Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Performance Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

High-speed engine/component performance assessment using exergy and thrust-based methods

This investigation summarizes a comparative study of two high-speed engine performance assessment techniques based on energy (available work) and thrust-potential (thrust availability). Simple flow-fields utilizing Rayleigh heat addition and one-dimensional flow with friction are used to demonstrate the fundamental inability of conventional energy techniques to predict engine component performance, aid in component design, or accurately assess flow losses. The use of the thrust-based method on these same examples demonstrates its ability to yield useful information in all these categories. Energy and thrust are related and discussed from the stand-point of their fundamental thermodynamic and fluid dynamic definitions in order to explain the differences in information obtained using the two methods. The conventional definition of energy is shown to include work which is inherently unavailable to an aerospace Brayton engine. An engine-based energy is then developed which accurately accounts for this inherently unavailable work; performance parameters based on this quantity are then shown to yield design and loss information equivalent to the thrust-based method.

Riggins, D. W.

Performance Assessment of the Eastern Range Mosquito Lagoon 915-MHz Doppler Radar Wind Profiler

Please find enclosed the performance assessment for the Mosquito Lagoon 915-MHz Doppler Radar Wind Profiler (DRWP). This assessment was conducted following the installation of the new DRWP systems at the Eastern Range. DRWP profiles were compared to Automated Meteorological Profiling System balloons launched from Cape Canaveral Space Force Station. Launching balloons from the DRWP site was discussed, but was determined to be unfeasible. Therefore, these results include errors due to the spatial separation of winds. Mean wind component deltas generally ranged between -1.4-2.0 m/s between the balloons and DRWP systems. Data availability at discrete altitudes ranged from 7% to 98% with the least amount of available profiles being in the upper altitude ranges between 4000 m and 5000 m as well as below 300 m. The effective vertical resolution was not able to be estimated in this study, likely due to the relatively small dataset. The results from this analysis were requested by the United States Space Force for use of the acceptance of the DRWP system and for internal EV44 reference.

meteorology

A unified process for systems identification based on performance assessment

Many modern spacecraft are complex multi-body dynamic systems where the bodies are connected by several active control systems for pointing and isolation. Mission requirements indicate that many structural modes and possibly some nonlinear effects will require characterization. Thus, even characterization at the subsystem level will become more difficult than usual. System level characterization difficulties will be compounded by the fact that only limited ground testing will be possible on the full up system, and flight testing will be restricted by an extremely limited measurements set. The object of the present discussion is the application of matrix majorant theory to the problem of assessing dynamic system performance when knowledge of the system is uncertain. We show how majorants provide an effective tool to relate required performance output to system identification test quality in terms of residual uncertainty in input-output relations, parameter values, nonlinearities, and interactions. The underlying machinery consists of the block-norm matrix which is a nonnegative matrix each of whose elements is the norm of a block of a suitably partitioned matrix. A matrix which bounds the block-norm matrix in the sense of nonnegative matrices, i.e., element by element is known as a majorant.

Hyland, C.

Performance assessment in complex individual and team tasks

Described here is an eclectic, performance based approach to assessing cognitive performance from multiple perspectives. The experience gained from assessing the effects of antihistamines and scenario difficulty on C (exp 2) decision making performance in Airborne Warning and Control Systems (AWACS) weapons director (WD) teams can serve as a model for realistic simulations in space operations. Emphasis is placed on the flexibility of measurement, hierarchical organization of measurement levels, data collection from multiple perspectives, and the difficulty of managing large amounts of data.

Eddy, Douglas R.

Image Navigation and Registration Performance Assessment Evaluation Tools for GOES-R ABI and GLM

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24 hour evaluation period. This paper describes the software design and implementation of IPATS and provides preliminary test results.

Image registration

Image Navigation and Registration Performance Assessment Evaluation Tools for GOES-R ABI and GLM

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24 hour evaluation period. This paper describes the software design and implementation of IPATS and provides preliminary test results.

image registration

Image Navigation and Registration Performance Assessment Tool Set for the GOES-R Advanced Baseline Imager and Geostationary Lightning Mapper

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. For ABI, these metrics are the 3-sigma errors in navigation (NAV), channel-to-channel registration (CCR), frame-to-frame registration (FFR), swath-to-swath registration (SSR), and within frame registration (WIFR) for the Level 1B image products. For GLM, the single metric of interest is the 3-sigma error in the navigation of background images (GLM NAV) used by the system to navigate lightning strikes. 3-sigma errors are estimates of the 99.73rd percentile of the errors accumulated over a 24-hour data collection period. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24-hour evaluation period. Another aspect of the IPATS design that vastly reduces execution time is the off-line propagation of Landsat based truth images to the fixed grid coordinates system for each of the three GOES-R satellite locations, operational East and West and initial checkout locations. This paper describes the algorithmic design and implementation of IPATS and provides preliminary test results.

