Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PTO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Review of Wave Energy Converter Power Take-Off Systems, Testing Practices, and Evaluation Metrics: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.

laboratory testing↗

Design Principles for Resonant Wave Energy Converters: Benchmarking Power Capture and Flow

Control co-design (CCD) in Wave Energy Converters (WECs) integrates the controller, power take-off (PTO), and buoy models during system design to optimize power output. Using the bi-conjugate impedance matching principle, this study models the PTO as a two-port network, revealing impedance matching conditions at the input and output ports as a function of the buoy, PTO, and controller. Here, this study examines the pairing of a flywheel-type pitch resonator PTO within a given buoy constrained by limited space and ballast capacity. The results show that physical constraints imposed by the buoy affect PTO performance. While controller tuning achieves optimal output impedance matching and flywheel inertia is maximized within the buoy's limitations, the PTO's input impedance remains smaller than the complex conjugate of the buoy's intrinsic impedance. This mismatch limits the PTO's ability to generate sufficient reaction torque, particularly outside the resonance frequency, resulting in narrow-band power transfer. The findings emphasize the need for PTO design modifications to improve input power transfer. Pendulum-based PTO mechanisms are proposed as alternatives to couple with multiple buoy motion modes and improve wave-to-wire efficiency while respecting system constraints.

Control Co-Design↗

On the optimal sizing of power take-off systems for wave energy converters

The power take-off (PTO) system in a wave energy converter (WEC) is the means by which the energy in an ocean wave is converted into useful energy. There has been a general lack of technology convergence in the wave energy industry and PTO design has been largely device-specific with the design process determined by the WEC developer. An optimized PTO design can significantly affect the efficiency, reliability, performance, and overall cost and viability of a device. There remains a need in the marine energy industry for best practices and efficient design processes to be identified as it could greatly benefit developers and researchers in designing an optimal WEC PTO. This research utilizes the open-source Matlab-Simulink based software, WEC-Sim, which was developed by the National Renewable Energy Laboratory, and the Eagle, a high-performance computing system, to model and optimize two WECs of different archetypes and then investigates if any trends exist that can be exploited for greater efficiency in optimal PTO design. The results from this research indicate that there may be an optimal sizing for WEC PTOs for both power and PTO force rating and that substantial reductions can be made in the cost of a device without significant loss in the energy produced. Furthermore this optimal sizing may be independent of WEC type and deployment location. With an optimal, or near optimal, approach to WEC PTO sizing demonstrated, a methodology is proposed to address the challenge of nameplate ratings in the wave energy industry.

13 HYDRO ENERGY↗

Dynamic Characterization and Performance Evaluation of a 10-kw Power Take-Off with Mechanical Motion Rectifier for Wave Energy Conversion

The power take-off (PTO) is a key component for wave energy converters (WECs). The dynamic properties of the PTO influence the response of the WEC and should be considered when designing the WEC and not oversimplified. In addition, the efficiency as well as the reliability can play an important role on whether the PTO can be suitable for real-world applications. In this paper, a novel compact PTO rated at 10 kW is designed and prototyped, and a comprehensive nonlinear dynamic model is established for the PTO. Through bench testing, the unknown parameters of the dynamic model are characterized and determined. Further verification shows that the model can predict the dynamic performance of the PTO well. In addition, the test results show that the mechanical motion rectifier PTO can achieve good energy transfer efficiency, especially for low-load and low-speed conditions.

bench test↗

Limits on the Range and Rate of Change in Power Take-Off Load in Ocean Wave Energy Conversion: A Study Using Model Predictive Control

Previous work comparing power take-off (PTO) architectures for ocean wave-powered reverse osmosis suggests that variable displacement in the wave energy converter (WEC)-driven pump does not offer a significant performance advantage. A limitation of that study is that the WEC was subject to a constant load within a given sea state (“Coulomb damping”) and did not account for controlled, moment-to-moment variation of the PTO load enabled by a variable displacement pump. This study explores the potential performance advantage of a variable PTO load over Coulomb damping. Model predictive control is used to provide optimal load control with constraints on the PTO load. The constraints include minimum and maximum loads and a limit on the rate of load adjustment. Parameter studies on these constraints enable conclusions about PTO design requirements in addition to providing an estimated performance advantage over Coulomb damping. Numerical simulation of the Oyster 1 WEC is carried out with performance weighted by historical sea state data from Humboldt Bay, CA. The results show a performance advantage of up to 20% higher yearly-average power absorption over Coulomb damping. Additionally, the parameter studies suggest that the PTO load should be adjustable down to at least 25% of the maximum load and should be adjustable between the minimum and maximum loads within a few seconds.

