Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PUBLIC SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An end of service life assessment of PMMA lenses from veteran concentrator photovoltaic systems

The optical performance of poly(methyl methacrylate) lenses from veteran concentrator photovoltaic modules was examined after the end of their service life. Lenses from the Martin-Marietta and Intersol module designs were examined from the 'Solar Village' site near Riyadh, Saudi Arabia, as well as the Phoenix Sky Harbor airport, followed by the Arizona Public Service Solar Test and Research (APS-STaR) center in Tempe, Arizona. The various lens specimens were deployed for 20, 27, and 22 years, respectively. Optical characterizations included lens efficiency (Solar Simulator instrument), material transmittance and haze (of coupons cut from veteran lenses, then measured again after their faceted back surface was polished, and then measured again after the incident front surface was polished), and direct transmittance (as a function of detector's acceptance angle, using the Very Low Angular Beam Spread ('VLABS') instrument). Lens efficiency measurements compared the central region to the entire lens, also using hot and cold mirror measurements to diagnose differences in performance. A series of subsequent characterizations was performed because a decrease in performance of greater than 10% was observed for some of the veteran lenses. The optimal focal distance of the lenses was quantified using the Solar Simulator, and then correlated to lens curvature using a recently developed measurement technique. Surface roughness was examined using atomic force microscopy and scanning electron microscopy. Facet geometry (tip and valley radius) was quantified on cross-sectioned specimens. As a result, molecular weight was compared between the incident and faceted surfaces of the lenses.

14 SOLAR ENERGY↗

Irreversible Wash Aid Additive for Cesium Mitigation: Phase II. Selection and/or Modification of COTS Field Portable Waste Water Systems

After an accidental or malicious release of radioactivity, large urban areas may be contaminated, compromising response efforts by first responders and law enforcement officials. In addition, some public services (e.g., drinking water and wastewater treatment, electrical power distribution, etc.) may be disrupted. In such an event, it may be important to deploy mitigation efforts in certain areas to restore response activities and public services (Fig. S-1). This report explores the state-of-the-art approach for a system to rapidly return critical infrastructure components to service following a cesium-137 (Cs-137) radiological dispersal device (RDD) release while avoiding the spread of Cs-137 beyond its original deposition area and minimizing the amount of Cs-137-contaminated wastewater. Specifically, we describe a wash system consisting of chemical additives added to fire hydrant water and irreversible solid sequestering agents added as the water is collected and treated for recycle in situ. The wash system is intended to be a rapidly deployable, cost-effective means of mitigating an urban setting for the purpose of restoring critical infrastructure and operational activities after a radiological release.

61 RADIATION PROTECTION AND DOSIMETRY↗

Hydrogen Fuel Cell Electric Bus (FCEB) Evaluations in US Public Transit Service

The National Renewable Energy Laboratory (NREL) is a Department of Energy (DOE) national laboratory focused on renewable energy and energy efficiency. NREL has evaluated alternative fuel and advanced propulsion transit buses for DOE and the U.S. Department of Transportation's Federal Transit Administration (FTA). These evaluations are focused on determining the status of fuel cell systems and the corresponding infrastructure in transit applications to help DOE and FTA assess the progress toward technology readiness. For the last 19 years NREL has evaluated FCEBs in service around the United States and in Canada. The results of these evaluations have been published in numerous reports that compare FCEB performance to conventional technology as well as document the implementation experience and lessons learned by the transit agencies and their demonstration teams. Currently, 70 fuel cell buses are in active service in the US and 66 FCEBs are in development. NREL is evaluating a subset of the active FCEBs that includes three transit agencies demonstrating 25 fuel cell electric buses in California. One bus has exceeded 35,000 hours in service and 12 have exceeded 25,000 hours. Fuel economy for the current generation of FCEBs has improved 35% over the previous generation and is double that of conventional buses. Maintenance cost for FCEBs is equivalent to diesel and BEBs. The most up-to-date performance results will be presented, including fuel economy, availability, reliability, and operational costs.

