Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PORT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Highly Reliable Multi-Port Smart Inverter Modules for PV-Based Energy Systems

Generally, large electrolytic capacitors (E-caps) are required to decouple the double-line frequency power fluctuation inherent in all single-phase dc-ac or ac-dc converters. These E-caps pose the weak link in the photovoltaic (PV) inverter because they have poor reliability as a result of short life expectancy and higher equivalent series resistance (ESR) which leads to lower system efficiency. In this paper, multiport smart dual-inverter modules are proposed for residential PV inverter systems with balanced outputs to eliminate the requirement of large decoupling capacitors, thus leading to more reliable and highly efficient inverter modules. The balanced dual outputs are controlled in phase quadrature such that the double frequency current is completely eliminated. One phase supports the standalone residential loads, and the other phase interfaces with the grid, which is synchronized to the utility grid. Also, the proposed modular configuration is scalable to accommodate higher power rating by stacking and paralleling multiple modules. Simulation results for the dual-inverter modules rated for 1 kW each are presented to validate the proposed concept. Experimental results from a controller hardware-in-the-loop (CHIL) platform also verify its feasibility.

14 SOLAR ENERGY↗

Porting the Kitten Lightweight Kernel Operating System to RISC-V

Hardware design in high-performance computing (HPC) is often highly experimental. Exploring new designs is difficult and time-consuming, requiring lengthy vendor cooperation. RISC-V is an open-source processor ISA that improves the accessibility of chip design, including the ability to do hardware/software co-design using open-source hardware and tools. Co-design allows design decisions to easily flow across the hardware/software boundary and influence future design ideas. However, new hardware designs require corresponding software to drive and test them. Conventional operating systems like Linux are massively complex and modification is time-prohibitive. In this paper, we describe our port of the Kitten lightweight kernel operating system to RISC-V in order to provide an alternative to Linux for conducting co-design research. Kitten's small code base and simple resource management policies are well matched for quickly exploring new hardware ideas that may require radical operating system modifications and restructuring. Our evaluation shows that Kitten on RISC-V is functional and provides similar performance to Linux for single-core benchmarks. This provides a solid foundation for using Kitten in future co-design research involving RISC-V.

Gordon, Nick↗

Mapping of exhaust gas recirculation and combustion-residual backflow in the intake ports of a heavy-duty diesel engine using a multiplexed multi-species absorption spectroscopy sensor [Mapping of EGR and combustion residual backflow in the intake ports of a heavy duty diesel engine using a multiplexed multi-species absorption spectroscopy sensor]

Here, the combustion-residual backflow into the intake ports of a commercial diesel engine (Cummins ISX series) was spatiotemporally mapped using a multiplexed multi-species absorption spectroscopy sensor system; the resulting cycle- and cylinder-resolved measurements are applicable for assessing cylinder charge uniformity, control strategies, and computational fluid dynamics tools. On-engine measurements were made using four compact (3/8 in Outside Diameter) stainless steel probes which enabled simultaneous multi-point measurements, required minimal engine hardware modification, and featured a novel tip design for measurement of gas flows parallel to the probe axis. Three sensor probes were used to perform simultaneous backflow measurements in intake runners corresponding to three of the six engine cylinders, and a fourth probe was installed in the intake manifold plenum for tracking dynamics introduced by an external exhaust gas recirculation mixer. Near-crank-angle resolved measurements (5 kHz, that is, 1.2 crank angle resolution at 1000 RPM) were performed during steady-state engine operation at various levels of external exhaust gas recirculation to measure the gas properties and penetration distance of the backflow into the intake runners on a cylinder- and cycle-basis. Validation of computational fluid dynamics model results is also presented to demonstrate the utility of such measurements in advancing engine research.

33 ADVANCED PROPULSION SYSTEMS↗

Hydrogen Applications for Energy Transition in Port and Airport Operations at the Port Authority of New York and New Jersey

The Port Authority of New York and New Jersey (PANYNJ) is focused on achieving meaningful reductions in emissions as part of its environmental sustainability efforts. To reach its 2030 target for reducing Scope 1 and Scope 2 carbon dioxide equivalent (CO2e) emissions and its goal of net-zero emissions by 2050, PANYNJ is exploring a range of energy solutions, including hydrogen technologies. This report evaluates the potential role of hydrogen in reducing emissions across key operational areas: vehicles, equipment, stationary power, aviation propulsion, and marine propulsion. It examines hydrogen's technical feasibility, infrastructure needs, and economic implications within PANYNJ's operational context. The findings aim to inform decisions as PANYNJ transitions to cleaner energy sources and reduces environmental impacts. Based on the existing literature and stakeholders' feedback, the report outlines both opportunities and challenges associated with hydrogen integration, providing insights to guide PANYNJ's future sustainability initiatives.