16 TIDAL AND WAVE POWER↗

From TPL assessment to design optimization: Wave energy converter control co-design applied to the RM3

The Reference Model (RM) project developed six marine energy converter concepts using a sequential design methodology, which, while widely adopted in the industry, often overlooks interactions between system components, resulting in suboptimal designs. One such example is the Reference Model 3 (RM3), a two-body point absorber wave energy converter (WEC). An assessment using the Technology Performance Level (TPL) revealed that RM3’s low power-to-cost ratio, partly due to expensive steel construction, limits its techno-economic performance. Here, this study aims to redesign RM3 by reducing its scale and employing control co-design to integrate WEC and Power Take-Off (PTO) dynamics, constraints, and cost considerations within an optimization framework. We demonstrate the limitations of RM3’s current PTO design and explore the benefits of scaling down to enhance techno-economic viability by lowering material costs. Using WecOptTool, we conduct a parameter sweep over gear ratios and spring stiffnesses for various Commercial Off-The-Shelf generators in irregular wave conditions. Our findings emphasize the importance of aligning PTO components with WEC dynamics, showing that control co-design and strategic scaling can improve RM3’s power-to-cost ratio. This study presents a transferable example of applied control co-design for other WECs, supporting early-stage developers in their design decisions.

Off the shelf components↗

Performance Testing of an Integrated Magnetic Power Take-Off

A wave energy converter (WEC) and the power take-off (PTO) generator system can be represented by using a mass-spring-dampener model. By incorporating a negative stiffness spring within the PTO, the overall stiffness of the PTO can be lowered allowing the impedance of the PTO to be more closely matched with the WEC. By designing for impedance matching the WEC can greatly enhance its power generation capability. This project has involved the design, fabrication and testing of a new type of linear-stroke length and rotary stroke length adjustable negative stiffness magnetic springs for use within a wave energy converter (WEC). The magnetic springs were studied by using 3-D finite element analysis with the objective of creating high energy density and a long linear stroke length. After the construction and testing of both a proof-of-principle adjustable linear and rotary magnetic spring prototype the rotary (torsional) magnetic spring was selected for scaling up analysis. The selected scaled-up proof-of-principle magnetic spring had a peak torque of 850 Nm with a ±45 degree stroke length. By translating the inner rotor relative to the outer rotor, the stiffness could be adjusted to be either negative or positive stiffness. During this project a magnetic lead screw was also studied, and it was shown that by combining the magnetic lead screw with a linearly translating magnetic spring a very long rotary stroke length could be attained. However, as the magnetic lead screw increased complexity and reduced overall energy density relative to a rotary (torsional) spring, this design approach was not further pursed. Dynamometer testing of the variable stiffness magnetic springs was first completed by Portland State University and following this the magnetic spring performance was independently verified by Sandia National Laboratory (Sandia). A WEC analysis when using a variable stiffness magnetic spring was completed by using the WecOptTool. WecOptTool is an open-source WEC optimization software developed by Sandia that supports efficient power take-off (PTO) and control optimization. Wave condition data from the Oregon PacWave test-site was used in this study. The analysis showed that a WEC with a tunable stiffness value could consistently achieve about 80% of its maximum theoretical power production. The use of a tunable stiffness WEC, rather than zero-stiffness or a constant stiffness WEC was also shown to lead to a smaller maximum PTO force requirement. The variable stiffness magnetic spring was integrated into an experimental WEC developed by Sandia, called a Wave-Bot. Sandia successfully completed water-tank testing of the Wave-Bot at the Navy’s Carderock, Maryland, wave-basin test site. The wave-basin testing helped to experimentally demonstrate the operating capabilities and increased power generation capability of a WEC containing an integrated variable stiffness magnetic spring. A WEC capacity factor analysis was also completed. The capacity factor was defined as the ratio of annual average WEC generator power to the maximum (RMS) generated power. This capacity factor provided a means of identifying the ratio of potential revenue to cost. It was calculated that if a tunable variable stiffness magnetic spring has RMS constraints it could operate with a capacity factor above 30%. This is comparable to a wind turbine’s capacity factor.