bus↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 3

This project is a collaborative research effort between PKMJ Technical Services LLC, Idaho National Laboratory, and Public Service Enterprise Group (PSEG) Nuclear, LLC. The collaboration, led by PKMJ Technical Services LLC, is part of the industry Funding Opportunity Announcement (FOA) award under Advanced Nuclear Technology Development FOA #DE-FOA-0001817. The pilot demonstration focuses on the Circulating Water System (CWS), an important non-safety-related system that impacts the power generation capability of the plant site. Achieving riskinformed condition-based Predictive Maintenance (PdM) on the CWS will result in significant economic benefits, and the developed methodologies can also be applied to other plant systems. This approach supports an industry goal of ensuring that nuclear power generation remains a viable, economically competitive option in the energy market. Operation and Maintenance (O&M) costs include labor-intensive Preventive Maintenance (PM) programs that involve manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies as well as time-based replacement of assets, irrespective of condition. This project offers an alternative by focusing on riskinformed condition-based maintenance to reduce O&M costs while still maintaining plant health and safety. This report summarizes the progress made toward achieving a risk-informed condition-based maintenance approach. The research and development (R&D) activities presented in this report are associated with development of a nuclear digital platform application, integration of fault signature models, and automated work management processes. The fault signatures and Machine Learning (ML) models are key components in predictive analytics and are heavily leveraged to improve the insights received by existing plant process data sources. Availability of the analysis results within a centralized digital platform enhances efficiency by enabling automation of activities otherwise performed manually. Personnel are presented with enhanced information that can be used to evaluate plant status and risks. Utilizing the enhancements to data analytics supports automated responses, (i.e. issuance of work orders) to address developing equipment faults and thus preventing forced, unplanned shutdowns of components or systems. The R&D activities described within this report lay the foundation for developing and demonstrating a digital automated platform to centralize the implementation of condition monitoring and response to equipment faults. The digital automated platform is cloud-based and designed to enable improved efficiency of plant processes. The digital platform includes content related to maintenance optimization, fault signature analysis, and plant records, which can all be used to support efficiencies when located within a centralized digital platform. These efficiencies could be further enhanced when deployed through industry-wide deployment of the technology to improve insights and processes based upon economies of scale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of an Integrated Distribution Management System

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Peña Station NEXT Energy District Master Plan (Cooperative Research and Development Final Report, CRADA Number CRD-17-681)

The objective of the project is to work in close collaboration with Panasonic, Xcel Energy (Public Service), and their partners L.C. Fulenwider, and Denver International Airport to examine different design and technology options in creating an energy master plan for the 400 acre Pena Station NEXT district in Denver, Colorado. To accomplish this, NREL will conduct a solar power/battery storage/grid integration study using the OpenDSS platform linked to UrbanOPT software.

25 ENERGY STORAGE↗

Jamaica National Net-Billing Pilot Program Evaluation

This technical report discusses the effectiveness of the Jamaica Public Service Company Limited Net-Billing Pilot Program. The National Renewable Energy Laboratory (NREL) collected and analyzed data from a wide range of stakeholders, conducted in-country research, and compared program elements to common interconnection practices to form programmatic recommendations for the Jamaica context. NREL finds that the net-billing pilot program has successfully contributed to the support of the emerging solar market in Jamaica with the interconnection of 80 systems under the program for a total of 1.38 megawatts (MW) at the time of original analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Case Study: Integrate Nuclear Water Desalination - Regional Potable Water in Arizona