33 ADVANCED PROPULSION SYSTEMS↗

Port Hope Area Initiative - Port Granby Project: Managing Highly Heterogeneous Low-Level Radioactive Waste - 20327

The Port Granby Project is a large remediation project currently approximately 95% complete. Initial waste characterization was provided through a borehole sampling program. As the waste was excavated, it was found to be highly heterogeneous, ranging from essentially 'clean' material to hundreds of Bq/g. This heterogeneity resulted in constantly changing site conditions. Methods to adapt to these conditions are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE ZERH Case Study: Clifton View Homes, Marine Drive and Port Hadlcok, Coupeville and Port Hadlock WA

Case study of two DOE 2015 Housing Innovation Award winning custom homes in the marine climate that got HERS 39 and 38 without PV or HERS 2-12 and -9 with PV, with 6.5” SIP walls and 10.25” SIP roof; 11.75 ICF around slab, R-20 rigid foam under slab; radiant floor heat and passive design; air-to-water heatpump, fresh air intake with fan, triple-pane windows, 100% LED.

Building America↗

Comparison of Inversion (“flipping”) Rates Among Different Port Designs: A Single-Center Experience

PurposeTo compare incidence of port inversion among different types of implantable venous access devices.Materials and Methods Records of patients who underwent imaging-guided subcutaneous port placement without port fixation between July 2001 and April 2015 were reviewed with use of a quality assurance database. 1930 patients with complete follow-up (death or explant) were included in the study. Collected data included date and indication for port placement, port type, venous access site, immediate and long-term complications, indication for removal, and total number of catheter days. BMI of patients with inverted ports was also calculated.Results Port inversion within the pocket was observed in 18 patients (0.9%) including 7/82 (9%) of Dignity ports, 4/126 (3%) of Vaxcel plastic arm ports, 3/142 (2%) of Smartports, 2/100 (2%) of Powerports, 1/14 (7%) of Vaccess ports, and 1/1421 (0.07%) of Vortex LP ports. Among these designs, the inversion rate was significantly lower in Vortex LP ports (0.1%) (P < 0.05). There was a trend toward higher inversion rate of Dignity ports, which have a rectangular design with a relatively narrow base. Mean dwell in inverted ports was 114 days (7–580).Conclusion The incidence of port inversion without suture fixation of the port base to the pocket is extremely low. The present study shows differences in inversion incidence based on port design.Level of Evidence: Case Series, Level IV.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Hydrogen Infrastructure Analysis for the Port Applications [Slides]

The International Maritime Organization has committed to 50% reduction in GHG emissions by 2050 worldwide as of 2023. This analysis includes performing an inventory and modeling efforts to understand the energy, equipment and cost requirements to support decarbonization of cargo handling and shore power at U.S. Ports, along with assessment of zero- and near- zero emission fuel supplies at or near U.S. ports focused upon Hydrogen technologies. Initial market assessment for ocean going vessels for harbor support and ocean-going vessels is explored. An energy analysis is performed on the port system using a holistic approach and considering the port as an entire ecosystem that functions as a transportation and energy node. Presently, a comprehensive view is lacking for future analysis efforts, this analysis seeks to address this gap in data by evaluating four representative port types and the potential for utilizing hydrogen for the maritime industry. Every port is different, but broadly they could be bracketed into reference cases with scaling factors for the relative size of the port operations. These reference ports are for future use, potentially as baselines for analysis and development of demonstration programs. An equipment inventory for each reference port type (container, bulk, breakbulk, and inland waterway) is presented. A comparative analysis of fuel cell electric and battery electric equipment is conducted based on the following criteria: technology readiness level, refueling/charging time, operational range, energy consumption, and fuel cost savings compared to baseline internal combustion engine equipment. The tradeoffs and synergies between two alternative powertrains is highlighted. Based on energy and infrastructure analysis, average and high equipment utilization profiles across different port types is identified and quantified baseline fuel and electricity demand for various decarbonization scenarios. Based on the portfolio of equipment converted to fuel cell electric, the estimates of initial capital investment are provided for hydrogen refueling stations across ports. An energy demand model is developed that predicts well the all-electric cargo handling equipment annual energy consumption for ports with annual tonnage under 2 million twenty-foot equivalent units (TEUs). The model is a good rubric to follow for further energy demand models that can create a scalable solution to understand the energy needs of cargo handling equipment, whether they are all-electric, hydrogen fuel cell, or powered by another fuel-type. Zero and near-zero emission fuel supply at ports is evaluated looking into the characteristics of hydrogen, ammonia, and methanol as an alternative fuel, as well as the bunkering status. The readiness of reference ports to produce ammonia or methanol and bunker the fuel is examined based on the framework developed by the Global Maritime Forum and Rocky Mountain Institute.