16 TIDAL AND WAVE POWER↗

A Power Takeoff Device for a Small Marine Hydrokinetic Turbine Deployed from an Unmanned Floating Platform

The design, development, and field-testing of a power takeoff (PTO) device equipped with a ball-type continuously-variable transmission (B-CVT) for a small marine hydrokinetic (MHK) turbine deployed from a floating unmanned autonomous mobile catamaran platform is described. The turbine is a partially-submerged multi-blade undershot waterwheel (USWW). The objective is to develop a PTO for the optimal conversion of the MHK energy harnessed by the turbine to electric power, which is stored in battery banks onboard the MHK platform. Modeling, simulation, and bench testing of the USWW and PTO show the feasibility of utilizing the B-CVT's variable gear ratio to decouple the USWW and generator speeds, maintaining the waterwheel within its optimal tip speed ratio (TSR) while varying the generator speed, thereby increasing the efficiency of the PTO. Results of bench and field testing in support of characterizing the power conversion capabilities of the PTO are described. The system being developed is in support of potential self-powered autonomous mobile recharge stations for unmanned aerial vehicles (U A V s) operating in coastal zones. Field tests of the complete MHK platform with 9 blades on the waterwheel and wheel sub mergences of 10 and 12 inches (full blade submergence) were performed. The overall proof-of-concept was successfully demonstrated, with the system satisfactorily capturing and converting water flow energy into electricity. The feasibility of utilizing the B-CVT as a means of increasing the PTO power capture capabilities and efficiency is analyzed.

Pimentel, Hugo↗

Investigating the Longevity of Hydraulic Power Take-Off Piston Seals in Wave Energy Converters

Wave energy converters (WECs) utilize hydraulic power take-off (PTO) systems. Hydraulic cylinder seals, which are commonly made from thermoplastic or elastomeric polymers, play a vital role in PTO system functionality as they are responsible for containing and isolating high-pressure fluids. However, manufacturers of WECs have identified a significant concern regarding the longevity of hydraulic piston seal wear due to a combination of stressors, such as high pressure, elevated temperature, chemical corrosion, and/or environmental conditions. Seal failure can result in a loss of tightness and fluid leakage, and consequently a reduction in the efficiency of WECs. Seal manufacturers do not typically provide durability data as the materials are not specifically designed for WEC applications, nor do they account for real-world conditions that the materials may be exposed to. Additionally, there is no comparative performance data available between different seal manufacturers, creating uncertainty in hydraulic PTO designs for WECs. This paper reviews the current state of available seal materials for WEC hydraulic PTO systems, seal selection criteria for WEC applications, potential seal degradation mechanisms, and also material properties of the seals, such as density, hardness, tensile strength, and operating temperature. In addition, this paper also examines current evaluation procedures for estimating the durability of WEC PTO seals. Lastly, additional research on estimating the lifespan of piston and rod polymer seals used in hydraulic PTO systems is proposed.

Elen, Muthu↗

Dynamic characterization and performance evaluation of a 10-kW power take-off with mechanical motion rectifier for wave energy conversion

The power take-off (PTO) is a key component for wave energy converters. In this paper, a compact PTO with mechanical motion rectification rated at 10 kW is designed and prototyped, and characterized. A piecewise nonlinear dynamic model is established to describe its unique dynamic property. A linear hydraulic actuator is adopted in lab testing to drive the prototype and the unknown parameters of the dynamic model are identified. Further verification shows that the model can predict the dynamic performance of the PTO well. The test results show that the mechanical motion rectifier-based PTO can achieve overall energy transfer efficiency as high as 65% in regular waves even when the generator is working below the rated electric load and speed. In the irregular wave test, the PTO achieved the overall energy transfer efficiency of 54%, and the peak-to-average ratio acquired during the test is 12.5.

