Engineering PapersSearch

SEARCH · Engineering Papers

Results for “POWER PLANT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Dynamic Model Development of a Wind Power Plant Using Neural Net Method to Forecast Wind Power Output (CRADA Final Report)

This project is intended to model wind power plant based on monitored data at the wind power plant. This project will promote the university research in Renewable Energy area and trains the future highly qualified engineers. The dynamic model will be based on neural net model with the input from the two met towers (12 inputs), and the number of turbines in operation (one input). The overall input will be 13 inputs to drive the simulations. The output power at the point of interconnection will be used to tune the neural net weight coefficients. Two neural net concepts will be investigated (the back propagation neural net and the dynamic recurrent neural net with feedback).

17 WIND ENERGY

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Rocket Power Plants Based on Nitric Acid and their Specific Propulsive Weights

Two fields are reserved for the application of rocket power plants. The first field is determined by the fact that the rocket power plant is the only type of power plant that can produce thrust without dependence upon environment. For this field,the rocket is therefore the only possible power plant and the limit of what may be done is determined by the status of the technical development of these power plants at the given moment. The second field is that in which the rocket power plant proves itself the most suitable as a high-power drive in free competition with other types of power plants. The exposition will be devoted to the demarcation of this field and its division among the various types of rocket power plants.

Zborowski, Helmut

A full-scope, high-fidelity simulator-based hardware-in-the-loop testbed for comprehensive nuclear power plant cybersecurity research

Nuclear power plant (NPP) cybersecurity research often relies on hardware-in-the-loop (HIL) testbeds that integrate real hardware components into simulated environments. These testbeds allow researchers to identify vulnerabilities, evaluate attack impacts, and test security measures in a controlled setting. Furthermore, previous HIL testbeds lacked fidelity to accurately represent real nuclear systems, limiting the scope of cybersecurity analysis. This study presents the creation of a HIL testbed, devised upon a full-scope, high-fidelity NPP simulator, to facilitate realistic and comprehensive cybersecurity research. To demonstrate its capabilities, the control logic for the steam generator water level was migrated from the simulator to an external programmable logic controller. As a practical application of the developed testbed, supply chain attack scenarios were simulated by injecting malicious code into the controller logic, and the effects of manipulating sensor inputs and control commands were observed. While this HIL testbed provides more detailed simulations, enhanced realism, and wider applicability compared to other options utilizing a less complex simulator, it is also more intricate and costly. For this reason, we include a detailed comparison with some alternative architectures to aid fellow researchers and practitioners in the selection of a suitable HIL architecture based on specific research objectives.

47 OTHER INSTRUMENTATION

Use of AI for Interpreting Technical Specifications for Power Uprates in Nuclear Power Plants

Powerpoint presentation. Background information provided on power plant uprates. Discussion of the current and proposed approaches to power plant uprates. Explanation of what data is used to draft a LAR. Methods such as retrieval augmented generation (RAG) and fine-tuning are discussed. Use case analysis is performed. Different failure types are examined. Conclusions are drawn from the analysis. Future work is proposed.

97 - MATHEMATICS AND COMPUTING

A standard description and costing methodology for the balance-of-plant items of a solar thermal electric power plant. Report of a multi-institutional working group

Standard descriptions for solar thermal power plants are established and uniform costing methodologies for nondevelopmental balance of plant (BOP) items are developed. The descriptions and methodologies developed are applicable to the major systems. These systems include the central receiver, parabolic dish, parabolic trough, hemispherical bowl, and solar pond. The standard plant is defined in terms of four categories comprising (1) solar energy collection, (2) power conversion, (3) energy storage, and (4) balance of plant. Each of these categories is described in terms of the type and function of components and/or subsystems within the category. A detailed description is given for the BOP category. BOP contains a number of nondevelopmental items that are common to all solar thermal systems. A standard methodology for determining the costs of these nondevelopmental BOP items is given. The methodology is presented in the form of cost equations involving cost factors such as unit costs. A set of baseline values for the normalized cost factors is also given.