08 HYDROGEN↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗

Small Nuclear Reactors for Maritime Ports

Maritime ports are entering a period of sharply rising electricity demand as operations are electrified, shore power adoption grows, and energy-intensive industries expand near ports. This report evaluates the feasibility of small nuclear reactors at U.S. ports, which could offer stable baseload power and reduced dependence on regional grids. The report describes the current state of advanced reactor technologies and other factors important for future deployment such as safety and operations, siting requirements, regulatory environments and policy, and other co-benefit considerations. A structured evaluation across a diverse group of U.S. ports highlights the wide variation in feasibility. Fifteen ports were analyzed through port interviews and data collection to assess the port-specific conditions that most impact advanced reactor deployment. The analysis found that the most feasible ports for deployment have favorable geotechnical stability, supportive regulatory environments, and substantial energy loads in a grid-constrained environment. Additionally, an initial reactor size matching was done for the ports based on their reported energy consumption across different modes of operation. However, further analysis and detailed data will be required in the future to determine the optimal reactor-port matching. The economic viability to adopt this technology will be dictated by competitive cost of nuclear-generated electricity compared to other alternatives. Overall, small nuclear reactors present a promising but highly site-dependent pathway for ports seeking resilient, high-capacity energy solutions that support future energy demands. This report identifies key areas for future research and highlights ports that warrant further evaluation to assess the viability of small nuclear reactor implementation. By establishing these priorities, the analysis provides support for the development of informed strategies for potential advanced nuclear technology deployment. The inclusion of ports in this report does not imply their endorsement of nuclear energy generation, and the authors are grateful for the information, expertise, and perspectives they contributed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Utility of a Small Pressurized Rover with Suit Ports for Lunar Exploration: A Geologist's Perspective

Rover trade study: As summarized recently, mission simulations at Black Point Lava Flow (Arizona) that included realistic extravehicular activity (EVA) tasking, accurate traverse timelines, and an in-loop science CAPCOM (or SciCOM) showed that a small pressurized rover (SPR) was a better mobility asset than an unpressurized rover (UPR). Traverses within the SPR were easier on crew than spending an entire day in a spacesuit, enhancing crew productivity at each station. The SPR, named Lunar Electric Rover (LER), and sometimes called the Space Exploration Vehicle (SEV), could also provide shelter during a suit malfunction, radiation event, or medical emergency that might occur on the Moon. Intravehicular activity (IVA) capabilities: From within the vehicle, crew could describe and photo-document distant features during drives between stations, as well as in the near-field, directly in front of the LER, providing an ability to begin EVA planning on approach to each outcrop prior to egress. The vehicle can rotate 360º without any lateral movement, providing views in all directions. It has high-visibility windows, a ForeCam, AftCam, port and starboard cameras, docking cameras, and a GigaPan camera. EVA capabilities: To reduce timeline, mass, and volumetric overhead, rapid egress and ingress were envisioned, replacing an airlock with lower cabin pressure than on the International Space Station and suit ports on the aft cabin wall [2]. When needed for closer inspection and sample collecting, crew could egress in about 10 minutes through suit ports. Crew use SuitCams for additional photo-documentation, transmit mobile observations verbally, and collect surface materials. Typical simulations involved 3 to 4 EVA stations/day and 2 to 3 hr/day of boots on the ground. This allowed crew to explore a far larger territory, with more complex geological and in situ resource utilization (ISRU) features, than would a single, longer-duration EVA at one location, while also minimizing crew time in a spacesuit. Additionally, the vehicle could be driven with crew locked into the suit ports. This approach could involve a driver in the cockpit with a suited crewmember in a suit port, or the vehicle could be driven from the aft deck with both crewmembers in their suit ports. This approach was used when distances between stops were short enough that vehicle ingress and egress were less efficient than remaining in the suits and driving. Utility of suit ports: The advantages of suit ports were clearly demonstrated in those field-based trade studies. To illustrate those advantages further, consider the consequences of a SPR without suit ports at the Apollo 17 landing site. At that site, the crew's second EVA was an approximately 18 km loop conducted in a UPR, called the Lunar Roving Vehicle (LRV), in 7 hr 36 min 56 s. The traverse was composed of 5 formal stations, plus 8 additional LRV stations where crew made brief scientific stops. In a scenario involving a SPR without suit ports, crew would go EVA through an airlock and probably be limited to a single EVA per day. In that case, crew could drive the SPR ~9 km from the landing site to station 2, go EVA, and complete station 2 tasks. However, to conduct station 3 tasks, the crew would then need to walk approximately 3 km to station 3, while ground control in Houston tele-robotically drives the LER to station 3. A walk of approximately 3 km is possible, as that is what the Apollo 14 crew did before LRVs were deployed, but it is a lengthy and potentially grueling EVA. Assuming crew completes station 3 tasks, they would likely need to re-enter the SPR, ending the day's EVA, and return to the landing site. They would not be able to walk the additional distances to stations 4 and 5 (the latter being about 6 km from station 3). Thus, crew in an SPR without suit ports would require two days to accomplish the same tasks Apollo 17 crew completed in a single day. If a future crew is involved in long duration traverses on the lunar surface, the deployment of a vehicle with suit ports would probably be a better solution.

Kring, David A.↗