16 TIDAL AND WAVE POWER↗

Control-inspired design and power optimization of an active mechanical motion rectifier based power takeoff for wave energy converters

Ocean waves have high energy density and are persistent and predictable. Yet, converting wave energy to a useable form remains challenging. A significant hurdle is the oscillatory nature of waves resulting in the alternating loads, which necessitate the use of rectification at some stage of the energy conversion. This research effort presents a novel design of active mechanical motion rectifier (AMMR) for the power takeoff (PTO), which provides enhanced controllability and better power performance when compared to passive mechanical motion rectifiers (MMR). Inspired by transistors used in synchronous electrical rectifiers, the proposed design uses controllable electromagnetic clutches in the mechanical transmission to allow active engagement-disengagement control; thus, rectifying the oscillatory motion into a unidirectional rotation for high energy conversion efficiency and allowing the generator in unidirectional rotation to control the bidirectional wave capture structure for maximizing the power output. A semi-analytical computational approach is developed to efficiently evaluate the optimal power achieved using the proposed AMMR-based PTO and active control. It is found that the AMMR-based PTO design yields a higher optimal power than the previous passive MMR design across the wave spectrum. The influences of generator inertia and reactive power are discussed. Furthermore, the effects of control parameters on the power output and the optimal trajectories are analyzed. Wave tank tests with the AMMR prototype demonstrated the effectiveness of AMMR based PTO design and validated the numerical analysis.

16 TIDAL AND WAVE POWER↗

Design of a Two-Body Wave Energy Converter Featuring Controllable Geometry

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continue to prove themselves as a promising modern renewable energy field. A wave energy converter (WEC) concept currently being explored is the variable-geometry WEC (VGWEC), which aims to add an extra control option to WEC design. VGWECs attempt to incorporate controllable geometric features to adjust the floating body hydrodynamics to favor either power absorption, load shedding, or other operational goals. These variable geometry components have been proposed to be controlled on a sea-state-to-sea-state or wave-to-wave time scale depending on the force (or torque) and bandwidth limitations of the actuators required to manipulate just the controllable geometric hull features. Having control over both the WEC geometry components and the power takeoff (PTO) offers the potential to improve overall system performance and reliability if a cost-effective solution can be found for a given WEC architecture. This paper will present the recent developments and results of a VGWEC concept that incorporates variable-geometry modules into a two-body WEC. In the proposed VGWEC concept, the variable-geometry modules consist of air-inflatable bags in the surface float and a water inflatable ring in the subsurface body. The surface float is tethered directly to the subsurface body through tether lines, each connected to a separate PTO. Adjusting the geometry of both the surface and subsurface bodies along with the PTO coefficients can maximize power in design sea states while reducing motion response and PTO forces when transitioning to sea states where rated power is reached and load shedding is prioritized. The ability to transition between operating condition is expected to increase the sea state operational map and power capacity.

