the groundwater pathway in PAs. These models typically have reduced dimensionality (1-D) and are conditioned utilizing flow fields (Darcy fluxes) and moisture content distributions that are abstracted from the process level models. The abstraction approach assures that the flow field in both models is consistent for a specific set of input parameters for flow, differing only in the discretization and dimensionality of the two models. The preliminary WMA A-AX PA incorporates a detailed representation of the geological system and hydraulic properties within the 3-D model STOMP{sup C} numerical code so that the effects of relevant features and processes on water flow and radionuclide transport in the subsurface can be evaluated. The complementary system-level model is developed utilizing the GoldSim{sup C} code to implement a simplified, 1-D equivalent model to represent the groundwater pathway. Contaminant transport through the vadose zone and unconfined aquifer for Tc-99 and I-129 were evaluated in each of the models. Adjustments to the saturated portion of the GoldSim{sup C} 1-D model were required to mimic the dispersion effect captured with the 3-D STOMP{sup C} model. Once this conditioning was conducted, highly similar results for the transport of Tc-99 and I-129 were achieved at the point of calculation, located 100 m downgradient from the WMA A-AX fenceline. These radionuclides represent elements that are regarded as primary dose drivers in the PA groundwater pathway analysis. The high degree of conformance between the two models suggests that the use of the equivalent 1-D system model is suitable for evaluating the full suite of radionuclides that will be released from the tank sources within WMA A-AX over the 1,000-year compliance period and over the 10,000-year evaluation period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decision-Based Iterative Modeling Framework for Probabilistic Performance Assessments - 18441

Radiological probabilistic performance assessments (PPAs) employ highly complex computer models to simulate the release of radionuclides from wastes in an engineered disposal facility, migration of these radionuclides over time, and resulting radiological dose to potentially exposed individuals. An iterative approach to PPA modeling is described to help define the appropriate complexity of the computer model. An initial model is developed that addresses all relevant processes and media, but that employs preliminary statistical parameter distributions to minimize the initial effort expended. Where appropriate, transport and exposure submodels with simplifying assumptions are also used in the initial model. Different assumptions and boundaries may be explored with the initial model to assess their importance in constraining model results. Exploration of the results of the initial model are used to determine the benefits of model refinements, and to guide such refinements to focus on specific areas of the model that most influence the model outputs of interest. This approach promotes efficiency and model parsimony, but does not compromise defensibility when performed in a transparent manner. Key model boundaries for a PPA include the time frame of the modeling (temporal boundaries), where future human receptors may be located (spatial boundaries), and what types of land uses and activities may exist in the future (exposure scenarios). Simplified transport and exposure models can be useful in helping decision makers and stakeholders establish such boundaries by analyzing the consequences of selecting different bounds and understanding which assumptions and boundaries have the greatest influence on the magnitude and distribution of model results. Pathway analysis and parameter sensitivity analysis performed on PPA model results are key components of the iterative modeling approach. The objective of pathway analysis is to identify the critical radionuclides and pathways contributing to radiation dose during the modeling performance period. An environmental 'pathway' is described by the connections from a waste package or cell in the disposal facility to a future human exposure event. These connections are commonly visualized using graphical means. A simple example of a potentially complete pathway for radon-222 is: radium-containing waste → radon emanation → upwards diffusion in cap material → diffusion/advection into a future building → inhalation exposure to a building occupant Parameter sensitivity analysis is conducted on the results of a PPA to identify those specific model input parameters whose distribution of values contributes the most to the distribution of target model output, such as annual radiation dose. Pathway and sensitivity analyses on initial modeling results provide information for guiding subsequent model development, and possibly interim decisions, by informing questions tied to the modeling objectives and performance criteria. For example, questions related to radiological doses from existing disposals may include: 1. Is radiation dose from radiological exposures either obviously negligible or obviously unacceptable based on initial modeling results? 2. If dose is not obviously negligible or unacceptable relative to applicable performance criteria, what model refinements would reduce uncertainty in the results to better inform decisions? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WHAT'S INSIDE THE BLACK BOX - EXPLAINING PERFORMANCE ASSESSMENT TO STAKEHOLDERS