Source record

The Net Climate Impact of Coal-Fired Power Plant Emissions

Coal-fired power plants influence climate via both the emission of long-lived carbon dioxide (CO2) and short-lived ozone and aerosol precursors. Using a climate model, we perform the first study of the spatial and temporal pattern of radiative forcing specifically for coal plant emissions. Without substantial pollution controls, we find that near-term net global mean climate forcing is negative due to the well-known aerosol masking of the effects of CO2. Imposition of pollution controls on sulfur dioxide and nitrogen oxides leads to a rapid realization of the full positive forcing from CO2, however. Long-term global mean forcing from stable (constant) emissions is positive regardless of pollution controls. Emissions from coal-fired power plants until 1970, including roughly 1/3 of total anthropogenic CO2 emissions, likely contributed little net global mean climate forcing during that period though they may have induce weak Northern Hemisphere mid-latitude (NHml) cooling. After that time many areas imposed pollution controls or switched to low sulfur coal. Hence forcing due to emissions from 1970 to 2000 and CO2 emitted previously was strongly positive and contributed to rapid global and especially NHml warming. Most recently, new construction in China and India has increased rapidly with minimal application of pollution controls. Continuation of this trend would add negative near-term global mean climate forcing but severely degrade air quality. Conversely, following the Western and Japanese pattern of imposing air quality pollution controls at a later time could accelerate future warming rates, especially at NHmls. More broadly, our results indicate that due to spatial and temporal inhomogeneities in forcing, climate impacts of multi-pollutant emissions can vary strongly from region to region and can include substantial effects on maximum rate-of-change, neither of which are captured by commonly used global metrics. The method we introduce here to estimate regional temperature responses may provide additional insight.

Shindell, D.

A solar thermal electric power plant for small communities

A solar power plant has been designed with a rating of 1000-kW electric and a 0.4 annual capacity factor. It was configured as a prototype for plants in the 1000 to 10,000-kWe size range for application to small communities or industrial users either grid-connected or isolated from a utility grid. A small central receiver was selected for solar energy collection after being compared with alternative distributed collectors. Further trade studies resulted in the selection of Hitec (heat transfer salt composed of 53 percent KNO3, 40 percent NaNO2, 7 percent NaNO3) as both the receiver coolant and the sensible heat thermal stroage medium and the steam Rankine cycle for power conversion. The plant is configured with road-transportable units to accommodate remote sites and minimize site assembly requirements. Results of the analyses indicate that busbar energy costs are competitive with diesel-electric plants in certain situations, e.g., off-grid, remote regions with high insolation. Sensitivity of energy costs to plant power rating and system capacity factor are given.

Holl, R. J.

Spokane Eco-District Campus Performance Under Alternative Electricity Rates: Benefits for virtual power plant participants and suppliers

Here, the respective benefits for virtual power plant participants and suppliers are revealed and compared under alternative electricity rate structures, including conventional large commercial electricity rates, large commercial electricity rates with special rates for demand-side generation, and dynamic hourly transactive prices. These three scenarios were explored using the capabilities of the Eco-District campus, a virtual power plant in Spokane, Washington, that is supplied electricity by Avista Utilities. The Eco-District Campus was modeled to host solar power generation, battery energy storage, and thermal energy resources that must be coordinated with building heating and cooling needs. First, the electricity supplier’s costs for energy, infrastructure, and energy losses were modeled. Then, the virtual power plant’s performance was modeled while presuming that its manager would minimize its costs under its electricity rate structure. The demand charges of conventional commercial electricity rates managed monthly peak, as would be expected, but hourly dynamic transactive pricing resulted in a striking alignment between the costs incurred by the supplier and the virtual power plant’s energy costs.

Electricity rates

ISRU Reactant, Fuel Cell Based Power Plant for Robotic and Human Mobile Exploration Applications

Three basic power generation system concepts are generally considered for lander, rover, and Extra-Vehicular Activity (EVA) assistant applications for robotic and human Moon and Mars exploration missions. The most common power system considered is the solar array and battery system. While relatively simple and successful, solar array/battery systems have some serious limitations for mobile applications. For typical rover applications, these limitations include relatively low total energy storage capabilities, daylight only operating times (6 to 8 hours on Mars), relatively short operating lives depending on the operating environment, and rover/lander size and surface use constraints. Radioisotope power systems are being reconsidered for long-range science missions. Unfortunately, the high cost, political controversy, and launch difficulties that are associated with nuclear-based power systems suggests that the use of radioisotope powered landers, rovers, and EVA assistants will be limited. The third power system concept now being considered are fuel cell based systems. Fuel cell power systems overcome many of the performance and surface exploration limitations of solar array/battery power systems and the prohibitive cost and other difficulties associated with nuclear power systems for mobile applications. In an effort to better understand the capabilities and limitations of fuel cell power systems for Moon and Mars exploration applications, NASA is investigating the use of in-Situ Resource Utilization (ISRU) produced reactant, fuel cell based power plants to power robotic outpost rovers, science equipment, and future human spacecraft, surface-excursion rovers, and EVA assistant rovers. This paper will briefly compare the capabilities and limitations of fuel cell power systems relative to solar array/battery and nuclear systems, discuss the unique and enhanced missions that fuel cell power systems enable, and discuss the common technology and system attributes possible for robotic and human exploration to maximize scientific return and minimize cost and risk to both. Progress made to date at the Johnson Space Center on an ISRU producible reactant, Proton Exchange Membrane (PEM) fuel cell based power plant project to demonstrate the concept in conjunction with rover applications will be presented in detail.