The present study analyzes the economic viability of an Integrated Energy System (IES) that couples a Reverse Osmosis (RO) water desalination facility with a Nuclear Power Plant (NPP). The case study is conducted in collaboration with Arizona Public Service (APS), the operating owner of the Palo Verde Generating Station (PVGS) NPP. Cooling water for the reactor steam cycle is derived from treated effluent from municipal wastewater treatment plants. APS has established a long-term water resources program to effect a substantial reduction in plant cooling costs through advanced treatment and cooling technologies, and through the use of alternative water sources to replace the increasingly expensive effluent. One possible option is to replace some amount of the annual volume of effluent with brackish groundwater from a local regional aquifer. Although much less expensive than the municipal effluent, the quantity of brackish groundwater that could be used for plant cooling is limited as a result of the salinity and its impact on plant operation. Consequently, supplemental treatment could be required such that a greater amount of brackish groundwater could be used to reduce the demand on effluent. A study was conducted in 2018 by Idaho National Laboratory (INL) to investigate the economics of a PVGS onsite RO desalination plant that would reduce the salinity of a municipal effluent and brackish water blend to an acceptable level. One of the main findings of that study was that the overall economics of water desalination can be greatly improved if, in addition to cooling water for PVGS, potable water could also be produced and sold for profit. In fact, the study concluded that only producing cooling water for PVGS via RO desalination is not economically viable. The present report investigates the economic impact of a large, regional RO desalination plant that could provide potable water for the region, considering the conclusions from the 2018 scoping study. The study looks in particular at the water-market situation for the developing municipalities in the west valley of Phoenix. In addition to providing potable water for the municipalities, the existing infrastructure that conveys effluent to the Palo Verde plant and onsite water treatment facilities could be used to manage the RO concentrate. The processed concentrate could lead to a cost reduction in plant cooling by replacing some amount of effluent. The analysis reported here considers two cases (for various scenarios). First, the Base Case considers that neither the regional nor the onsite RO is built. The 2018 INL study showed that some brackish water can be blended with the municipal effluent water without having to build the onsite RO. That correspond to the maximum economically profitable option. The Base Case is where APS pumps the maximum volume of less-expensive brackish water (limited by water chemistry in the circulating water system), i.e. the case for which cooling water acquisition and treatment cost are lowest (without RO). Second, the proposed RO Case includes two RO plants, one onsite at PVGS and another larger, regional RO plant close to the brackish water wells. The regional RO produces potable water that is sold to the regional municipalities, while the PVGS onsite RO treats (part of) the regional ROs' concentrate and brackish water blend. The desalinated water from the PVGS RO is used in the circulating water system at PVGS. The analysis evaluates the difference in economics, using the Net Present Value (NPV) and Internal Rate of Return (IRR), between the cases. By comparing the two cases, in addition to evaluating the economics of the regional RO, we can also assess the impact of the regional RO on PVGS operational costs and, consequently, APS economics. The study shows that there exist combinations of regional RO and PVGS RO sizes for which the total blowdown and water chemistry limits at PVGS (including regional RO concentrate treatment at PVGS) are satisfied. However, such combinations only exist if no additional brackish water is directly mixed in the tertiary water system at PVGS. This leads to higher Levelized Costs of Potable Water (LCOPW) compared to cases where additional brackish water is injected (but violate the physical constraints). Additional studies are suggested to investigate the benefit of additional brackish water injection (lowers cooling water cost) versus the cost of lifting the physical constraints, e.g. building additional evaporation ponds. Staying in the case of no additional brackish water and satisfying the existing PVGS constraints, the lowest LCOPW (~0.5 $/m 3 ) can be achieved with a size of the regional RO of ~1.4e7 m 3 /yr (11000 AF/yr) capacity, which leads to ~8.63e6 m 3 /yr (7000 AF/yr) of potable water while no onsite RO at PVGS is built. Considering the vii residential water demand model developed for the Phoenix west valley, the NPV for this regional RO would be ~$100 million if all municipalities in the vicinity participate from the beginning of the project.

97 MATHEMATICS AND COMPUTING↗

Regulators’ Financial Toolbox: Designing Low- and Moderate- Income (LMI) Community Solar Compensation Programs

On February 9, 2022, as part of the NARUC Winter Policy Summit, five NARUC Staff Subcommittees (Energy Resources and the Environment, Rate Design, Electricity, Electric Reliability and Resilience, and Consumers and the Public Interest) co-hosted two sessions on community solar. The first panel was Community Solar I: Benefits for Low- and Moderate-Income Consumers, featuring opening remarks from moderator Hon. Eric Blank, Chairman of the Colorado Public Utilities Commission, and presentations from Richard Caperton, Vice President, Policy and Market Development, Arcadia, on behalf of the Coalition for Community Solar Access (CCSA); Chris Nichols, Senior Program Director, Groundswell; and Ted Trabue, Managing Director, DC Sustainable Energy Utility. See presentations and recordings. The second panel, titled What is Community Solar 2: Cost Impacts to Participants and Non-Participants, featured opening remarks from moderator Jamie Barber, Director of the Energy Efficiency and Renewable Energy Unit at the Georgia Public Service Commission, and presentations from Dr. Gabriel Chan, Associate Professor, Humphrey School of Public Affairs, University of Minnesota; Matthew McDonnell, Managing Director, Strategen Consulting; and Katie Chiles Ottenweller, Southeast Director, Vote Solar. See presentations and recordings.