geometry control↗

MBARI-WEC September and October 2022 Field Data

This data is needed to simulate a model of the MBARI-WEC (Monterey Bay Aquarium Research Institute, Wave Energy Converter device) in a simulation environment (e.g. Gazebo) for 56 observation dates in the time between September and October 2022, and to compare the simulation outputs to the corresponding field data of the physical MBARI-WEC. There were 50 observations chosen in Sept and 6 observations in Oct. To help understand terms below, a summary of the system can be found at the github link in the downloads section below. The Gazebo MBARI-WEC model is also provided, should users wish to simulate using this platform. There are 4 *mat files included. ................................................................................................................................................................................................................................... Spectrum and Simulation Inputs: September2022_spectrum_siminputs.mat and October2022_spectrum_siminputs.mat has data needed for simulation inputs in table format. These include the ocean spectrum for an observation and operating parameters of the MBARI-WEC during that observation. They are organized as rows representing an observation and columns representing data. For example, for the September *mat there are 50 rows. The first 7 columns are Datetime, sig_waveheight, peak_period, mean_period, heaveconedoor_status, pistonpos_mean, and scale_factor: - Datetime is the date and time the observation occurred in PST - sig_waveheight is the significant wave height of the ocean spectrum during that observation in meters - peak_period is the peak period of the ocean spectrum during that observation in seconds - mean_period is the mean period of the ocean spectrum during that observation in seconds - heaveconedoor_status is the status of the heave cone doors where 0 represents the doors are open and 1 represents they are closed - pistonpos_mean is the mean position of the PTO ram (piston) in meters - scale_factor is an additional factor of 0.5 --1.4 applied to a default damping relationship The next columns are data needed to represent the ocean spectrum. First are the frequencies [Hz] labeled as "f0-f38", then the variance density [m2/Hz] labeled as "vardens0-vardens38". October2022_spectrum_siminputs.mat follows as a similar format as above, but includes a larger amount of ocean spectrum frequencies and variance density elements. ................................................................................................................................................................................................................................... Field data: The field data is found in MBARIWEC_septdata.mat and MBARIWEC_octdata.mat for the observations of September and October, respectively. These contain data in a struct format. The struct contains the following fields for each observation: PC_BattCurr, PC_LoadCurr, PC_RPM, PC_Voltage, SC_Range, SC_Velocity, DateTime, where: - PC_BattCurr is the current flowing to or from the onboard batteries in Amps - PC_LoadCurr is the current flowing to the load dump in Amps - PC_RPM is the electric/hydraulic motor shaft speed (directly coupled) in RPM - PC_Voltage is the bus voltage at the power converter in Volts - SC_Range is the PTO ram (piston) position in meters where 0 is fully retracted and 2.03 is fully extended - SC_Velocity is the PTO ram (piston) velocity in meters/sec - DateTime is the date and time of the sampled field data in each observation in PST - Electric Power is equal to: PC_Voltage*(PC_BattCurr + PC_LoadCurr) in Watts For example, upon loading MBARIWEC_octdata.mat, the aforementioned fields would be loaded, each with {6x1} cells for the 6 observations chosen in October. Within the first cell of e.g. SC_Range would be sampled data representing the field data of the MBARIWEC PTO piston position for say, one hour, of the first October observation. The corresponding field DateTime would...

16 TIDAL AND WAVE POWER↗

Load Mitigating Feedback Control of WECs

This report outlines the development of load-mitigating feedback control for wave energy converters. A simple, self-tuning multi-objective controller is demonstrated in simulation for a 3-DOF (surge, heave, pitch) point absorber. In previous work, the proposed control architecture has been shown to be effective in experiment for a variety of device archetypes for the single objective of the maximization of electrical power capture: here this architecture is extended to reduce device loading as well. In particular, PTO actuation forces and the minimization of fatigue damage (determined from the sum of wave-exerted and PTO forces) are considered as additional objectives for the self-tuning controller. This controller is demonstrated for two similar, but distinct systems: one described by the identified linear models from physical testing of the WaveBot device, and another based upon a WEC-Sim simulation that expands upon boundary element method data from the WaveBot device. In both cases, because the power surface is consistently fairly flat in the vicinity of control parameters that maximize power capture in contrasting sea-states, it is found to be generally possible to mitigate either fatigue damage or PTO load. However, PTO load is found to conflict with fatigue damage in some sea-states, limiting the efficacy of control objectives that attempt to mitigate both simultaneously. Additionally, coupling between the surge and pitch DOFs also limits the extent to which fatigue damage can be mitigated for both DOFs in some sea-states. Because control objectives can be considered a function of the sea-state (e.g., load mitigation may not be a concern until the sea is sufficiently large) a simple transition strategy is proposed and demonstrated. This transition strategy is found to be effective with some caveats: firstly, it cannot circumvent the aforementioned objective contradictions. Secondly, this objective transition is too slow to act as a system constraint, and objective thresholds must thus be considered quite conservatively. Improvement of the adjustment strategy is demonstrated through the addition of an integral term. Selection of well-performing transition parameters can be a function of sea-state. While a simple selection procedure is proposed, it is non-optimal, and a more robust selection procedure is suggested for future work.

16 TIDAL AND WAVE POWER↗

Development of an Unmanned Mobile Current Turbine Platform: Preprint

The design and development of a prototype unmanned mobile floating platform, equipped with a custom low-flow marine current turbine for autonomously seeking and harnessing tidal/coastal currents is described. The platform is an unmanned surface vehicle in the form of a catamaran with two electric outboard motors and capabilities for autonomous navigation. An undershot water wheel, aided by a custom flow concentrator, has been selected as the basic design for the marine current turbine, which is mounted on the stern of the unmanned surface vehicle platform. The concept of operation is that the platform would navigate to a designated marine current resource, autonomously anchor at the location, align itself in the current and deploy the current turbine using a custom cable-lift deployment mechanism. As the turbine harnesses the local current, an onboard power-take-off device converts the harnessed mechanical energy to electricity which is stored in onboard batteries. Considerations of deployment in tidal and coastal waters required obtaining the necessary environmental permits for conducting in-water testing; developing required mitigation measures in protecting local wildlife and their habitats; and identifying potential in-water test sites and surveying them for their suitability in terms of the current resource, bottom type, water depth, and local boat traffic. The design and development of the turbine and the results of initial in-water testing are discussed. The potential for scaling up the system for extended capacity is presented.