Baird, Russell S.

Hybrid Power Plants for Energy Resilience: A Case Study

As renewable energy technologies are increasingly adopted, they pose an opportunity to improve the sustainability and resilience of distributed grids, especially when their design and operation is coordinated as a hybrid power plant. When included in hybrid power plants, distributed wind turbines in particular have the potential to enhance the resilience of distributed grids in areas with good wind resource, due to their ability to provide more consistent generation and ancillary services as compared to photo-voltaic (PV) solar panels. Despite this benefit, U.S. distributed wind adoption is lower than other comparable renewable energy technologies. In this study, we seek to demonstrate how hybrid power plants that include distributed wind turbines can contribute to distribution grid resilience by meeting loads (especially critical loads) more consistently, increasing reserve capacity, and providing value to customers during outages. To demonstrate these contributions, we integrate three separate frameworks and apply them to a case study in a rural electric cooperative in Iowa. Through this case study, we simulate and compare hybrid power plant design and operation during two hazard events: a tornado that causes a 48-hour distribution outage and a winter weather event that causes a 6-hour generation outage. The inclusion of a hybrid power plant that leverages 1) increased battery duration and 2) advanced forecasting and dispatch strategies that reserve capacity leading up to a hazard event best reduce lost loads as well as diesel consumption that would otherwise be used to meet those loads during short- and long-duration hazard events. Depending on the hybrid power plant capacity and operation, we find that the outage mitigation value of a hybrid power plant (measured in value to customers to avoid an outage and avoided lost revenues for the utility) is significant in both hazard events; adding wind, solar, and battery assets to the existing system adds about $50-$100M in avoided lost load and at least $4-$8k in utility value in the tornado hazard event, and $570k-$2.2M in avoided lost load and at least $220-$650 in utility value in the winter hazard scenario. In both the tornado and winter hazard scenarios, optimizing the operation of the hybrid system for resilience can lend similar value as increasing battery duration by 5 MWh for the lower capacity systems considered.

17 WIND ENERGY

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF

Grid Forming Control Tuning for a Hybrid Inverter-Based Resource Power Plant

A hybrid inverter-based resource (IBR) power plant consists of grid-following (GFL) and grid-forming inverter-based resources (GFM-IBR) connected in parallel. Here, this research focuses on how to design and tune GFM's control parameters to ensure stable operation of the hybrid power plant for weak and strong grid conditions. We consider two design cases: one where the GFL-IBR does not provide frequency support, and one where it does. It is found that the GFM's power-frequency synchronizing system can lose stability when the power-frequency droop constant is large and/or the grid is strong. Additionally, if the GFL has its frequency support enabled, oscillation stability worsens. To explain the mechanism of the interactions, we construct a feedback system for the synchronizing loop, which consists of the GFM's power-frequency droop control that generates the GFM's synchronizing angle, the GFL's phase-locked loop that measures the voltage phase angle, the GFL's frequency-power control that generates its power order, and the rest of the system. The feedback system is effective in illustrating the potential stability risks. Successful design ensures that the hybrid power plant can operate smoothly and ride through grid disturbances.

feedback systems

Performance calculations for 1000 MWe MHD/steam power plants

The effects of MHD generator operating conditions and constraints on the performance of MHD/steam power plants are investigated. Power plants using high temperature combustion air preheat (2500 F) and plants using intermediate temperature preheat (1100 F) with oxygen enrichment are considered. Variations of these two types of power plants are compared on the basis of fixed total electrical output (1000 MWe). Results are presented to show the effects of generator plant length and level of oxygen enrichment on the plant thermodynamic efficiency and on the required generator mass flow rate. Factors affecting the optimum levels of oxygen enrichment are analyzed. It is shown that oxygen enrichment can reduce magnet stored energy requirement.

Pian, C. C. P.

The application of simulation modeling to the cost and performance ranking of solar thermal power plants

Small solar thermal power systems (up to 10 MWe in size) were tested. The solar thermal power plant ranking study was performed to aid in experiment activity and support decisions for the selection of the most appropriate technological approach. The cost and performance were determined for insolation conditions by utilizing the Solar Energy Simulation computer code (SESII). This model optimizes the size of the collector field and energy storage subsystem for given engine generator and energy transport characteristics. The development of the simulation tool, its operation, and the results achieved from the analysis are discussed.

Rosenberg, L. S.