14 SOLAR ENERGY↗

Oneida Tribe of Indians of Wisconsin Energy Optimization Model

Oneida Nation is located in Northeast Wisconsin. The reservation is approximately 96 square miles (8 miles x 12 miles), or 65,000 acres. The greater Green Bay area is east and adjacent to the reservation. A county line roughly splits the reservation in half; the west half is in Outagamie County and the east half is in Brown County. Land use is predominantly agriculture on the west 2/3 and suburban on the east 1/3 of the reservation. Nearly 5,000 tribally enrolled members live in the reservation with a total population of about 21,000. Tribal ownership is scattered across the reservation and is about 23,000 acres. Currently, the Oneida Tribe of Indians of Wisconsin (OTIW) community members and facilities receive the vast majority of electrical and natural gas services from two of the largest investor-owned utilities in the state, WE Energies and Wisconsin Public Service. All urban and suburban buildings have access to natural gas. About 15% of the population and five Tribal facilities are in rural locations and therefore use propane as a primary heating fuel. Wood and oil are also used as primary or supplemental heat sources for a small percent of the population. Very few renewable energy systems, used to generate electricity and heat, have been installed on the Oneida Reservation. This project was an effort to develop a reasonable renewable energy portfolio that will help Oneida to provide a leadership role in developing a clean energy economy. The Energy Optimization Model (EOM) is an exploration of energy opportunities available to the Tribe and it is intended to provide a decision framework to allow the Tribe to make the wisest choices in energy investment with an organizational desire to establish a renewable portfolio standard (RPS).

14 SOLAR ENERGY↗

Studying the tastes effecting mode choice behavior of travelers under transit service disruptions

Public transit (PT) service disruption is a phenomenon which is quite common across the world and is characterized by significant delays or cancelations of transit services. These disruptions can substantially affect commuter trips, particularly in cities with significant PT mode share, which triggers a change in both short-term and long-term traveler behavior. While service disruptions due to cancelations have been well studied in the literature, there has been limited work on studying the impacts of disruptions due to significant service delays on traveler behavior. This study analyzes data from a joint revealed preference cum stated preference (RP-SP) survey conducted in the Chicago metropolitan area in the US to understand traveler’s mode choice under the two forms of PT service disruptions. The trip specific attributes of the other competing alternatives for an individual were extracted using Google’s application programming interface (API) in the survey. The collected data is analyzed using the latent class choice model formulation. The results show that travelers find canceled PT service situations 3 times more onerous than service disruptions due to delays. While the value of travel time savings under disruptions due to delays and cancelations for rail users is found to be around US$\$$10/hr and US$\$$32/hr respectively, for bus users the values are US$\$$19/hr and US$\$$43/hr respectively. The findings from this study provide separate sets of preferences under each disruption scenario to planners. This information will be useful in planning remedial actions aimed at minimizing the impact of transit service disruptions.

99 GENERAL AND MISCELLANEOUS↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 1

Due to continuing global energy market trends, driven heavily by the abundant preserves of natural gas, there is an immediate need to reduce costs associated with operation and maintenance (O&M) for the current domestic nuclear power industry and for future reactor developments. This is to ensure that nuclear power generation remains an economically competitive and viable option in the energy market. O&M costs include labor-intensive preventive maintenance (PM) programs, which involve manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets, irrespective of their condition. This has resulted in an expensive, labor-centric business model to achieve high capacity factors. Fortunately, there are technologies (advanced sensors, data analytics, and risk assessment methodologies) that can enable the transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in a significant reduction of PM activities, laying the foundation for real-time condition assessment of plant assets, reducing overall labor and part costs. To enable this transition, PKMJ Technical Services LLC is partnering with the U.S. Department of Energy’s Idaho National Laboratory (operated by the Battelle Energy Alliance, LLC) and the Public Services Enterprise Group (PSEG) Nuclear, LLC in the Integrated Risk-Informed Condition-Based Maintenance Capability and Automated Platform Project. In this report, the configuration of a digital cloud platform using Microsoft Azure is discussed, data from the PSEG Salem Nuclear Generating Station Units 1 & 2 are imported into a digital cloud platform, and the data is used for an evaluation of several key areas: cost impact analysis, risk-informed model development, and preventive maintenance strategy optimization. First, the cost impact analysis reviews which plant assets are potential good candidates for condition-based monitoring. Next, INL utilized the data in their local environment to develop the risk-informed model; which provides estimates of failure rates and probability of failures of assets based upon their past performance. The developed model is performed on assets selected from the cost impact analysis. Lastly, engineers assess the preventive maintenance strategy for the selected assets at PSEG against maintenance strategies in the nuclear industry for similar assets to potentially identify acceptable justification for the extension of current maintenance frequencies.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Downtown Detroit Energy Efficient Street Lighting