ENGINEERING,TIDAL AND WAVE POWER↗

Maximizing Wave Energy Converter Power Extraction by Utilizing a Variable Negative Stiffness Magnetic Spring

Complex conjugate impedance matching is a key concept for wave energy converter design. Matching the impedance of the power take-off (PTO) system to the complex conjugate of the wave energy converter's (WEC) impedance ensures efficient transfer of energy from the WEC body motion to electrical power. In low frequency waves, impedance matching often requires a negative PTO stiffness. In this paper, an adjustable stiffness magnetic torsion spring will be presented and modeled to understand its potential to improve WEC performance. The spring has the ability to provide a negative stiffness, allowing the PTO impedance to more closely match the complex conjugate of the WEC impedance at low frequencies. The spring also supports an adjustable stiffness value, meaning it can be tuned according to the incoming wave conditions. The spring's tunability may put less stress on the rest of the PTO system in wave conditions outside its normal operation zone without sacrificing electrical power output. The adjustable magnetic spring's effects are modeled and explored in this paper by examining the resultant average annual electrical power and capacity factor. The study suggests that the tunable magnetic spring has the potential to significantly improve capacity factor while maintaining a high average electrical power.

16 TIDAL AND WAVE POWER↗

Design of a Two-Body Wave Energy Converter Featuring Controllable Geometry: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. A wave energy converter (WEC) concept, currently being explored, is hoping to add an extra control option to WEC design is the variable-geometry WEC (VGWEC). These VGWECs attempt to incorporate controllable geometric features to adjust the floating body hydrodynamics to favor either power absorption, load shedding, or other operational goals. These variable geometry components have been proposed to be controlled on a sea-state-to-sea-state or wave-to-wave time scale depending on the force (or toque) and bandwidth limitations of the actuators required to manipulate just the controllable geometric hull features. The opportunities of having control over both the WEC geometry components and the power-take-off (PTO) have the potential to improve overall system performance and reliability if a cost-effective solution can be found for a given WEC architecture. This paper will present the recent developments and results of a VGWEC concept that incorporates variable geometry modules into a two-body WEC. In the proposed VGWEC concept, the variable geometry modules consist of air inflatable bags in the surface float and a water inflatable ring in the subsurface body. The surface float is tethered directly to the subsurface body through tether lines each connected to a separate PTO. Adjusting the geometry of both the surface and subsurface bodies along with the PTO coefficients can be shown to maximize power in design sea states while reducing motion response and PTO forces when transitioning to sea states where rated power is reached and load shedding is prioritized in hopes of increasing the sea state operational map.

geometry control↗

Additional Degree of Freedom for WEC Model

'Additional Degree of Freedom for WEC' - WEC-Sim numerical model from RFTS 1 TEAMER project. An increase in wave energy converter (WEC) efficiency requires not only consideration of the nonlinear effects in the WEC dynamics and the power take-off (PTO) mechanisms, but also more integrated treatment of the whole system, i.e., the buoy dynamics, the PTO system, and the control strategy. It results in an optimization formulation that has a nonquadratic and nonstandard cost functional. This model presents the application of real-time nonlinear model predictive controller (NMPC) to two degrees of freedom point absorber type WEC with highly nonlinear PTO characteristics. The nonlinear effects, such as the fluid viscous drag, are also included in the plant dynamics. The controller may be implemented on a real-time target machine, and the WEC device is emulated in real-time using the WECSIM toolbox. Please see the ‘ReadMe’ within the root directory for an explanation of how to set-up and run the model. An article covering the development of this model is attached as "Real-Time Nonlinear Model Predictive Controller for Multiple Degrees of Freedom Wave Energy Converters with Non-Ideal Power Take-Off"

16 TIDAL AND WAVE POWER↗