Image Navigation

Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for the GOES-R Advanced Baseline Imager and Geostationary Lightning Mapper

The GOES-R Flight Project has developed an Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) for measuring Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM) INR performance metrics in the post-launch period for performance evaluation and long term monitoring. For ABI, these metrics are the 3-sigma errors in navigation (NAV), channel-to-channel registration (CCR), frame-to-frame registration (FFR), swath-to-swath registration (SSR), and within frame registration (WIFR) for the Level 1B image products. For GLM, the single metric of interest is the 3-sigma error in the navigation of background images (GLM NAV) used by the system to navigate lightning strikes. 3-sigma errors are estimates of the 99.73rd percentile of the errors accumulated over a 24 hour data collection period. IPATS utilizes a modular algorithmic design to allow user selection of data processing sequences optimized for generation of each INR metric. This novel modular approach minimizes duplication of common processing elements, thereby maximizing code efficiency and speed. Fast processing is essential given the large number of sub-image registrations required to generate INR metrics for the many images produced over a 24 hour evaluation period. Another aspect of the IPATS design that vastly reduces execution time is the off-line propagation of Landsat based truth images to the fixed grid coordinates system for each of the three GOES-R satellite locations, operational East and West and initial checkout locations. This paper describes the algorithmic design and implementation of IPATS and provides preliminary test results.

Image Registration

Performance Assessments and Comparisons of S-NPP and NOAA-20 (JPSS-1) VIIRS On-Orbit Calibration

The first Visible Infrared Imaging Radiometer Suite (VIIRS) instrument has been in operation for more than 6 years on-board the S-NPP satellite and the second instrument, with the same design and performance requirements, was launched in November, 2017 on-board the JPSS-1 satellite (named NOAA-20 after reaching its orbit) and is currently in normal operation conditions. This paper provides a brief description of VIIRS on-orbit calibration and characterization activities and presents performance assessments and comparisons of S-NPP and NOAA-20 VIIRS using data collected from their on-board calibrators (OBC) and regularly scheduled lunar observations. Results show that NOAA-20 VIIRS is performing as well or better than S-NPP VIIRS in all of the key performance metrics. The NOAA-20 reflective solar bands, including the day-night band, have experienced less than 1% change in gain in the first 250 days since launch and did not suffer from the contamination related rapid degradation experienced by S-NPP VIIRS. Some of the NOAA20 thermal emissive bands had larger than expected gain degradation after launch due to ice buildup on the dewar window of the long-wave IR focal plane assembly but a mid-mission outgassing operation was able to restore their gains and maintain stable behavior. Though this study is focused on the sensor's key performance parameters, such as detector responses (gains), signal-to-noise ratios, and noise-equivalent temperature differences, challenges identified and lessons learned through different phases of on-orbit calibration and characterization are also discussed.

DNB

Computer simulation and performance assessment of the packet-data service of the Aeronautical Mobile Satellite Service (AMSS)

The ICAO Aeronautical Mobile Communications Panel (AMCP) completed the drafting of the Aeronautical Mobile Satellite Service (AMSS) Standards and Recommended Practices (SARP's) and the associated Guidance Material and submitted these documents to ICAO Air Navigation Commission (ANC) for ratification in May 1994. This effort, encompassed an extensive, multi-national SARP's validation. As part of this activity, the US Federal Aviation Administration (FAA) sponsored an effort to validate the SARP's via computer simulation. This paper provides a description of this effort. Specifically, it describes: (1) the approach selected for the creation of a high-fidelity AMSS computer model; (2) the test traffic generation scenarios; and (3) the resultant AMSS performance assessment. More recently, the AMSS computer model was also used to provide AMSS performance statistics in support of the RTCA standardization activities. This paper describes this effort as well.

Ferzali, Wassim

An Analytical Performance Assessment of a Fuel Cell-powered, Small Electric Airplane

Rapidly emerging fuel cell power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and with exception of water vapor zero emissions. This paper describes an analytical feasibility and performance assessment conducted by NASA's Glenn Research Center of a fuel cell-powered, propeller-driven, small electric airplane based on a model of the MCR 01 two-place kitplane.

Berton, Jeffrey J.

Cassini Maneuver Performance Assessment and Execution-Error Modeling Through 2015

In its twelfth year touring Saturn, the Cassini spacecraft continues to gather valuable scientific data about the planet and its moons. Cassini has executed a total of 331 propulsive maneuvers through January 23, 2016. With more than 30 maneuvers planned through July 2017 before the mission ends in September 2017, a dwindling propellant supply has become a chief concern. This manuscript will report on the analysis of Cassini maneuvers performed through December 30, 2015 and recommend execution-error models for the remainder of the mission. Maneuver performance assessment techniques and execution-error model development methods will also be outlined.