The performance assessment (PA) process is being applied to support an increasing variety of waste management decisions that involve the whole spectrum of stakeholders. As with many technical tools, the PA process can be seen as a black box, which can be difficult to understand when implemented. Recognizing the increasing use of PA and the concerns about difficulties with understanding, the Savannah River Site Citizens Advisory Board (CAB) made a recommendation that the U.S. Department of Energy (DOE) provide a Public Educational Forum on PAs. The DOE-Headquarters Environmental Management (DOE-EM) Office of Compliance and the DOE-Savannah River (DOE-SR) responded to this recommendation by supporting the Savannah River National Laboratory (SRNL) in developing several presentation modules that can be used to describe different aspects of the PA process. For the Public Educational Forum, the PA modules were combined with presentations on DOE perspectives, historical modeling efforts at the Savannah River Site, and review perspectives from the U.S. Nuclear Regulatory Commission (NRC). The overall goals are to help the public understand how PAs are implemented and the rigor that is applied, and to provide insight into the use of PAs for waste management decision-making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evolution Of USDOE Performance Assessments Over 20 Years

Performance assessments (PAs) have been used for many years for the analysis of post-closure hazards associated with a radioactive waste disposal facility and to provide a reasonable expectation of the ability of the site and facility design to meet objectives for the protection of members of the public and the environment. The use of PA to support decision-making for LLW disposal facilities has been mandated in United States Department of Energy (USDOE) directives governing radioactive waste management since 1988 (currently DOE Order 435.1, Radioactive Waste Management). Prior to that time, PAs were also used in a less formal role. Over the past 20+ years, the USDOE approach to conduct, review and apply PAs has evolved into an efficient, rigorous and mature process that includes specific requirements for continuous improvement and independent reviews. The PA process has evolved through refinement of a graded and iterative approach designed to help focus efforts on those aspects of the problem expected to have the greatest influence on the decision being made. Many of the evolutionary changes to the PA process are linked to the refinement of the PA maintenance concept that has proven to be an important element of USDOE PA requirements in the context of supporting decision-making for safe disposal of LLW. The PA maintenance concept represents the evolution of the graded and iterative philosophy and has helped to drive the evolution of PAs from a deterministic compliance calculation into a systematic approach that helps to focus on critical aspects of the disposal system in a manner designed to provide a more informed basis for decision-making throughout the life of a disposal facility (e.g., monitoring, research and testing, waste acceptance criteria, design improvements, data collection, model refinements). A significant evolution in PA modeling has been associated with improved use of uncertainty and sensitivity analysis techniques to support efficient implementation of the graded and iterative approach. Rather than attempt to exactly predict the migration of radionuclides in a disposal unit, the best PAs have evolved into tools that provide a range of results to guide decision-makers in planning the most efficient, cost effective, and safe disposal of radionuclides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan.The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for federal fiscal year (FY) 2016. This annual summary report presents results and conclusions of the FY 2016 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2016 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2016, Evaluation of new or revised waste streams by special analysis, and Development and acceptance of version 4.200 of the Area 5 RWMS GoldSim PA/CA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2016 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2016 PA results, generated with the Area 5 RWMS v4.200 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. All results remain less than 50% of their performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2016. A new Corrective Action Unit (CAU), CAU 576, with corrective action sites near the Area 3 RWMS and Area 5 RWMS was identified in FY 2016. The sites are currently under investigation and not expected to be important sources for the CA. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs’ results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (CAU 97) source, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) source in the Area 5 RWMS CA is planned pending the completion of the CAU 98 Closure Report in FY 2017. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMSs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through. FY 2013 • Evaluation of new or revised waste streams by special analysis. • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2011 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2007a) requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs), with the results submitted annually to U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 1999a; 2000).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2011 Performance Assessment Community of Practice Technical Exchange – Summary

The Performance Assessment Community of Practice (PA CoP) was developed in 2008 to improve consistency and quality in the preparation of performance assessments (PAs) and risk assessments across the Department of Energy (DOE) Complex. The term, PA, is used to represent all of these modeling applications in this report. The PA CoP goals are to foster the exchange of information among PA practitioners and to share lessons learned from PAs conducted for DOE, commercial disposal facilities, and international entities. Technical exchanges and workshops are a cornerstone of PA CoP activities. Previous technical exchanges have addressed Engineered Barriers (2009 - http://www.cresp.org/education/workshops/pacop/), the Advanced Simulation Capability for Environmental Management and the Cementitious Barriers Partnership (2010 - http://srnl.doe.gov/copexchange/links.htm). Each technical exchange also includes summary presentations regarding activities at DOE, the Nuclear Regulatory Commission (NRC) and other organizations (e.g., International Atomic Energy Agency (IAEA)) as well as a number of presentations from selected sites to provide insight and perspective from on-going modeling activities. Through the deployment of PA Assistance Teams, the PA CoP has also been engaged in the development of new PAs across the DOE Complex. As a way of improving consistency in the preparation of new PAs, the teams provide technical advice and share experiences, noteworthy practices, and lessons learned from previous Low-Level Waste Disposal Facility Federal Review Group (LFRG) reviews. Teams have provided support for PAs at Hanford, Idaho, Paducah and Portsmouth. The third annual PA CoP Technical Exchange was held on May 25-26, 2011 in Atlanta, GA. The PA CoP Steering Committee Meeting held its first meeting on May 24 prior to the Technical Exchange. Decision making using models and software quality assurance were the topical emphasis for the exchange. A new feature at the 2011 technical exchange was the use of panel discussions to solicit feedback from regulators and practitioners. This report summarizes discussions and recommendations from the steering committee meeting and presentations and feedback obtained at the technical exchange. Appendix I includes the steering committee meeting agenda and Appendix II includes the agenda for the technical exchange and a screenshot of the presentations and video files that are available online.