Reliable public lighting remains a critically important and valuable public service in Detroit, Michigan. The Downtown Detroit Energy Efficiency Lighting Program (the, “Program”) was designed and implemented to bring the latest advancements in lighting technology, energy efficiency, public safety and reliability to Detroit’s Central Business District, and the Program accomplished those goals successfully. Downtown’s nighttime atmosphere has been upgraded as a result of the installation of over 1000 new LED roadway lighting fixtures that were installed as part of the Program. The reliability of the lighting system has also improved.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sim2Ls: FAIR simulation workflows and data

Just like the scientific data they generate, simulation workflows for research should be findable, accessible, interoperable, and reusable (FAIR). However, while significant progress has been made towards FAIR data, the majority of science and engineering workflows used in research remain poorly documented and often unavailable, involving ad hoc scripts and manual steps, hindering reproducibility and stifling progress. We introduce Sim2Ls (pronounced simtools) and the Sim2L Python library that allow developers to create and share end-to-end computational workflows with well-defined and verified inputs and outputs. The Sim2L library makes Sim2Ls , their requirements, and their services discoverable, verifies inputs and outputs, and automatically stores results in a globally-accessible simulation cache and results database. This simulation ecosystem is available in nanoHUB, an open platform that also provides publication services for Sim2Ls , a computational environment for developers and users, and the hardware to execute runs and store results at no cost. We exemplify the use of Sim2Ls using two applications and discuss best practices towards FAIR simulation workflows and associated data.

59 BASIC BIOLOGICAL SCIENCES↗

Transforming Farming Systems on Public Lands in the EAA to Support Everglades Restoration

The public purchase of farmlands in the EAA provides an opportunity for transforming farming systems into truly sustainable systems and these can support the Everglades restoration efforts. The concept proposed in this presentation is that by reducing the yield intensity of farms and adding ecosystem services, public farm lands can serve both restoration and the economy more effectively and more efficiently. This working hypothesis will be evaluated by applying systems analysis approaches including life cycle analysis and embodied energy analysis. The rationale for pursuing new approaches ranges from the fact that climate change threats are global, not local, to the fact that eliminating Florida farms and moving production elsewhere yields no net ecological benefit. Historic water flow from Lake Okeechobee to Everglades is shown and the current concept of moving water explained. Southern Flow Way Plan 6 is explained and sustainable farming system in this newly acquired land presented. To determine if an EAA pulse-way strategy would work and meet the sustainability criteria requires integrated analysis of several systems - water budget, soil & water nutrient dynamics, prospects for new sugarcane varieties, soil subsidence and overall energy and carbon budget.

54 ENVIRONMENTAL SCIENCES↗

Microgrid optimized resource dispatch for public-purpose resiliency and sustainability. The Olney Town Center Microgrid Project

