Engineering PapersSearch

SEARCH · Engineering Papers

Results for “POSTFLIGHT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Postflight hardware evaluation RSRM-29 (STS-54). Appendix C: Nozzle PFORs

Appendix C, Nozzle Postflight Observation Records (PFOR's) for the Final Postflight Hardware Evaluation Report RSRM-29 (STS-54) is provided. PFOR data are included on: nozzle joint condition; nose inlet-to-throat joint condition; and nozzle subassembly phenolic bondline condition.

Source record

Final postflight hardware evaluation report RSRM-28 (STS-53)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-28 (STS-53) RSRM flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64215), represents a summary of the RSRM-28 hardware evaluation. The as-flown hardware configuration is documented in TWR-63638. Disassembly evaluation photograph numbers are logged in TWA-1989. The RSRM-28 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on July 15, 1993. Additional time was required to perform the evaluation of the stiffener rings per special issue 4.1.5.2 because of the washout schedule. The release of this report was after completion of all special issues per program management direction. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable team and tracked through the PFAR system.

Starrett, William David, Jr.

Postflight hardware evaluation (RSRM-29, STS-54)

This document is the final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-29 flight set. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64221), represents a summary of the RSRM-29 hardware evaluation. Disassembly evaluation photograph numbers are logged in TWA-1990. The RSRM-29 flight set disassembly evaluations described in this document were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on September 9, 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Source record

Vestibular plasticity following orbital spaceflight: recovery from postflight postural instability

Results of previous studies suggested that the vestibular mediated postural instability observed in astronauts upon return to earth from orbital spaceflight may be exacerbated by an increased weighting of visual inputs for spatial orientation and control of movement. This study was performed to better understand the roles of visual and somatosensory contributions to recovery of normal sensori-motor postural control in returning astronauts. Preflight and postflight, 23 astronaut volunteers were presented randomly with three trials of six sensory organization test (SOT) conditions in the EquiTest system test battery. Sagittal plane center-of-gravity (COG) excursions computed from ground reaction forces were significantly higher on landing day than preflight for those test conditions presenting sway-referenced visual and/or somatosensory orientation cues. The ratio of summed peak-to-peak COG sway amplitudes on the two sway-referenced vision tests (SOTs 3 + 6) compared to the two eyes closed tests (SOTs 2 + 5) was increased on landing day, indicating an increased reliance on visual orientation cues for postural control. The ratio of peak-to-peak COG excursions on sway-referenced surfaces (SOTs 4, 5 & 6) to an earth fixed support surfaces (SOTs 1, 2 & 3) increased even more after landing suggesting primary reliance on somatosensory orientation cues for recovery of postflight postural stability. Readaptation to sway-referenced support surfaces took longer than readaptation to sway-referenced vision. The increased reliance on visual and somatosensory inputs disappeared in all astronauts 4-8 days following return to earth.

NASA Program Space Physiology and Countermeasures

Skeletal Recovery Following Long-Duration Spaceflight Missions as Determined by Preflight and Postflight DXA Scans of 45 Crew Members

Introduction: The loss of bone mineral in astronauts during spaceflight has been investigated throughout the more than 40 years of bone research in space. Consequently, it is a medical requirement at NASA that changes in bone mass be monitored in crew members by measurements of bone mineral density (BMD) with dual-energy x-ray absorptiometry (DXA). This report is the first to evaluate medical data to address the recovery of bone mineral that is lost during spaceflight. Methods: DXA scans are performed before and after flight in astronauts who serve on long-duration missions (4-6 months) to ensure that medical standards for flight certification are met, to evaluate the effects of spaceflight and to monitor the restoration to preflight BMD status after return to Earth. Through cooperative agreements with the Russian Space Agency, the Bone and Mineral Lab at NASA Johnson Space Center (Houston, TX), also had access to BMD data from cosmonauts who had flown on long-duration missions yielding data from a total of 45 individual crew members. Changes in BMD (between 56 different sets of pre- and postflight measurements) were plotted as a function of time (days after landing); plotted data were fitted to an exponential mathematical model that determined i) BMD change at day 0 after landing and ii) the number of days after which 50% of the lost bone was recovered ("Recovery Half-Life"). These fits were performed for BMD of the lumbar spine, trochanter, pelvis, femoral neck and calcaneus. Results: In sum, averaged losses of bone mineral after spaceflight ranged between 2-9% for sites in the axial and appendicular skeleton. The fitted postflight BMD values predicted a 50% recovery of bone loss for all sites within 9 months.

Sibonga, J. D.

Representation of the Physiological Factors Contributing to Postflight Changes in Functional Performance Using Motion Analysis Software

Astronauts experience changes in multiple physiological systems due to exposure to the microgravity conditions of space flight. To understand how changes in physiological function influence functional performance, a testing procedure has been developed that evaluates both astronaut postflight functional performance and related physiological changes. Astronauts complete seven functional and physiological tests. The objective of this project is to use motion tracking and digitizing software to visually display the postflight decrement in the functional performance of the astronauts. The motion analysis software will be used to digitize astronaut data videos into stick figure videos to represent the astronauts as they perform the Functional Tasks Tests. This project will benefit NASA by allowing NASA scientists to present data of their neurological studies without revealing the identities of the astronauts.

Parks, Kelsey

Development of Head-Trunk Coordination Measures for Monitoring Postflight Sensorimotor Readaptation Strategies

During exploration missions, individual health assessments will be required to account for variability in neurosensory adaptation and task readiness for the initial extravehicular activities (EVAs). Previous research has identified postflight vestibular alterations and disruptions in head-trunk coordination after both short and long duration spaceflight missions. Astronauts were found to minimize head angular displacement and utilize a consistent forward head tilt theorized as a compensatory approach to stabilize the cephalic system and reduce motion sickness during readaptation to Earth’s gravity. Further, anecdotal self-reports from Shuttle crewmembers stated that pitch and side-to-side head movements immediately post-landing typically resulted in perceived angular self-motion. Notable disruptions also occur upon arrival in orbit, with astronauts choosing waist rotation rather than head movements during dynamic tasks. It is thought that the underlying sensorimotor disruptions may contribute to motion sickness in space and upon landing, postflight gait dysfunction, and inaccurate spatial orientation when performing daily tasks. To better characterize microgravity-induced sensorimotor adaptations, it is important to develop measures and monitoring tools that have high sensitivity in detecting changes in head-trunk coordination.

H M Weiss