99 GENERAL AND MISCELLANEOUS↗

IMPROVING CONSISTENCY OF PERFORMANCE ASSESSMENTS IN THE DOE COMPLEX

The low-level waste (LLW) performance assessment (PA) process has been traditionally focused on disposal facilities at a few United States Department of Energy (USDOE) sites and commercial disposal facilities. In recent years, there has been a dramatic increase in the scope of the use of PA-like modeling approaches, involving multiple activities, facilities, contractors and regulators. The scope now includes, for example: (1) National Environmental Policy Act (NEPA) assessments, (2) CERCLA disposal cells, (3) Waste Determinations and High-Level Waste (HLW) Closure activities, (4) Potential on-site disposal of Transuranic (TRU) waste, and (5) In-situ decommissioning (including potential use of existing facilities for disposal). The dramatic increase in the variety of activities requiring more detailed modeling has resulted in a similar increase in the potential for inconsistency in approaches both at a site and complexwide scale. This paper includes a summary of USDOE Environmental Management (EM) sponsored initiatives and activities for improved consistency. New initiatives entitled the Performance Assessment Community of Practice and Performance Assessment Assistance Team are also introduced.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Uncertainties In Performance Assessments For The Yucca Mountain Site And The Edge-of-Compliance

Numerical performance assessments of deep geologic disposal systems of long-lived radioactive wastes serve as the primary tool for quantitatively assessing projected performance and for making regulatory compliance decisions, both in the U.S. and disposal programs abroad. However there is a significant body of opinion, expressed in the international literature, that the confidence that can be placed on such assessments decreases significantly as the analysis time frames increase into the many hundreds of thousands of years. With the inclusion of highly corrosion resistant metals in the planned waste package designs for the Yucca Mountain (YM) system commercial spent fuel and defense-generated high-level radioactive waste disposal, published projections for the site show doses to the receptor at times extending into the many hundreds of thousands of years. The question of relative confidence in dose projections becomes more important at very long time frames, particularly when the time frame for significant doses increases dramatically reflecting the effects of using highly corrosion resistant materials. To examine uncertainties in performance assessments of the YM disposal system over very long time frames, a site model developed by the U.S. Department of Energy to assess sensitivities in peak dose performance was modified and used to examine the propagation of uncertainties for a hypothetical disposal system. These analyses start with a hypothetical disposal system at the 'edge-of-compliance' at 10,000 years, reflecting the generic repository standard in 40 CFR Part 191. The hypothetical system was poised to give a mean dose of 0.15 milli-sievert/year (15 mrem/yr.) at 10,000 years, by allowing a fixed number of waste packages to 'fail' within the first 5,000 years after closure. By maintaining the number failed waste packages constant over time, the spread in dose estimates over the time to peak dose was calculated for this system perched at the 'edge-of-compliance' at 10,000 years. This hypothetical construct removes waste package performance from the analyses and allows the site model to explore the effects of uncertainties in the natural barrier and site conditions on the dose projections out to the time of peak dose. The sensitivities of these projections to various 'driver' parameters were examined, including infiltration rates, solubility constraints, water chemistry and roof collapse assumptions. Overall, the initial construct showed a one and one-half order of magnitude spread between the 5. and 95. percentiles at 10,000 years, the initial state for the analyses. This spread increased to approximately three and one-half orders of magnitude at peak dose, reflecting the effects of transport and retardation mechanisms on the fixed source term. The model eliminated portions of the transport path from the repository where relatively little retardation would be expected. Travel times were therefore significantly reduced thereby eliminating radioactive decay as an important mechanism in reducing projected doses. Solubility controls appear to be a major source of uncertainties in the dose projections for the model used. These results support the general international consensus that confidence in dose projections over very long time frames does decrease, and illustrates that this conclusion also applies to assessments of the YM projected performance as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