Communities in Atlantic coastal regions have in recent years sought to improve the resiliency of their critical infrastructure and public services, especially to protect against hurricanes and other events capable of causing widespread damage and disruption. As the backbone of any community’s critical functions, the electricity distribution system requires high resiliency in order to maintain local energy delivery services. Against this backdrop, the Project sought to develop a resilient energy microgrid control system capable of integrating distributed renewable energy resources, natural gas CHP units, energy storage, and demand-side management technologies in near-real-time optimization schemes for the community of Olney, Md. The Montgomery County Planning Board in 2005 established the Olney Town Center area as a “civic center/town commons,” in part because it serves as a key point of interaction in the community – but also because it contains numerous vital community assets. With a total peak electrical load of about 8 MW (including Montgomery General Hospital with a 2.4 MW peak), the Project area is a business and essential services area, directly serving a suburban population of more than 33,000 residents. It contains a hospital, police station, two fire stations, two schools, grocery stores, and gas stations, and the community’s water tower, among other things. Moreover, the location stands at the crossroads of two state highways that represent major regional arteries for commerce and public safety in Montgomery County. These characteristics made the Project area an appropriate setting for considering microgrid deployment. It presented a model of a typical Maryland suburban community, with geographic dispersion of vital assets over a sizeable area, and a combination of overhead distribution lines and underground cables serving those critical loads. Such a representative model helped to ensure the solutions developed and the scenarios tested would be readily applicable to other communities in the state and the region. Further, the Project’s outcomes and lessons provide insights to guide community microgrid design and development in many locations. To achieve Project objectives – including those established by the U.S. Department of Energy (DOE) National Energy Technology Laboratory – the Project team researched, developed, and tested in simulation a set of microgrid controls capable of maintaining electricity supplies for critical community loads in the event of a regional utility outage lasting many days or even weeks. Testing and analysis showed that the microgrid would be capable of maintaining electricity supply to critical loads essentially indefinitely in most outage scenarios, while also substantially improving overall reliability for microgrid customers. With targeted improvements in local utility distribution infrastructure, test analysis showed that the microgrid would be capable of reducing annual electricity outages for critical loads by 98%. Further, to help achieve environmental and efficiency policy goals established by both the State of Maryland and the federal government, the team designed the system to reduce the annual carbon footprint of served loads by 20%, and to improve system energy efficiency for those loads by at least 20%. Testing showed that, as designed, the system is capable of meeting these performance requirements, with potential for further improvements through more effective thermal energy utilization. This Final Report, comprised of four volumes and 11 annexes, presents the results of these project efforts, including feasibility assessment (section F) and guidance for decision-makers considering prospective deployment of public-purpose microgrid systems in Maryland communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

BPA Facts

The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

BPA Vision, BPA Mission, Pacific Northwest, dams, ↗

WE-G-BRA-02: SafetyNet: Automating Radiotherapy QA with An Event Driven Framework

Purpose: Quality assurance is an essential task in radiotherapy that often requires many manual tasks. We investigate the use of an event driven framework in conjunction with software agents to automate QA and eliminate wait times. Methods: An in house developed subscription-publication service, EventNet, was added to the Aria OIS to be a message broker for critical events occurring in the OIS and software agents. Software agents operate without user intervention and perform critical QA steps. The results of the QA are documented and the resulting event is generated and passed back to EventNet. Users can subscribe to those events and receive messages based on custom filters designed to send passing or failing results to physicists or dosimetrists. Agents were developed to expedite the following QA tasks: Plan Revision, Plan 2nd Check, SRS Winston-Lutz isocenter, Treatment History Audit, Treatment Machine Configuration. Results: Plan approval in the Aria OIS was used as the event trigger for plan revision QA and Plan 2nd check agents. The agents pulled the plan data, executed the prescribed QA, stored the results and updated EventNet for publication. The Winston Lutz agent reduced QA time from 20 minutes to 4 minutes and provided a more accurate quantitative estimate of radiation isocenter. The Treatment Machine Configuration agent automatically reports any changes to the Treatment machine or HDR unit configuration. The agents are reliable, act immediately, and execute each task identically every time. Conclusion: An event driven framework has inverted the data chase in our radiotherapy QA process. Rather than have dosimetrists and physicists push data to QA software and pull results back into the OIS, the software agents perform these steps immediately upon receiving the sentinel events from EventNet. Mr Keranen is an employee of Varian Medical Systems. Dr. Moran’s institution receives research support for her effort for a linear accelerator QA project from Varian Medical Systems. Other quality projects involving her effort are funded by Blue Cross Blue Shield of Michigan, Breast Cancer Research Foundation, and the NIH.

60 APPLIED LIFE SCIENCES↗