Wagner, Sean V.

Cassini Maneuver Performance Assessment and Execution-Error Modeling Through 2015

In its twelfth year touring Saturn, the Cassini spacecraft continues to gather valuable scientific data about the planet and its moons. Cassini has executed a total of 331 propulsive maneuvers through January 23, 2016. With more than 30 maneuvers planned through July 2017 before the mission ends in September 2017, a dwindling propellant supply has become a chief concern. This manuscript will report on the analysis of Cassini maneuvers performed through December 30, 2015 and recommend execution-error models for the remainder of the mission. Maneuver performance assessment techniques and execution-error model development methods will also be outlined.

Wagner, Sean V.

Performance Assessments of the SNPP and N20 VIIRS DNB Using Observations of Bright Stars

The Visible Infrared Imaging Radiometer Suite (VIIRS) on-board the Suomi-NPP (SNPP) and NOAA-20 (N20) spacecrafts is a multi-spectral Earth-observing instrument with spectral channels ranging from the visible to the long-wave infrared. In addition to these spectral channels, the VIIRS instrument features a panchromatic Day/Night band (DNB) with 3 gain stages (low, mid, and high) which allows for Earth-view (EV) radiance retrievals over 7 orders of magnitude. The DNB is able to collect data ranging from dim city lights during nighttime up to reflected sunlight from cloud-tops during daytime. The DNB data collection is divided into 32 aggregation modes, where sub-pixel aggregation is used to maintain a nearly constant pixel footprint on ground during EV data collection throughout each scan. The DNB is also sensitive enough to observe bright stars through the instrument space-view (SV) port. Data from these bright stars can be used to track the temporal stability of the sensor gain and as a method of intercomparison between the two VIIRS instruments. In this work, we will present several sensor performance assessments of the VIIRS DNB using stars. In addition to the sensor gain trending, these assessments will include a comparison of the differences between the daytime and nighttime data due to the effects of stray-light, a comparison of the measured signal as a function of aggregation mode, a comparison between the two high-gain sub-stages, and half-angle mirror side for both the SNPP and N20 VIIRS DNB.

VIIRS

Inconsistent Strategies to Spin up Models in CMIP5: Implications for Ocean Biogeochemical Model Performance Assessment

During the fifth phase of the Coupled Model Intercomparison Project (CMIP5) substantial efforts were made to systematically assess the skill of Earth system models. One goal was to check how realistically representative marine biogeochemical tracer distributions could be reproduced by models. In routine assessments model historical hindcasts were compared with available modern biogeochemical observations. However, these assessments considered neither how close modeled biogeochemical reservoirs were to equilibrium nor the sensitivity of model performance to initial conditions or to the spin-up protocols. Here, we explore how the large diversity in spin-up protocols used for marine biogeochemistry in CMIP5 Earth system models (ESMs) contributes to model-to-model differences in the simulated fields. We take advantage of a 500-year spin-up simulation of IPSL-CM5A-LR to quantify the influence of the spin-up protocol on model ability to reproduce relevant data fields. Amplification of biases in selected biogeochemical fields (O2, NO3, Alk-DIC) is assessed as a function of spin-up duration. We demonstrate that a relationship between spin-up duration and assessment metrics emerges from our model results and holds when confronted with a larger ensemble of CMIP5 models. This shows that drift has implications for performance assessment in addition to possibly aliasing estimates of climate change impact. Our study suggests that differences in spin-up protocols could explain a substantial part of model disparities, constituting a source of model-to- model uncertainty. This requires more attention in future model intercomparison exercises in order to provide quantitatively more correct ESM results on marine biogeochemistry and carbon cycle feedbacks.

histories

Space Shuttle main engine performance assessment - Columbia's first flight

Design features and performance of the Shuttle main engines first flight are presented. Each of the three engines produces 470,000 lb of thrust, operates at 3,012 psia, and has a 77.5 to 1 nozzle expansion ratio. The engines are designed for a 7.5 hr operational life, and will be tested at 109% capacity in future Shuttle flights. The developmental program is outlined, and includes 127,000 sec of operational testing on 19 engines. Engine operations and components are described, noting 100% burning of the hydrogen and oxidizer, high pressure fuel turbopumps, the controller assembly, etc.; details of solutions to fatigue failures and subsequent certification are provided. The nine minute first flight firing revealed a radiant heating of a control sensor transducer, which was shielded for succeeding flights. Alternatives are given for thrust augmentation, for which each 1% yields an additional 800 lb payload increase capability, and can be implemented by 1987.

Thompson, J. R., Jr.